Solibri case study: Copenhagen Airport

1290

Copenhagen Airport has around 100 projects every year to accommodate the needs of increasing number of passengers. With the help of BIM and Solibri, the quality of the projects has improved – in addition to achieving generous cost savings

“Our strategy is to have one airport that has all the terminals and piers under one roof. We are increasing the capacity of the existing buildings and areas to accommodate the rise in the number of passengers and improve the passenger experience. Due to this, we have around 100 different projects every year,” explains Michael Ørsted, the head of department technical knowledge at Copenhagen Airport.

Turning quality assurance standards into rules

“We are trying to offer a better tool for our asset managers to ensure better quality, for all the building projects we have here at Copenhagen Airport.

“We were used to using Solibri in our projects for clash detection and consistency checks, so it was a natural choice for us to start using it more. Now we are automating quality checks in Solibri by creating the asset managers’ quality assurance standards into rules and use them to check all the models,” Michael elaborates.

“We are handing out these rulesets through our website to all the participants in the projects. It allows our asset managers to demand that these rules are being used by all the stakeholders. This means that the errors should be found by the construction and engineering teams at an early stage, instead of the asset managers discovering them later. This has also improved collaboration between all the different teams and given us a way to make sure every demand from the operations is considered early on,” Michael explains.

Finding issues early leads to significant cost savings

“There was a baggage handling project where we needed to make sure that large equipment could fit into a technical room and elevator system. When we did the checking in this project, we could see that the access to the technical room was okay, the access to the elevator was also okay, but on the way from the elevator to the technical room, we noticed that the path was actually too narrow in one corner.

“Our asset managers wouldn’t have been able to find this problem without Solibri. It would have cost us a lot of money to fix that afterwards, if we hadn’t found it so early in the engineering stage.”

“Another example is a project where we found that one of the accessible toilets was not the right size. By using Solibri we then noticed that actually every accessible toilet had the same problem, not just that one instance which the asset manager could find from the 2D drawings.”

“Our engineering team has calculated that we have saved more than 400.000 euros in this project, by finding issues that we wouldn’t have recognised before. The external contractors are motivated to use the system, because after all they want to handover projects that are compliant with our needs and have the discussions about whether or not to take actions on findings that they have.”

“Improved collaboration and €400,000 in cost savings”

Solibri | Case Copenhagen Airport

 

*Please note this is a commercial profile.

Editor's Picks

Best BIM Software Providers

LEAVE A REPLY

Please enter your comment!
Please enter your name here