Keeping Out the Cold

1696

The winter chill has finally set in and for owners of older, solid walled properties, the effects will be particularly keenly felt. Just 3% of these properties are insulated in the UK according to the latest Government statistics[1] leaving owners with an unenviable choice of digging deep into their pockets to pay for heating bills, or going without and facing the cold.

However, developments in both insulation performance and the expertise of installers means that it is no longer necessary to accept this as an unavoidable annual tradition. The Energy Savings Trust (EST) recently carried out a comprehensive study of 36 hard-to-treat existing dwellings in England to quantify the energy-efficiency benefits that can be achieved by upgrading Solid Wall Insulation (SWI) levels.

Case Study:

This study focuses on the results from two properties in Lancashire; one in the seaside town of Morecambe and one in the market town of Burnley, which were upgraded using premium performance rigid thermoset phenolic internal wall insulation (IWI) with a plasterboard finish and an integral vapour control layer.  In both cases the IWI was installed with due care and attention to detailing around joints, openings and junctions by experienced dry-lining operatives, employed by Mansell Projects Ltd, a reputable contractor with a long history in professional dry-lining.

The property in Morecambe was a pre-1900, two storey end-terrace dwelling with 500 mm thick stone walls. The owners preferred IWI over external wall insulation since they did not want the rustic stone façade to be concealed. Furthermore, the dwelling was situated in a conservation zone, which may have made the granting of planning permission for works to the exterior of the property more difficult. The retrofit was completed without the owners having to leave their home, allowing them to be involved in decisions about both the finish and aesthetics of the work.

The selected system was the Kingspan Kooltherm K18 Insulated Dry-Lining System: comprising 92.5 mm thick Kingspan Kooltherm K18 Insulated Plasterboard and a range of ancillary fixing components that satisfy stringent performance specification requirements.

Wall U-value calculations provided an excellent 83% improvement in the thermal performance of the treated walls. The build-up enabled the achievement of a final U-value of 0.215 W/m2.K, which comfortably exceeds the target performance outlined in Approved Document L1B.

The EST monitoring program at the house revealed a 20% saving in normalised annual gas consumption for primary space heating. Although auxiliary heating was provided by a dual fuel fire, which was later confirmed as being the main heat source for the ground floor living space, its contribution could not be measured, so the true savings are potentially even greater.

The gas usage in the pre-insulation period was constant throughout the day, whereas morning and afternoon heating in the post-insulation period was almost entirely absent. This indicates that the alleviation of heat loss resulting from the improved thermal performance of the walls had enabled the owners to maintain comfortable daytime temperatures without additional heating.

The property in Burnley was a pre-1900, 3-storey mid-terrace also with 500 mm thick stone walls.  The area surrounding the property was part of an ongoing renewal project (a property “face-lifting” scheme in Burnley) and so external works were restricted. IWI was therefore the preferred option.

The same dry-lining system was installed by Mansell Projects, incorporating 92.5 mm thick Kingspan Kooltherm K18 Insulated Plasterboard mechanically fixed to 25 x 50 mm pre-treated timber battens, lined with 100 mm wide DPC strips. This provided a U-value of 0.18 W/m2·K – an outstanding result for an insulated solid wall, demonstrating a significant improvement of 89% over the original performance, the level of airtightness was also improved by a considerable 57%.

The effectiveness of the system is highlighted in the thermal images taken after the installation, particularly at junction locations where the cold regions appear to have been minimised. This, combined with the reduced air-leakage, emphasises the positive impact of superior installation practice and good detailing.

A study of the heating behaviour patterns at the property indicated that the increased thermal efficiency of the building envelope has enhanced its ability to retain heat and enabled a reduction in both the intensity and duration of heating events to achieve the desired temperature.

Following the installation the results at the Burnley property have shown an impressive 45% decrease in normalised annual gas consumption for primary space heating, with a corresponding reduction in both CO2 emissions and heating bills for the owners, whilst allowing them to enjoy an increase in average indoor temperature.

Although the results at the property in Morecambe were less dramatic, this was a likely result of the unmonitored auxiliary heating system and level of uncontrolled air-leakage through the roof and floor which were not treated as part of the project; the savings were still sizeable.

The careful attention to detail at junctions and improved airtightness meant that no issues with condensation were identified at either property following the installation.

Looking Long-term

Despite the small percentage of solid walled properties currently insulated, an increasing number of developers and owners are beginning to embrace SWI. The number of total installations increased from just 65,000 in 2008, to 265,000 in June 20141 and as the EST Trial shows, a well-planned installation using premium performance insulation can bring significant lasting benefits.

 

For further information on IWI please go to www.kingspaninsulation.co.uk/iwisystems.

Tel: +44 (0) 1544 387 384

e.mail: literature@kingspaninsulation.co.uk

LEAVE A REPLY

Please enter your comment!
Please enter your name here