{"id":105981,"date":"2022-02-17T15:12:36","date_gmt":"2022-02-17T15:12:36","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=105981"},"modified":"2022-02-17T15:12:36","modified_gmt":"2022-02-17T15:12:36","slug":"wooden-modular-construction","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/","title":{"rendered":"Wooden modular construction selected for 32 Berlin schools"},"content":{"rendered":"<h2>An innovative method of sustainable wooden modular construction has been selected for the building of 32 schools in Berlin by 2025<\/h2>\n<p>6 of these schools have already been constructed and the rest will shortly be underway. One of the schools is made up of almost 100 modules, each 3-m wide and 8-m long.<\/p>\n<p>All of the modules have been prefabricated offsite and assembled on the construction site. Construction is under The Senate Department for Urban Development &amp; Housing and <a href=\"https:\/\/www.metsawood.com\/global\/Products\/kerto\/Pages\/Kerto.aspx\" target=\"_blank\" rel=\"noopener noreferrer\">Mets\u00e4 Wood\u2019s Kerto\u00ae LVL<\/a> beams have been used.<\/p>\n<p>The decision was made by the structural designers to use beams made of the high-performance and easy-to-process GLVL (Glued laminated veneer lumber).<\/p>\n<p>To achieve a column-free floor plan for classrooms, 8-m long lightweight high-performance GLVL beams had to be used at the joint of the modules.<\/p>\n<p>Sebastian Hagspiel, project manager at Kaufmann Bausysteme elucidates: &#8220;For structural reasons, glulam was not suitable for this project. Steel beams were also not a solution for us or the architects.&#8221;<\/p>\n<h3>Wooden modular construction: fast and economical<\/h3>\n<p>Wooden <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/raf-lossiemouth\/105574\/\" target=\"_blank\" rel=\"noopener noreferrer\">modular construction<\/a> is <a href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-schools-concept-to-reality\/93106\/\" target=\"_blank\" rel=\"noopener noreferrer\">sustainable<\/a>, cost-effective and quick, so it comes as no surprise that Berlin is opting for these prefabricated wood-based modules.<\/p>\n<p>Berlin is keen to become the world&#8217;s major metropolis for wooden <a href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-assemblies\/104630\/\" target=\"_blank\" rel=\"noopener noreferrer\">modular construction<\/a>\u00a0or at least one of them. Right now, three-storey wooden schools are being built in Berlin by Austrian prefabrication constructor <a href=\"https:\/\/kaufmannbausysteme.at\/de\/\" target=\"_blank\" rel=\"noopener noreferrer\">Kaufmann Bausysteme<\/a> (KBS).<\/p>\n<p>&#8220;6 schools have already been built and a total of 32 schools are to be built by 2025. The speed of the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-construction-management\/94327\/\" target=\"_blank\" rel=\"noopener noreferrer\">offsite construction method was a decisive factor<\/a>. With the prefabricated wooden modules, the construction time can be halved&#8221; explains Hagspiel.<\/p>\n<h3>&#8216;LVL is stronger in strength-to-weight ratio than steel&#8217;<\/h3>\n<p>The GLVL was manufactured by Holzwerke Bullinger using Mets\u00e4 Wood\u2019s Kerto LVL.<\/p>\n<p>Ingo Faller from Bullinger\u2019s sales department describes the process as efficient: &#8220;We have updated our standard glulam process so that we can use LVL beams. The GLVL beams have a high bending strength.<\/p>\n<p>&#8220;In the GLVL process, laminated veneer lumber (LVL) beams are glued together. Compared to glulam, LVL is uniform in quality and therefore has an extremely high static load-bearing capacity.<\/p>\n<p>&#8220;As a result, GLVL beams have a much higher flexural strength. Interestingly,\u00a0 LVL is stronger in strength-to-weight ratio than steel.\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>An innovative method of sustainable wooden modular construction has been selected for the building of 32 schools in Berlin by 2025.<\/p>\n","protected":false},"author":23,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[594,676,3649,916,627,696,915],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-105981","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-building-design","8":"tag-construction","9":"tag-education","10":"tag-modern-methods-of-construction","11":"tag-modular-construction","12":"tag-offsite-construction","13":"tag-timber"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Wooden modular construction selected for 32 Berlin schools<\/title>\n<meta name=\"description\" content=\"An innovative method of sustainable wooden modular construction has been selected for the building of 32 schools in Berlin by 2025\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wooden modular construction selected for 32 Berlin schools\" \/>\n<meta property=\"og:description\" content=\"An innovative method of sustainable wooden modular construction with an extremely short construction turnaround has been selected for 32 Berlin schools\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-17T15:12:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/02\/Kaufmann-Bausysteme.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"747\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Freya Thomson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Wooden modular construction selected for 32 Berlin schools\" \/>\n<meta name=\"twitter:description\" content=\"An innovative method of sustainable wooden modular construction with an extremely short construction turnaround has been selected for 32 Berlin schools\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\"},\"author\":{\"name\":\"Freya Thomson\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/7c27d9b0f85cde2648d8cecbd653750f\"},\"headline\":\"Wooden modular construction selected for 32 Berlin schools\",\"datePublished\":\"2022-02-17T15:12:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\"},\"wordCount\":376,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Building Design\",\"Construction Processes\",\"Education Facilities\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\",\"Timber\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#respond\"]}],\"copyrightYear\":\"2022\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\",\"name\":\"Wooden modular construction selected for 32 Berlin schools\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2022-02-17T15:12:36+00:00\",\"description\":\"An innovative method of sustainable wooden modular construction has been selected for the building of 32 schools in Berlin by 2025\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wooden modular construction selected for 32 Berlin schools\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/7c27d9b0f85cde2648d8cecbd653750f\",\"name\":\"Freya Thomson\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d68aaed5c7b29ada220d4eac5c1e8fd78175f55c17ba8e769f49fd09834328b9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d68aaed5c7b29ada220d4eac5c1e8fd78175f55c17ba8e769f49fd09834328b9?s=96&d=mm&r=g\",\"caption\":\"Freya Thomson\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/freyathomson\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Wooden modular construction selected for 32 Berlin schools","description":"An innovative method of sustainable wooden modular construction has been selected for the building of 32 schools in Berlin by 2025","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/","og_locale":"en_US","og_type":"article","og_title":"Wooden modular construction selected for 32 Berlin schools","og_description":"An innovative method of sustainable wooden modular construction with an extremely short construction turnaround has been selected for 32 Berlin schools","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2022-02-17T15:12:36+00:00","og_image":[{"width":1600,"height":747,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/02\/Kaufmann-Bausysteme.jpg","type":"image\/jpeg"}],"author":"Freya Thomson","twitter_card":"summary_large_image","twitter_title":"Wooden modular construction selected for 32 Berlin schools","twitter_description":"An innovative method of sustainable wooden modular construction with an extremely short construction turnaround has been selected for 32 Berlin schools","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/"},"author":{"name":"Freya Thomson","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/7c27d9b0f85cde2648d8cecbd653750f"},"headline":"Wooden modular construction selected for 32 Berlin schools","datePublished":"2022-02-17T15:12:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/"},"wordCount":376,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Building Design","Construction Processes","Education Facilities","Modern Methods of Construction","Modular Construction","Offsite Construction","Timber"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#respond"]}],"copyrightYear":"2022","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/","name":"Wooden modular construction selected for 32 Berlin schools","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2022-02-17T15:12:36+00:00","description":"An innovative method of sustainable wooden modular construction has been selected for the building of 32 schools in Berlin by 2025","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wooden-modular-construction\/105981\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Wooden modular construction selected for 32 Berlin schools"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/7c27d9b0f85cde2648d8cecbd653750f","name":"Freya Thomson","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d68aaed5c7b29ada220d4eac5c1e8fd78175f55c17ba8e769f49fd09834328b9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d68aaed5c7b29ada220d4eac5c1e8fd78175f55c17ba8e769f49fd09834328b9?s=96&d=mm&r=g","caption":"Freya Thomson"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/freyathomson\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-06 15:12:48","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/105981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=105981"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/105981\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=105981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=105981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=105981"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=105981"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=105981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}