{"id":114817,"date":"2022-08-30T15:33:54","date_gmt":"2022-08-30T14:33:54","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=114817"},"modified":"2022-08-30T15:33:54","modified_gmt":"2022-08-30T14:33:54","slug":"work-underway-on-green-steelmaking-project-at-north-east-facility","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/","title":{"rendered":"Work underway on green steelmaking project at North East facility"},"content":{"rendered":"<h2>CMS is installing hydrogen pipeline systems at the Materials Processing Institute, in the initial phase of a project exploring the capabilities of green steelmaking<\/h2>\n<p><a href=\"https:\/\/www.cmsltd.co.uk\/sectors\/industrial\" target=\"_blank\" rel=\"noopener noreferrer\">Commercial Maintenance Services<\/a> UK Ltd (CMS) is currently installing the infrastructure as part of the development of a proposed permanent national pilot distribution and production facility at the Materials Processing Institute\u2019s Teesside campus, which aims to explore the potential of green steelmaking.<\/p>\n<p>CMS was engaged to undertake the design, manufacture and installation of the \u00a3270,000 pipework.<\/p>\n<h3>Carbon-free hydrogen can be used at multiple points in a green steelmaking process<\/h3>\n<p>The use of carbon-free \u2018green\u2019 hydrogen could <a href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/decarbonising-construction-2\/100961\/\" target=\"_blank\" rel=\"noopener noreferrer\">transform the steel industry, one of the largest contributors to carbon dioxide emissions<\/a>, by replacing coke and other polluting fossil fuels that are currently used to power furnaces and convert iron ore to iron metal.<\/p>\n<p>Hydrogen will be used to fuel three phases of the steel-making process: converting iron ores into metal (which is then melted electrically to make molten steel), pre-heating a seven-tonne capacity ladle ready to receive the molten steel, and later on providing the intense high-temperature flames needed to reheat slabs of metal before forming them into finished products.<\/p>\n<p>The specially hardened pipework is designed to cope with the high pressures associated with hydrogen.<\/p>\n<p>In addition, all welds have been x-rayed as part of a rigorous non-destructive testing process to ensure there are no weaknesses.<\/p>\n<p>Following its installation over and underground, it is attached to a manifold and controls system before the hydrogen can be fed into several buildings, facilities and processes within the campus.<\/p>\n<h3>The hydrogen steel pilot production facility is part of the government\u2019s net zero ambitions<\/h3>\n<p>The initial part of the project, codenamed H2DRI, will focus on how production can be scaled up and will build practical and scientific understanding on how best to deliver economically and environmentally sustainable green steelmaking.<\/p>\n<p>Part of the government\u2019s <a href=\"https:\/\/www.gov.uk\/government\/collections\/net-zero-innovation-portfolio\" target=\"_blank\" rel=\"noopener noreferrer\">Net Zero Innovation Portfolio<\/a> Industrial Fuel Switching Competition that funds low carbon technologies and systems, the project is led by the Institute in partnership with C-Tech Innovation, Teesside University, the Steel and Metals Institute at Swansea University, and global metals and mining company Rio Tinto.<\/p>\n<p>Nigel Riley, senior project manager at Gateshead-headquartered CMS, said: \u201cWe are proud to be supporting the Institute on such an important initiative. Our engineers are highly experienced at working across a range of sectors, including industrial, defence, commercial, and public sector, but this is one of the most far-reaching projects to date, given it has the potential to transform the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/russia-ukraine-war-uk-steel-prices\/107530\/\" target=\"_blank\" rel=\"noopener noreferrer\">steel industry<\/a> and cut harmful emissions.\u201d<\/p>\n<p>Chris McDonald, chief executive of the Materials Processing Institute, added: \u201cIt\u2019s exciting to see work progressing on the H2DRI project and in creating a pilot production facility that will be pivotal into proving hydrogen is the answer to decarbonising steel production on an industrial scale. Our new hydrogen infrastructure also opens the door to all sorts of other innovation scale-ups on Teesside.\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>CMS is installing hydrogen pipeline systems at the Materials Processing Institute, in the initial phase of a project exploring the capabilities of green steelmaking. <\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[676,673,93645,431,32292,26264,701],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-114817","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-construction","8":"tag-energy","9":"tag-net-zero","10":"tag-plant-equipment-supplies","11":"tag-steel","12":"tag-steel-frame-construction","13":"tag-supply-chain"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Work underway on green steelmaking project at North East facility<\/title>\n<meta name=\"description\" content=\"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, as part of a project exploring the capabilities of green steelmaking\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work underway on green steelmaking project at North East facility\" \/>\n<meta property=\"og:description\" content=\"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, in the initial phase of a project exploring the capabilities of green steelmaking\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-30T14:33:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/08\/CMS.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1331\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harriet Clough\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Work underway on green steelmaking project at North East facility\" \/>\n<meta name=\"twitter:description\" content=\"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, in the initial phase of a project exploring the capabilities of green steelmaking\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/08\/CMS.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\"},\"author\":{\"name\":\"Harriet Clough\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\"},\"headline\":\"Work underway on green steelmaking project at North East facility\",\"datePublished\":\"2022-08-30T14:33:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\"},\"wordCount\":499,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Construction Processes\",\"Energy Sector\",\"Net zero\",\"Plant Equipment &amp; Supplies\",\"Steel\",\"Steel Frame Construction\",\"Supply Chain\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#respond\"]}],\"copyrightYear\":\"2022\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\",\"name\":\"Work underway on green steelmaking project at North East facility\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2022-08-30T14:33:54+00:00\",\"description\":\"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, as part of a project exploring the capabilities of green steelmaking\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work underway on green steelmaking project at North East facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\",\"name\":\"Harriet Clough\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"caption\":\"Harriet Clough\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Work underway on green steelmaking project at North East facility","description":"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, as part of a project exploring the capabilities of green steelmaking","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/","og_locale":"en_US","og_type":"article","og_title":"Work underway on green steelmaking project at North East facility","og_description":"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, in the initial phase of a project exploring the capabilities of green steelmaking","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2022-08-30T14:33:54+00:00","og_image":[{"width":2000,"height":1331,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/08\/CMS.jpg","type":"image\/jpeg"}],"author":"Harriet Clough","twitter_card":"summary_large_image","twitter_title":"Work underway on green steelmaking project at North East facility","twitter_description":"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, in the initial phase of a project exploring the capabilities of green steelmaking","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/08\/CMS.jpg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/"},"author":{"name":"Harriet Clough","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356"},"headline":"Work underway on green steelmaking project at North East facility","datePublished":"2022-08-30T14:33:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/"},"wordCount":499,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Construction Processes","Energy Sector","Net zero","Plant Equipment &amp; Supplies","Steel","Steel Frame Construction","Supply Chain"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#respond"]}],"copyrightYear":"2022","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/","name":"Work underway on green steelmaking project at North East facility","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2022-08-30T14:33:54+00:00","description":"CMS is installing hydrogen pipeline systems at the Materials Processing Institute, as part of a project exploring the capabilities of green steelmaking","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/work-underway-on-green-steelmaking-project-at-north-east-facility\/114817\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Work underway on green steelmaking project at North East facility"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356","name":"Harriet Clough","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","caption":"Harriet Clough"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-27 07:45:48","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/114817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=114817"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/114817\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=114817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=114817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=114817"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=114817"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=114817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}