{"id":115651,"date":"2022-09-16T11:42:37","date_gmt":"2022-09-16T10:42:37","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=115651"},"modified":"2022-10-10T11:44:01","modified_gmt":"2022-10-10T10:44:01","slug":"unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/","title":{"rendered":"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London"},"content":{"rendered":"<h2>A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works<\/h2>\n<p>The <a href=\"https:\/\/www.gov.uk\/government\/publications\/building-safety-programme-monthly-data-release-august-2022\" target=\"_blank\" rel=\"noopener noreferrer\">Building Safety Programme Monthly Data Release<\/a> from the Department of Levelling up, Housing and Communities has shown that there are still over 300 high-rise buildings with incomplete unsafe cladding removal works, five years after the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/time-for-change-will-the-grenfell-tower-fire-prove-constructions-piper-alpha-moment\/114004\/\" target=\"_blank\" rel=\"noopener noreferrer\">Grenfell Tower fire.<\/a><\/p>\n<p>Most high-rise buildings with Aluminium Composite Material (ACM) cladding systems that still do not meet existing standards and no ongoing remedial works are concentrated around urban centres in England, particularly in Manchester (72) and Greater London (272).<\/p>\n<h3>At the end of August 2022, 462 identified high-rise residential and publicly owned buildings in England had either completed or started remediation work<\/h3>\n<p>Remediation is fully complete for 178 buildings in London (65% of all buildings identified in London), 45 buildings in Greater Manchester (63%), and 117 buildings in the Rest of England (82%).<\/p>\n<p>Of the high-rise buildings with ACM cladding remaining, 24 have started remediation. Of the 24 (5%) buildings <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/cladding-indemnity-the-case-for-industry-transparency\/115540\/\" target=\"_blank\" rel=\"noopener noreferrer\">yet to start unsafe cladding removal<\/a>, two are vacant(so do not represent an immediate risk to resident safety), and 14 additional buildings were later identified after the initial numbers were calculated in 2020.<\/p>\n<p>Overall, there are 272 high-rise residential and publicly owned buildings in London identified with ACM cladding systems that the data release describes as \u2018unlikely to meet building regulations\u2019; 72 in Greater Manchester and 142 in the rest of England.<\/p>\n<h3>What funding exists to pay for the remediation works?<\/h3>\n<p>The government has made up to \u00a3600m available for the remediation of unsafe ACM on social and private sector residential buildings 18 metres or over through the Social and Private Sector ACM Cladding Remediation Funds.<\/p>\n<p>254 buildings are receiving or have received funding for their remediation from these funds.<\/p>\n<p>The government also created the Waking Watch Fund, which <a href=\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/the-cladding-crisis\/104440\/\" target=\"_blank\" rel=\"noopener noreferrer\">pays for alarms to be installed<\/a> in high-rise residential buildings with unsafe cladding.<\/p>\n<p>Of the \u00a335m of funding available, as of August 2022 \u00a327.4m has been approved to enable Waking Watch measures in 321 buildings, or an estimated 24,800 leasehold dwellings. Of these approved buildings, 278 have completed alarm installations.<\/p>\n<h3>The Building Safety Act 2022 offers protection to residents from the expense of unsafe cladding removal works<\/h3>\n<p>The Building Safety Act, which became law in April 2022, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/building-safety-act-2022-offers-leaseholder-protections\/112351\/\" target=\"_blank\" rel=\"noopener noreferrer\">protects residents and leaseholders living in their apartments from the cost<\/a> of taking dangerous cladding off high-rise buildings. \u00a35.1bn has been allocated by the Government towards this aim, prioritizing the highest risk cases first.<\/p>\n<p>In January, the DLUHC outlined a four-point plan aiming to revitalise the Government&#8217;s approach to unsafe housing, including naming and shaming companies at fault, making them fix the buildings they built and face commercial consequences if they refuse.<\/p>\n<p>The next data release from DLUHC will be on the 13 October 2022.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works. <\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[306],"tags":[568,897,276,795,656,947,17747,753],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-115651","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-building-control-news","7":"tag-building-regulations","8":"tag-cladding","9":"tag-government","10":"tag-grenfell-tower","11":"tag-housing","12":"tag-london","13":"tag-manchester","14":"tag-safety"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Unsafe cladding removal still incomplete on 300 buildings across England<\/title>\n<meta name=\"description\" content=\"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London\" \/>\n<meta property=\"og:description\" content=\"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-16T10:42:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-10T10:44:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/09\/dreamstime_xxl_179833299.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1127\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harriet Clough\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London\" \/>\n<meta name=\"twitter:description\" content=\"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/09\/dreamstime_xxl_179833299.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\"},\"author\":{\"name\":\"Harriet Clough\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\"},\"headline\":\"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London\",\"datePublished\":\"2022-09-16T10:42:37+00:00\",\"dateModified\":\"2022-10-10T10:44:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\"},\"wordCount\":457,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Building Regulations\",\"Cladding\",\"Government Policy\",\"Grenfell Tower\",\"Housing system\",\"London\",\"Manchester\",\"Safety\"],\"articleSection\":[\"Building Control News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#respond\"]}],\"copyrightYear\":\"2022\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\",\"name\":\"Unsafe cladding removal still incomplete on 300 buildings across England\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2022-09-16T10:42:37+00:00\",\"dateModified\":\"2022-10-10T10:44:01+00:00\",\"description\":\"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\",\"name\":\"Harriet Clough\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"caption\":\"Harriet Clough\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Unsafe cladding removal still incomplete on 300 buildings across England","description":"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/","og_locale":"en_US","og_type":"article","og_title":"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London","og_description":"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works","og_url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2022-09-16T10:42:37+00:00","article_modified_time":"2022-10-10T10:44:01+00:00","og_image":[{"width":2000,"height":1127,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/09\/dreamstime_xxl_179833299.jpg","type":"image\/jpeg"}],"author":"Harriet Clough","twitter_card":"summary_large_image","twitter_title":"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London","twitter_description":"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/09\/dreamstime_xxl_179833299.jpg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/"},"author":{"name":"Harriet Clough","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356"},"headline":"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London","datePublished":"2022-09-16T10:42:37+00:00","dateModified":"2022-10-10T10:44:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/"},"wordCount":457,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Building Regulations","Cladding","Government Policy","Grenfell Tower","Housing system","London","Manchester","Safety"],"articleSection":["Building Control News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#respond"]}],"copyrightYear":"2022","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/","url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/","name":"Unsafe cladding removal still incomplete on 300 buildings across England","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2022-09-16T10:42:37+00:00","dateModified":"2022-10-10T10:44:01+00:00","description":"A DLUHC data release has disclosed that five years after Grenfell, there are still 300 high-rise buildings with incomplete unsafe cladding removal works","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/unsafe-cladding-removal-works-still-incomplete-on-over-300-high-rise-buildings-in-manchester-and-london\/115651\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Unsafe cladding removal works still incomplete on over 300 high-rise buildings in Manchester and London"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356","name":"Harriet Clough","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","caption":"Harriet Clough"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-05 18:44:48","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/115651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=115651"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/115651\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=115651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=115651"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=115651"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=115651"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=115651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}