{"id":119436,"date":"2022-12-14T14:08:35","date_gmt":"2022-12-14T14:08:35","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=119436"},"modified":"2022-12-14T14:08:35","modified_gmt":"2022-12-14T14:08:35","slug":"sustainable-action-not-fast-enough-sustainable-futures-report-finds","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/","title":{"rendered":"Sustainable action not fast enough, Sustainable Futures Report finds"},"content":{"rendered":"<h2>As the conversation around sustainability in the construction sector heats up, the NBS Sustainable Futures report has discovered that 15% of construction professionals believe their organisations are likely to miss the 2050 net zero deadline. Lee Jones, head of manufacturing solutions at NBS, explains<\/h2>\n<p><em>\u00a0<\/em>The carbon impact of construction is a long-standing issue yet only in recent years has it started to get the attention it deserves. Accountable for 40% of all CO2 emissions, it\u2019s now essential that we work more sustainably \u2013 and with haste. However, looking at the results from NBS\u2019s<a href=\"https:\/\/www.thenbs.com\/sustainable-futures-report-2022\/\" target=\"_blank\" rel=\"noopener noreferrer\"> Sustainable Futures report<\/a>, it\u2019s clear that significant progress is still needed.<\/p>\n<p>In fact, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/nbs-sustainable-futures-report-sustainable-construction-goals\/108710\/\" target=\"_blank\" rel=\"noopener noreferrer\">according to the study<\/a>, despite three-quarters of respondents saying they\u2019re personally frustrated that they can\u2019t do more to achieve sustainability, around 15% said that their company won\u2019t make the expected 2050 net zero target. A further 29% are treating this as a long-term goal.<\/p>\n<h3>Breaking barriers preventing lower carbon outcomes<\/h3>\n<p>The main barrier identified was a lack of demand from clients. 52% said this was the primary cause, yet we should refrain from placing the blame solely on clients; as construction professionals, it\u2019s our job to guide and advise clients towards increased sustainability measures where possible.<\/p>\n<p>The cost of achieving sustainability followed close behind (51%), just one percent lower. When considering sustainability, some built environment professionals fail to take into account the whole lifecycle of a building, including its operational phase. Furthermore, if considered in the early stages, many sustainable outcomes can be factored in without significant financial impact.<\/p>\n<p>Other views included: \u201cThat it (sustainability) is a tick box exercise, or something that can be added on at later stages\u201d and \u201cThat the climate crisis &#8216;isn&#8217;t too bad&#8217; and can be fixed by one thing (that someone else will do)\u201d. Whilst it\u2019s true that this doesn\u2019t reflect the majority of those in the construction industry it could shed some concerning light into misconceptions that may exist in the industry and be a reason for why sustainability isn\u2019t being pushed with clients on the level it should be.<\/p>\n<p>Another concern highlighted in the Sustainable Futures report was the view that sustainable products are being \u2018value engineered\u2019 out of projects (38%). This raises an interesting point \u2013 and highlights the need for measures that ensure that products aren\u2019t being specified simply to fit budget constraints.<\/p>\n<p>37% of respondents also noted that a lack of government policy and regulation was another reason sustainability isn\u2019t included, highlighting the power and influence that more stringent environmental legislation would have on construction professionals.<\/p>\n<h3>A difference of opinion<\/h3>\n<p>There will always be some barriers that affect some project roles more than others. Perhaps unsurprisingly, for contractors, it was contractual risks that were proving to be an issue. Given what we\u2019ve seen over the past few months in terms of limited building supplies, faltering supply chains and rising material costs, it\u2019s clear that contractors are cautious about procuring products that may, in theory, cause a project to overrun.<\/p>\n<p>For suppliers, value engineering sustainable products out of projects is a concern. This would suggest that further communication and education with client and contractor stakeholders are needed to help to alleviate concerns and gain a deeper understanding of the product and its performance credentials.<\/p>\n<p>Client-side, they highlighted that a lack of management commitment and sustainable performance information were major obstacles to sustainability not being included in more projects. For project designers and specifiers, increased efforts from suppliers of construction products around the topic could help improve the situation so that more projects can achieve sustainable outcomes.<\/p>\n<h3>It is imperative that companies set sustainability goals and plan for success<\/h3>\n<p>If the UK is to reach net zero within the allotted 2050 timeframe,<a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/11-major-players-cross-industry-sustainable-building-taskforce\/116784\/\" target=\"_blank\" rel=\"noopener noreferrer\"> companies must set goals and plan for success<\/a>. Within the report, NBS wanted to look at whether firms had strategies in place and if they could predict when they are expecting to achieve net-zero status.<\/p>\n<p>Unfortunately, a specific timeframe remained elusive for many, and they decided not to make a prediction. Of the 368 that did respond, the most common answer was between 2026 and 2030, where 30% predicted that they would be net zero between these dates. Whilst this appears surprisingly high, this must be met with scepticism as achieving Net Zero may be confused with achieving carbon neutrality. Yet for further third respondents, Net Zero still remained a long-term goal that will be reached after 2031.<\/p>\n<p>What was most concerning to see was that 5% don\u2019t believe they\u2019ll be able to make the deadline, predicting that they will only achieve the government target after 2050, and one in ten think they will never become net zero at all.<\/p>\n<p>Given that data from the United Nations on climate change states that greenhouse gas emissions need to peak before 2025 at the latest and be reduced by 43% by 2030, it\u2019s clear that current efforts are far too slow given the actions required to combat climate change. If firms are to do their part, wider sustainable strategies must be introduced immediately to ensure emissions deadlines are met.<\/p>\n<h3>The growing demand for detailed product information<\/h3>\n<p>The Sustainable Futures report also looked at the role of building product information within modern specification, which has been proven to deliver lower carbon outcomes and increase levels of safety through comprehensive, clear and unambiguous product data. Sustainability performance information about products is welcomed by professionals \u2013 they just want to see more of it. In fact, nine out of ten users stated that \u2018robust specifications\u2019 were central to achieving sustainable outcomes.<\/p>\n<p>The report also emphasised how specifiers and manufacturers view and prioritise product information. Whilst there was an overlap between both groups in terms of the metrics that they deemed important, the order in which they were ranked showed some stark differences. For example, suppliers placed \u2018country of manufacturer\u2019 as the number one sustainability metric. In contrast, for users of product information, this was only placed at number 5 in their list. When considering carbon costs within a project, where materials are sourced and manufactured can have a large impact through transportation.<\/p>\n<p>Users also placed \u2018product level certification\u2019 as the number one priority, yet for manufacturers, this was placed as number four. Despite the differences in ranking, it highlights the growing need for accreditations and certifications as a mark of quality. By doing so, users of product information can feel comfortable knowing that products have passed third-party testing and quality assurance tests.<\/p>\n<p>Equally, it also highlights the need for manufacturers to be honest, accurate and upfront about the green credentials of their products. The CMA\u2019s Green Claims guide, which aligns quite closely to the requirements of the CCPI, warns to avoid \u2018generic claims\u2019 such as 100% natural\u201d or \u201cenvironmentally friendly\u201d as well as irrelevant claims that aren\u2019t of use in today\u2019s marketplace. Misleading packaging, graphical trickery and ambiguous percentages are also areas to be mindful of when displaying or supplying product information to users.<\/p>\n<p>If the situation is to improve around sustainability, the industry will need to see improved communication between both specifier and manufacturer. By understanding the needs of specifiers to a greater degree, manufacturers can ensure they\u2019re presenting the right levels of detail when it comes to building product criteria. Equally, specifiers have a part to play in letting manufacturers know what information they need in terms of green credentials and product performance.<\/p>\n<h3>The issue of retrofit<\/h3>\n<p>One of the biggest challenges the Sustainable Futures report made obvious was the growing issue of achieving sustainability within existing buildings. Light refurbishment projects are less likely to achieve adequate carbon reduction measures. Again, construction professionals felt strongly that the government needed to play a more central role in tackling this problem. Nine out of ten respondents (89%) felt that government intervention is needed to help existing buildings become net zero.<\/p>\n<p>It will be interesting to see if the chancellor\u2019s decision to slash VAT to 0% on <a href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/retrofit-skills-revolution-ashden\/117973\/\" target=\"_blank\" rel=\"noopener noreferrer\">retrofit work for specific energy-saving home improvements<\/a> has gone far enough to incentivise homeowners and restore the balance against building new.<\/p>\n<p>With such rich results, it\u2019s clear that these types of reports are crucial to helping the industry move forward.\u00a0 What\u2019s now needed is closer collaboration between parties involved in building projects to understand roles and responsibilities better.<\/p>\n<p>We also know that further education on the topic goes hand in hand with more sustainable outcomes. With such a willing workforce ready to achieve a lower carbon future, further learning and knowledge on the subject could be the answer we need to see sustainability success rates improve in the following years.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>As the conversation around sustainability in the construction sector heats up, the NBS Sustainable Futures report has discovered that 15% of construction professionals believe their organisations are likely to miss the 2050 net zero deadline. Lee Jones, head of manufacturing solutions at NBS explains.<\/p>\n","protected":false},"author":21,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[307],"tags":[277,693,430,172727,694,93645,465],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-119436","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-energy-news","7":"tag-built-environment","8":"tag-climate-change","9":"tag-energy-efficiency","10":"tag-featured","11":"tag-nbs","12":"tag-net-zero","13":"tag-sustainable-construction"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sustainable action not fast enough, Sustainable Futures Report finds<\/title>\n<meta name=\"description\" content=\"The NBS Sustainable Futures report has discovered that 15% of construction organisations are likely to miss the 2050 net zero deadline\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sustainable action not fast enough, Sustainable Futures report finds\" \/>\n<meta property=\"og:description\" content=\"As the conversation around sustainability in the construction sector heats up, the NBS Sustainable Futures report has discovered that 15% of construction professionals believe their organisations are likely to miss the 2050 net zero deadline. Lee Jones, head of manufacturing solutions at NBS explains\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-14T14:08:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/12\/Lee-Jones.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2200\" \/>\n\t<meta property=\"og:image:height\" content=\"1467\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lydia Bamford\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Sustainable action not fast enough, Sustainable Futures report finds\" \/>\n<meta name=\"twitter:description\" content=\"As the conversation around sustainability in the construction sector heats up, the NBS Sustainable Futures report has discovered that 15% of construction professionals believe their organisations are likely to miss the 2050 net zero deadline. Lee Jones, head of manufacturing solutions at NBS explains\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/12\/Lee-Jones.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\"},\"author\":{\"name\":\"Lydia Bamford\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4\"},\"headline\":\"Sustainable action not fast enough, Sustainable Futures Report finds\",\"datePublished\":\"2022-12-14T14:08:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\"},\"wordCount\":1434,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Built Environment\",\"Climate Change\",\"Energy Efficiency\",\"Featured\",\"NBS\",\"Net zero\",\"Sustainable Construction\"],\"articleSection\":[\"Energy News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#respond\"]}],\"copyrightYear\":\"2022\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\",\"name\":\"Sustainable action not fast enough, Sustainable Futures Report finds\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2022-12-14T14:08:35+00:00\",\"description\":\"The NBS Sustainable Futures report has discovered that 15% of construction organisations are likely to miss the 2050 net zero deadline\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sustainable action not fast enough, Sustainable Futures Report finds\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4\",\"name\":\"Lydia Bamford\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g\",\"caption\":\"Lydia Bamford\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/lydiabamford\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sustainable action not fast enough, Sustainable Futures Report finds","description":"The NBS Sustainable Futures report has discovered that 15% of construction organisations are likely to miss the 2050 net zero deadline","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/","og_locale":"en_US","og_type":"article","og_title":"Sustainable action not fast enough, Sustainable Futures report finds","og_description":"As the conversation around sustainability in the construction sector heats up, the NBS Sustainable Futures report has discovered that 15% of construction professionals believe their organisations are likely to miss the 2050 net zero deadline. Lee Jones, head of manufacturing solutions at NBS explains","og_url":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2022-12-14T14:08:35+00:00","og_image":[{"width":2200,"height":1467,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/12\/Lee-Jones.jpg","type":"image\/jpeg"}],"author":"Lydia Bamford","twitter_card":"summary_large_image","twitter_title":"Sustainable action not fast enough, Sustainable Futures report finds","twitter_description":"As the conversation around sustainability in the construction sector heats up, the NBS Sustainable Futures report has discovered that 15% of construction professionals believe their organisations are likely to miss the 2050 net zero deadline. Lee Jones, head of manufacturing solutions at NBS explains","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/12\/Lee-Jones.jpg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/"},"author":{"name":"Lydia Bamford","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4"},"headline":"Sustainable action not fast enough, Sustainable Futures Report finds","datePublished":"2022-12-14T14:08:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/"},"wordCount":1434,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Built Environment","Climate Change","Energy Efficiency","Featured","NBS","Net zero","Sustainable Construction"],"articleSection":["Energy News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#respond"]}],"copyrightYear":"2022","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/","url":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/","name":"Sustainable action not fast enough, Sustainable Futures Report finds","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2022-12-14T14:08:35+00:00","description":"The NBS Sustainable Futures report has discovered that 15% of construction organisations are likely to miss the 2050 net zero deadline","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/sustainable-action-not-fast-enough-sustainable-futures-report-finds\/119436\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Sustainable action not fast enough, Sustainable Futures Report finds"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4","name":"Lydia Bamford","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g","caption":"Lydia Bamford"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/lydiabamford\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-06 03:27:25","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/119436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=119436"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/119436\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=119436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=119436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=119436"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=119436"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=119436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}