{"id":125677,"date":"2023-05-03T09:19:21","date_gmt":"2023-05-03T08:19:21","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=125677"},"modified":"2024-04-25T12:36:48","modified_gmt":"2024-04-25T11:36:48","slug":"digitalisation-bridge-construction-transport-logistics-build-new-bridges","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/","title":{"rendered":"How the digitalisation of bridge construction can improve transport logistics"},"content":{"rendered":"<h2>Bridges connect places and people and ensure the smooth transport of goods. Bridge construction and planning is complex \u2013 and urgently needs a digitalisation boost by relying on software solutions and digital tools, such as the ones from the Nemetschek Group<\/h2>\n<p>Bridges span valleys, rivers and traffic routes, and are also identity-creating symbols: they are, therefore an important part of our building culture.<\/p>\n<p>It is not only the safety and load-bearing capacity of bridges that are relevant but also their design. There are creative approaches to <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/visualisation-tools\/105616\/\" target=\"_blank\" rel=\"noopener\">designing the bridge<\/a> form that address the forces in the structure in an architecturally exciting way. Bridges have always been a showcase for the art of engineering and are increasingly symbols of the future theme of sustainability, whether through the optimised use of materials or the use of renewable raw materials.<\/p>\n<p>The overriding goal of <a href=\"https:\/\/www.nemetschek.com\/en\/solutions\/infrastructure-bridges-tunnels\" target=\"_blank\" rel=\"noopener\">bridge construction<\/a> remains to improve transport logistics. The first bridges were built as early as the Neolithic Age. Today, bridges form the foundation of any modern transport infrastructure. The performance of the federal highway network in Germany, for example, is based on 39,500 bridges, with a total length of over 2,000 kilometres.<\/p>\n<p>The planning and construction of long-span bridges is considered the \u201csupreme discipline\u201d in engineering: large components weighing several tonnes have to be manufactured, delivered and precisely fitted into the existing infrastructure on time. Experienced designers and structural engineers are needed, as well as good cooperation with construction<br \/>\ncompanies and authorities. That way, nothing can go wrong later on the construction site under diverse environmental influences.<\/p>\n<h3>The lack of digitalisation in bridge construction wastes time and productivity<\/h3>\n<p>However, the planning of bridges is often anything but collaborative at present: planning data comes from different data sources and in various formats from different participants so that the individual bridge models (geometric, static, structural and, if necessary, detailed models for the tension cables) do not match exactly. In some cases, multiple models are worked on in parallel by globally distributed teams. However, bridges are usually very complex structures. Any modification process is therefore extremely time-consuming.<\/p>\n<p>Nevertheless, modifications as well as time-consuming synchronisations are part of the daily business in bridge construction. Possible inconsistencies and misinformation can run through all planning phases. The end result is then reflected in numerous challenges: the lack of collaboration delays planning and planning teams spend valuable time reworking and correcting mistakes \u2013 time they could already devote to new projects with modified, collaborative planning. In addition, inconsistent planning data can cause delays in the construction of a bridge \u2013 which, in turn, costs time, and money. And last but not least, postconstruction and reconstruction work wastes valuable building materials and <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/digital-tools-calculate-environmental-impact-sustainable-building-materials\/121111\/\" target=\"_blank\" rel=\"noopener\">unnecessarily emits a lot of CO2<\/a>. To overcome these challenges, the planning and construction of bridges need a digital revolution \u2013 and an increase in the usage of digital tools.<\/p>\n<figure id=\"attachment_125688\" aria-describedby=\"caption-attachment-125688\" style=\"width: 696px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-125688 size-large\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1024x678.jpeg\" alt=\"\" width=\"696\" height=\"461\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1024x678.jpeg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-300x199.jpeg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-768x509.jpeg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1536x1017.jpeg 1536w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-2048x1356.jpeg 2048w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-696x461.jpeg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1068x707.jpeg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1920x1272.jpeg 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-634x420.jpeg 634w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-scaled.jpeg 2000w\" sizes=\"auto, (max-width: 696px) 100vw, 696px\" \/><figcaption id=\"caption-attachment-125688\" class=\"wp-caption-text\">@matho | Adobe Stock<\/figcaption><\/figure>\n<h3>A new way of planning for bridge construction<\/h3>\n<p>The challenge with bridges \u2013 and with their design and construction \u2013 lies in their structure: it is geometrically complex and the design must always be adapted to the alignment and the ground. With traditional 2D tools, planning changes had to be repeatedly updated manually in hundreds of drawings and calculations. This resulted in planning errors and inconsistencies that lead to delays and cost overruns on construction sites.<\/p>\n<p>As a countermeasure, many industrialised countries made the use of BIM (Building Information Modelling, a partnership-based planning approach based on semantic 3D models) mandatory. However, there were initially no <a href=\"https:\/\/www.digitalconstructiontoday.com\/building-digital-bridges-with-bim-iot-and-digital-twins\/415\/\" target=\"_blank\" rel=\"noopener\">BIM-enabled design tools suitable for bridge construction.<\/a><\/p>\n<p>It is time to usher in a new phase of bridge construction. This requires an end-to-end, model-based planning solution that does not rely on thinking in silos and two-dimensional plans but on collaboration and 3D models. This not only ensures quality, deadlines and cost targets are met but can also be used to reduce material consumption and thus lower CO2 emissions.<\/p>\n<p>An optimal solution is therefore based on a common, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/nemetschek-digital-twin-for-large-construction-projects\/118422\/\" target=\"_blank\" rel=\"noopener\">detailed and fully parametric 4D model<\/a> that not only represents the geometry of the bridge in 3D but also supplements it with the construction sequence and the structural analysis and verification.<\/p>\n<p>Furthermore, it should combine all the information in such a way that changes to the planning model can also be implemented quickly, consistently and intuitively at any time. This means that multiple models or versions do not have to be created, calculations can be derived directly from the model and planning errors can thus be avoided.<\/p>\n<h3>Greater digitalisation would usher in a new age of bridge construction<\/h3>\n<p>Parametric design solutions are revolutionising bridge construction by relying on communication and collaboration instead of silo thinking and fragmentation. This not only <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/digitalisation-will-drive-construction-growth-in-2023-nemetschek-predicts\/119550\/\" target=\"_blank\" rel=\"noopener\">enables cost savings but also a massive reduction in planning times<\/a>. More projects can be completed in less time with the same number of employees. In view of the shortage of skilled workers, innovative IT solutions make an important contribution to accelerating the processing of the investment backlog in infrastructure construction.<\/p>\n<p>The solution in bridge construction, not only in terms of construction methods or materials, lies in more digitalisation \u2013 in model-based, collaborative planning and in innovation. The<br \/>\ndigital transformation of bridge planning is the key to a new kind of bridge construction.<\/p>\n<p>*<em>Please note: this is a commercial profile.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Desiree Goldstein<\/strong><\/p>\n<p>Manager Communication<\/p>\n<p>Nemetschek Group<\/p>\n<p><a href=\"mailto:mediarelations@nemetschek.com\" target=\"_blank\" rel=\"noopener\">mediarelations@nemetschek.com<\/a><\/p>\n<p><a href=\"http:\/\/www.nemetschek.com\" target=\"_blank\" rel=\"noopener\">www.nemetschek.com<\/a><\/p>\n<p><a href=\"https:\/\/twitter.com\/nemetschekgroup?lang=en\" target=\"_blank\" rel=\"noopener\">Twitter<\/a><\/p>\n<p><a href=\"https:\/\/www.linkedin.com\/company\/nemetschekgroup\/\" target=\"_blank\" rel=\"noopener\">LinkedIn<\/a><\/p>\n<p><a href=\"https:\/\/www.facebook.com\/nemetschekgroup\" target=\"_blank\" rel=\"noopener\">Facebook<\/a><\/p>\n<p><a href=\"https:\/\/www.instagram.com\/nemetschekgroup\/?hl=de\" target=\"_blank\" rel=\"noopener\">Instagram<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Bridges connect places and people and ensure the smooth transport of goods. Bridge construction and planning is complex \u2013 and urgently needs a digitalisation boost by relying on software solutions and digital tools, such as the ones from the Nemetschek Group.<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[38487],"tags":[428,91241,464,94656,172727,579,172606],"stakeholder_rel_tag":[172487],"contributor_rel_tag":[],"class_list":{"0":"post-125677","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-construction-technology-news","7":"tag-bim","8":"tag-bridge-construction","9":"tag-contributor-profile","10":"tag-digital","11":"tag-featured","12":"tag-infrastructure","13":"tag-pbc-today-may-2023","14":"stakeholder_rel_tag-nemetschek"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How the digitalisation of bridge construction can improve transport logistics<\/title>\n<meta name=\"description\" content=\"Bridge construction is complex and urgently needs a digitalisation boost with software solutions and digital tools\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How the digitalisation of bridge construction can improve transport logistics\" \/>\n<meta property=\"og:description\" content=\"The planning and construction of bridges is complex \u2013 and urgently needs a digitalisation boost with software solutions and digital tools\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-05-03T08:19:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-25T11:36:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_53272135-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harriet Clough\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:description\" content=\"The planning and construction of bridges is complex \u2013 and urgently needs a digitalisation boost with software solutions and digital tools\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_53272135-scaled.jpeg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\"},\"author\":{\"name\":\"Harriet Clough\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\"},\"headline\":\"How the digitalisation of bridge construction can improve transport logistics\",\"datePublished\":\"2023-05-03T08:19:21+00:00\",\"dateModified\":\"2024-04-25T11:36:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\"},\"wordCount\":905,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1024x678.jpeg\",\"keywords\":[\"BIM\",\"Bridge construction\",\"Contributor Profile\",\"Digital Transformation\",\"Featured\",\"Infrastructure\",\"PBC Today May 2023\"],\"articleSection\":[\"Construction Technology News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#respond\"]}],\"copyrightYear\":\"2023\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\",\"name\":\"How the digitalisation of bridge construction can improve transport logistics\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1024x678.jpeg\",\"datePublished\":\"2023-05-03T08:19:21+00:00\",\"dateModified\":\"2024-04-25T11:36:48+00:00\",\"description\":\"Bridge construction is complex and urgently needs a digitalisation boost with software solutions and digital tools\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-scaled.jpeg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-scaled.jpeg\",\"width\":2000,\"height\":1325,\"caption\":\"@matho | Adobe Stock\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How the digitalisation of bridge construction can improve transport logistics\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\",\"name\":\"Harriet Clough\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"caption\":\"Harriet Clough\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How the digitalisation of bridge construction can improve transport logistics","description":"Bridge construction is complex and urgently needs a digitalisation boost with software solutions and digital tools","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/","og_locale":"en_US","og_type":"article","og_title":"How the digitalisation of bridge construction can improve transport logistics","og_description":"The planning and construction of bridges is complex \u2013 and urgently needs a digitalisation boost with software solutions and digital tools","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2023-05-03T08:19:21+00:00","article_modified_time":"2024-04-25T11:36:48+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_53272135-scaled.jpeg","type":"image\/jpeg"}],"author":"Harriet Clough","twitter_card":"summary_large_image","twitter_description":"The planning and construction of bridges is complex \u2013 and urgently needs a digitalisation boost with software solutions and digital tools","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_53272135-scaled.jpeg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/"},"author":{"name":"Harriet Clough","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356"},"headline":"How the digitalisation of bridge construction can improve transport logistics","datePublished":"2023-05-03T08:19:21+00:00","dateModified":"2024-04-25T11:36:48+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/"},"wordCount":905,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1024x678.jpeg","keywords":["BIM","Bridge construction","Contributor Profile","Digital Transformation","Featured","Infrastructure","PBC Today May 2023"],"articleSection":["Construction Technology News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#respond"]}],"copyrightYear":"2023","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/","name":"How the digitalisation of bridge construction can improve transport logistics","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-1024x678.jpeg","datePublished":"2023-05-03T08:19:21+00:00","dateModified":"2024-04-25T11:36:48+00:00","description":"Bridge construction is complex and urgently needs a digitalisation boost with software solutions and digital tools","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-scaled.jpeg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/05\/AdobeStock_51946150-scaled.jpeg","width":2000,"height":1325,"caption":"@matho | Adobe Stock"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction\/construction-technology-news\/digitalisation-bridge-construction-transport-logistics-build-new-bridges\/125677\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"How the digitalisation of bridge construction can improve transport logistics"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356","name":"Harriet Clough","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","caption":"Harriet Clough"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 09:55:56","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/125677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=125677"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/125677\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=125677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=125677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=125677"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=125677"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=125677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}