{"id":132532,"date":"2023-09-15T15:25:57","date_gmt":"2023-09-15T14:25:57","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=132532"},"modified":"2023-09-15T15:25:57","modified_gmt":"2023-09-15T14:25:57","slug":"royal-victoria-dock-cycle-bridge-works-barge-based-investigations","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/","title":{"rendered":"Royal Victoria Dock cycle bridge works continue with barge-based investigations"},"content":{"rendered":"<h2><a href=\"https:\/\/rskgroup.com\/rsk-business\/structural-soils\/\" target=\"_blank\" rel=\"noopener\">Structural Soils<\/a> conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge<\/h2>\n<p>Preparations for the 305-metre S-curve design pedestrian and cycle bridge at Royal Victoria Dock are underway, which upon completion, will link the ExCel centre and Custom House station on the north side of the dock with Silvertown.<\/p>\n<h3>The Royal Victoria Dock cycle bridge is part of the \u00a35bn Silvertown Partnership development<\/h3>\n<p>The work for Lendlease also involved ground investigation work using cable percussion and rotary coring, along with laboratory and in-situ testing.<\/p>\n<p>The bridge was funded with a <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/infrastructure-funding-homes-england-silvertown-east-london\/112810\/\" target=\"_blank\" rel=\"noopener\">\u00a3233m loan from Homes England<\/a> to support the delivery of over 6,000 homes on site.<\/p>\n<p>The Royal Victoria Dock cycle bridge is part of the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/largest-tunnel-boring-machine-silvertown-tunnel\/107131\/\" target=\"_blank\" rel=\"noopener\">Silvertown development<\/a>, which is estimated to be completed in 2036.<\/p>\n<h3>Overwater site investigations required a methodical approach<\/h3>\n<p>Structural Soils, an RSK Group company, said overwater boreholes formed part of the investigation work with the team operating through an 11m water column before cable and rotary drilling operations could be undertaken to 45m with the company\u2019s new high pressure dilatometer capability testing forming part of this work.<\/p>\n<p>Senior engineering project manager Gareth Jones said: \u201cThe team is accustomed to overwater work and so the marine environment is not new to us. In this instance, however, we worked from the deck of a 18m x 18m jack-up barge with both a Dando 2500 cable rig combined with a rotary MC450P rig of 9,000kg gross weight and a mast height of 6.2m. With limited space available to us on the deck, it was <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/data-value-planning-decommissioning-strategy\/108338\/\" target=\"_blank\" rel=\"noopener\">crucial for the team to plan and co-ordinate our mobilisation and operations precisely<\/a>.<\/p>\n<p>\u201cThe project also required piezocone penetrometer tests (pCPT) to determine soil type and conditions and land-based trial pits were undertaken to help the client understand surface soil conditions and to assess the dock wall structural arrangement.\u201d<\/p>\n<h3>Co-ordination and collaboration were key<\/h3>\n<p>Gareth added that one borehole presented positive artesian water pressure, forcing soils up the drill string, which required Structural Soils to mobilise additional equipment to the site and alter the drilling technique, using a thick polymer mud to advance the borehole.<\/p>\n<p>The jack-up barge legs, which reached 20m in height, required the team to co-ordinate its work with the London Airport flight schedule to ensure barge movements did not disrupt air traffic.<\/p>\n<p>RSK Safeground carried out the ground penetrating radar (GPR) for the land-based trial pits with another RSK company, Envirolabs, undertaking geo-environmental testing.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge.<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172731],"tags":[91241,947,145038],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-132532","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-projects","7":"tag-bridge-construction","8":"tag-london","9":"tag-surveyor"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Royal Victoria Dock cycle bridge works continue with barge-based investigations<\/title>\n<meta name=\"description\" content=\"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Royal Victoria Dock cycle bridge works continue with barge-based investigations\" \/>\n<meta property=\"og:description\" content=\"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-15T14:25:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/09\/Structural-Soils-Royal-Victoria-Dock-project-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"2000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harriet Clough\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:description\" content=\"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/09\/Structural-Soils-Royal-Victoria-Dock-project-1-scaled.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\"},\"author\":{\"name\":\"Harriet Clough\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\"},\"headline\":\"Royal Victoria Dock cycle bridge works continue with barge-based investigations\",\"datePublished\":\"2023-09-15T14:25:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\"},\"wordCount\":420,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Bridge construction\",\"London\",\"Surveyors\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#respond\"]}],\"copyrightYear\":\"2023\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\",\"name\":\"Royal Victoria Dock cycle bridge works continue with barge-based investigations\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2023-09-15T14:25:57+00:00\",\"description\":\"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Royal Victoria Dock cycle bridge works continue with barge-based investigations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\",\"name\":\"Harriet Clough\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"caption\":\"Harriet Clough\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Royal Victoria Dock cycle bridge works continue with barge-based investigations","description":"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/","og_locale":"en_US","og_type":"article","og_title":"Royal Victoria Dock cycle bridge works continue with barge-based investigations","og_description":"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge","og_url":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2023-09-15T14:25:57+00:00","og_image":[{"width":1500,"height":2000,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/09\/Structural-Soils-Royal-Victoria-Dock-project-1-scaled.jpg","type":"image\/jpeg"}],"author":"Harriet Clough","twitter_card":"summary_large_image","twitter_description":"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2023\/09\/Structural-Soils-Royal-Victoria-Dock-project-1-scaled.jpg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/"},"author":{"name":"Harriet Clough","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356"},"headline":"Royal Victoria Dock cycle bridge works continue with barge-based investigations","datePublished":"2023-09-15T14:25:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/"},"wordCount":420,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Bridge construction","London","Surveyors"],"articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#respond"]}],"copyrightYear":"2023","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/","url":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/","name":"Royal Victoria Dock cycle bridge works continue with barge-based investigations","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2023-09-15T14:25:57+00:00","description":"Structural Soils conducted the latest round of site investigations from a barge for the planned Royal Victoria Dock cycle bridge","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/royal-victoria-dock-cycle-bridge-works-barge-based-investigations\/132532\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Royal Victoria Dock cycle bridge works continue with barge-based investigations"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356","name":"Harriet Clough","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","caption":"Harriet Clough"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-29 05:31:45","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/132532","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=132532"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/132532\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=132532"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=132532"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=132532"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=132532"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=132532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}