{"id":136111,"date":"2024-01-12T13:58:54","date_gmt":"2024-01-12T13:58:54","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=136111"},"modified":"2024-01-12T13:58:54","modified_gmt":"2024-01-12T13:58:54","slug":"hs2-viaduct-deck-slide","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/","title":{"rendered":"Work begins on year-long, half-kilometere viaduct deck slide"},"content":{"rendered":"<h2>This week, <a href=\"https:\/\/www.hs2.org.uk\/what-is-hs2\/\" target=\"_blank\" rel=\"noopener\">HS2&#8217;s<\/a> main works contractor EKFB began work on a year-long project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire<\/h2>\n<p>The 450m-long viaduct deck will be the first major railway bridge in the UK to be built with a \u2018double composite\u2019 approach.<\/p>\n<p>This approach uses significantly less carbon-intensive concrete and steel than a more traditional design &#8211; and has allowed HS2 to halve the amount of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/optistruct-cuts-time-embedded-carbon-across-hs2\/128909\/\" target=\"_blank\" rel=\"noopener\">embedded carbon<\/a> in the structure.<\/p>\n<h3>The viaduct is one of 50 major viaducts on the HS2 project<\/h3>\n<p>The deck is being assembled in three stages, ranging from 90m to 180m sections.<\/p>\n<p>Commenting on the viaduct deck slide,\u00a0James Collings, EKFB\u2019s senior engineer, said:\u201cThe project team has reached a fundamental milestone in the build of this industry-leading viaduct.<\/p>\n<p>&#8220;We\u2019re progressing well with the first-of-three steel launches being conducted this year and already looking forward to seeing this viaduct come to life. Along with our supply chain partners, Eiffage Metal, we\u2019re proud to be delivering this viaduct safely and to programme.\u201d<\/p>\n<h3>HS2&#8217;s &#8216;double composite&#8217; approach is set to cut the carbon footprint of the viaduct by 56%<\/h3>\n<p>EKFB and design partner ASC worked together on the double composite approach, which was inspired by structures on the French high-speed TGV network.<\/p>\n<p>The approach is set to cut the carbon footprint of the structure by 56% \u2013 saving almost 13,000 tonnes of embodied carbon.<\/p>\n<p>The Wendover Dean Viaduct will be supported by nine evenly spaced piers, some of which will be up to 14 metres high.<\/p>\n<p>These consist of a series of hollow pre-cast concrete shells \u2013 manufactured in Northern Ireland &#8211; which are placed on top of each other and filled with concrete and steel reinforcing.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>This week, HS2&#8217;s main works contractor EKFB began work on a year-long project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire.<\/p>\n","protected":false},"author":21,"featured_media":136116,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[473,928,280],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-136111","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-planning-construction-news","8":"tag-hs2","9":"tag-rail-network","10":"tag-transport"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Work begins on year-long, half-kilometere viaduct deck slide<\/title>\n<meta name=\"description\" content=\"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work begins on year-long, half-kilometere viaduct deck slide\" \/>\n<meta property=\"og:description\" content=\"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-12T13:58:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1126\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lydia Bamford\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:description\" content=\"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\"},\"author\":{\"name\":\"Lydia Bamford\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4\"},\"headline\":\"Work begins on year-long, half-kilometere viaduct deck slide\",\"datePublished\":\"2024-01-12T13:58:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\"},\"wordCount\":295,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg\",\"keywords\":[\"HS2\",\"Rail Network\",\"Transport\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#respond\"]}],\"copyrightYear\":\"2024\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\",\"name\":\"Work begins on year-long, half-kilometere viaduct deck slide\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg\",\"datePublished\":\"2024-01-12T13:58:54+00:00\",\"description\":\"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg\",\"width\":2000,\"height\":1126,\"caption\":\"Wendover Dean deck being pushed into position\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work begins on year-long, half-kilometere viaduct deck slide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4\",\"name\":\"Lydia Bamford\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g\",\"caption\":\"Lydia Bamford\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/lydiabamford\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Work begins on year-long, half-kilometere viaduct deck slide","description":"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/","og_locale":"en_US","og_type":"article","og_title":"Work begins on year-long, half-kilometere viaduct deck slide","og_description":"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2024-01-12T13:58:54+00:00","og_image":[{"width":2000,"height":1126,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg","type":"image\/jpeg"}],"author":"Lydia Bamford","twitter_card":"summary_large_image","twitter_description":"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/"},"author":{"name":"Lydia Bamford","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4"},"headline":"Work begins on year-long, half-kilometere viaduct deck slide","datePublished":"2024-01-12T13:58:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/"},"wordCount":295,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg","keywords":["HS2","Rail Network","Transport"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#respond"]}],"copyrightYear":"2024","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/","name":"Work begins on year-long, half-kilometere viaduct deck slide","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg","datePublished":"2024-01-12T13:58:54+00:00","description":"EKFB began work on a project that will see a half-kilometre viaduct deck slide into position above the Misbourne Valley in Buckinghamshire","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2024\/01\/Wendover-Dean-deck-being-pushed-into-position-10.01.24_cropped-scaled.jpg","width":2000,"height":1126,"caption":"Wendover Dean deck being pushed into position"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/hs2-viaduct-deck-slide\/136111\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Work begins on year-long, half-kilometere viaduct deck slide"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3caffe2c18b28565792e144cbf7029c4","name":"Lydia Bamford","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b370e924c798a188a00c837c8c86078c8cca26e1199c42f81aa49e696f108d42?s=96&d=mm&r=g","caption":"Lydia Bamford"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/lydiabamford\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 21:43:36","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/136111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=136111"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/136111\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/136116"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=136111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=136111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=136111"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=136111"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=136111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}