{"id":148670,"date":"2025-02-26T07:51:25","date_gmt":"2025-02-26T07:51:25","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=148670"},"modified":"2025-02-19T15:00:17","modified_gmt":"2025-02-19T15:00:17","slug":"raising-the-bar-for-modular-school-construction-with-orsett-heath-academy","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/","title":{"rendered":"Raising the bar for modular school construction with Orsett Heath Academy"},"content":{"rendered":"<h2>McAvoy\u2019s recent work on Orsett Heath Academy in Essex \u2013 its largest project to date \u2013 highlights the use of modular construction to deliver futureproofed educational spaces efficiently<\/h2>\n<p>Covering 8,610 sq m, this three-storey secondary school for 1,200 pupils was completed ahead of schedule and demonstrates the impact of offsite manufacturing on large-scale projects.<\/p>\n<p>Commissioned by the Department for Education (DfE) under its Mod C framework, the academy features 209 precision-engineered modules assembled to create modern classrooms, breakout spaces, a performing arts hub and staff facilities.<\/p>\n<p>Extensive external works, including landscaped grounds, car and bicycle parking and sports facilities, set a new benchmark for modular school design.<\/p>\n<p>Work on Orsett Heath Academy became critical after the original contractor went into administration. McAvoy stepped in to ensure the project not only met its objectives but exceeded expectations.<\/p>\n<p>Delivered one week ahead of schedule, the new academy replaces temporary provisions with a permanent, purpose-built facility designed to inspire learning and support the local community.<\/p>\n<h3>Challenging site<\/h3>\n<p>The logistical challenges of delivering 209 modules to a site with limited access were significant. McAvoy addressed this by partnering with a nearby airfield, so the modules could be transported without disruption from local traffic restrictions.<\/p>\n<p>Onsite, collaboration with Thurrock Council was key, with temporary and permanent access routes coordinated alongside council-led roadworks.<\/p>\n<p>Working closely with local planning authorities and community stakeholders, McAvoy guaranteed that the project met all regulatory requirements. To minimise disruption, key milestones, including the installation of modules, were scheduled during school holidays and quieter periods.<\/p>\n<h3>Digital tools<\/h3>\n<p>Advanced digital tools were central to the project\u2019s success. Using Building Information Modelling (BIM), McAvoy developed detailed 3D designs that streamlined coordination, enabling automated clash detection and ensuring compliance.<\/p>\n<p><a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/how-can-augmented-reality-in-construction-deliver-on-the-long-overdue-change\/115748\/\" target=\"_blank\" rel=\"noopener\">Virtual reality (VR) models brought the designs to life<\/a>, allowing teams to refine every detail before construction began.<\/p>\n<p>Onsite, wearable technology and 360-degree cameras provided real-time progress updates, while cloud-based platforms centralised project information.<\/p>\n<p>These methods supported transparency and enhanced communication between all\u00a0 stakeholders, ensuring the delivery stayed on track.<\/p>\n<p>Sustainability was a core focus of the Orsett Heath Academy project. Air source heat pumps provide efficient heating and hot water, while 111 photovoltaic panels on the roof generate renewable energy, reducing operational costs and the school\u2019s carbon footprint.<\/p>\n<p>McAvoy\u2019s approach also prioritised waste reduction. By manufacturing modules in a controlled environment, the company minimised material waste while maintaining consistent quality.<\/p>\n<p>Beyond delivering a state-of-the-art school, McAvoy engaged with the local community throughout the project. As part of the <a href=\"https:\/\/www.considerateconstructors.com\/\" target=\"_blank\" rel=\"noopener\">Considerate Constructors Scheme<\/a>, the team achieved an outstanding audit score of 44 out of 45, with initiatives including local job creation, food bank donations and student site visits to showcase the modular construction process. The company\u2019s commitment to creating a legacy is symbolised by a four-phase\u00a0 lock installed at the school, representing the lasting impact of the project on the community it serves.<\/p>\n<p>The completion of Orsett Heath Academy highlights McAvoy\u2019s ability to deliver large-scale, complex educational facilities efficiently and sustainably. By combining advanced manufacturing techniques with innovative technologies and a commitment to collaboration, McAvoy has set a new standard for school construction.<\/p>\n<p>As demand for high-quality, purpose-built educational spaces continues to grow, projects like Orsett Heath Academy demonstrate the untapped potential of modular construction. With adaptability and innovation at its core, McAvoy is shaping the future of educational\u00a0 infrastructure &#8211; one ground-breaking project at a time.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>McAvoy\u2019s recent work on Orsett Heath Academy in Essex \u2013 its largest project to date \u2013 highlights the use of modular construction to deliver futureproofed educational spaces efficiently.<\/p>\n","protected":false},"author":24,"featured_media":148676,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[428,916,627,172965],"stakeholder_rel_tag":[],"contributor_rel_tag":[173006],"class_list":{"0":"post-148670","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-mmc-news","8":"tag-bim","9":"tag-modern-methods-of-construction","10":"tag-modular-construction","11":"tag-pbc-today-february-2025"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Raising the bar for modular school construction with Orsett Heath Academy<\/title>\n<meta name=\"description\" content=\"McAvoy\u2019s recent work on Orsett Heath Academy in Essex highlights the use of modular construction to deliver futureproofed educational spaces\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Raising the bar for modular school construction with Orsett Heath Academy\" \/>\n<meta property=\"og:description\" content=\"McAvoy\u2019s recent work on Orsett Heath Academy in Essex highlights the use of modular construction to deliver futureproofed educational spaces\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-26T07:51:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1498\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Andy Jowett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\"},\"author\":{\"name\":\"Andy Jowett\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae\"},\"headline\":\"Raising the bar for modular school construction with Orsett Heath Academy\",\"datePublished\":\"2025-02-26T07:51:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\"},\"wordCount\":568,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg\",\"keywords\":[\"BIM\",\"Modern Methods of Construction\",\"Modular Construction\",\"PBC Today February 2025\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#respond\"]}],\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\",\"name\":\"Raising the bar for modular school construction with Orsett Heath Academy\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg\",\"datePublished\":\"2025-02-26T07:51:25+00:00\",\"description\":\"McAvoy\u2019s recent work on Orsett Heath Academy in Essex highlights the use of modular construction to deliver futureproofed educational spaces\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg\",\"width\":2000,\"height\":1498,\"caption\":\"Orsett Heath Academy. Image: McAvoy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Raising the bar for modular school construction with Orsett Heath Academy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae\",\"name\":\"Andy Jowett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g\",\"caption\":\"Andy Jowett\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/andyjowett\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Raising the bar for modular school construction with Orsett Heath Academy","description":"McAvoy\u2019s recent work on Orsett Heath Academy in Essex highlights the use of modular construction to deliver futureproofed educational spaces","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/","og_locale":"en_US","og_type":"article","og_title":"Raising the bar for modular school construction with Orsett Heath Academy","og_description":"McAvoy\u2019s recent work on Orsett Heath Academy in Essex highlights the use of modular construction to deliver futureproofed educational spaces","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2025-02-26T07:51:25+00:00","og_image":[{"width":2000,"height":1498,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg","type":"image\/jpeg"}],"author":"Andy Jowett","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/"},"author":{"name":"Andy Jowett","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae"},"headline":"Raising the bar for modular school construction with Orsett Heath Academy","datePublished":"2025-02-26T07:51:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/"},"wordCount":568,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg","keywords":["BIM","Modern Methods of Construction","Modular Construction","PBC Today February 2025"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#respond"]}],"copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/","name":"Raising the bar for modular school construction with Orsett Heath Academy","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg","datePublished":"2025-02-26T07:51:25+00:00","description":"McAvoy\u2019s recent work on Orsett Heath Academy in Essex highlights the use of modular construction to deliver futureproofed educational spaces","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/02\/Orsett-Heath-Academy_External2-scaled.jpg","width":2000,"height":1498,"caption":"Orsett Heath Academy. Image: McAvoy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/raising-the-bar-for-modular-school-construction-with-orsett-heath-academy\/148670\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Raising the bar for modular school construction with Orsett Heath Academy"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae","name":"Andy Jowett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g","caption":"Andy Jowett"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/andyjowett\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-07 12:54:40","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/148670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=148670"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/148670\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/148676"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=148670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=148670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=148670"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=148670"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=148670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}