{"id":151232,"date":"2025-05-15T11:50:04","date_gmt":"2025-05-15T10:50:04","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=151232"},"modified":"2025-05-15T11:50:04","modified_gmt":"2025-05-15T10:50:04","slug":"building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/","title":{"rendered":"Building bold: The digital engineering challenge at Maggie&#8217;s cancer centre"},"content":{"rendered":"<h2>Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach<\/h2>\n<p>With the design and installation sequence communicated predominantly in 3D, William Hare made use of a wide range of digital tools and platforms.<\/p>\n<p>Renowned for both its distinctive architectural design and the exceptional dedication to supporting individuals with cancer, the newest Maggie\u2019s cancer support centre is situated in the grounds of the Royal Free Hospital in London. Showcasing a custom raking curved facade, inclined walls, distinctive timber cladding, and a secluded rooftop garden and pavilion, this diminutive yet architecturally bold structure set the engineers and client team a considerable challenge.<\/p>\n<p>Appointed by construction manager and principal contractor Sir Robert McAlpine Special Projects on behalf of Maggie\u2019s to deliver the project\u2019s structural steelwork was William Hare, the leading structural steel engineering group.<\/p>\n<p>Speaking about the project, Ivo Garcia, innovation &amp; BIM manager at William Hare said: &#8220;This project was different right from the outset, not just in terms of its charitable nature but also the structure\u2019s volume, its striking shape and the incredibly collaborative environment curated amongst stakeholders.<\/p>\n<p>&#8220;The interesting geometry and shape of the structure, featuring a series of curved conical volumes, was a direct result of the site\u2019s small footprint and challenging constraints, which included neighbouring retaining walls. In order to deliver the desired square footage, the decision was made to design a sloped fa\u00e7ade, enabling the building to expand as it rises.<\/p>\n<p>&#8220;These same site constraints also posed a challenge to us in terms of site delivery and installation. With some of the structural columns leaning up to 45 degrees, the standard approach would have involved the use of temporary steelwork to support the columns. However, external propping wasn\u2019t possible due to the aforementioned site boundaries, while propping internally wouldn\u2019t have allowed enough space for machinery and access. Despite only being a two-storey structure, the temporary forces would have been akin to an eight-storey building as a result of the geometry, requiring a considerable amount of temporary steelwork.<\/p>\n<h3>Taking the model from design to installation<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-151238 aligncenter\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-300x161.png\" alt=\"\" width=\"734\" height=\"394\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-300x161.png 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-1024x549.png 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-768x412.png 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-1536x824.png 1536w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-2048x1099.png 2048w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-783x420.png 783w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-696x373.png 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-1068x573.png 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-1920x1030.png 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot-610x327.png 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-Tekla-model-snapshot.png 2000w\" sizes=\"auto, (max-width: 734px) 100vw, 734px\" \/><\/p>\n<p>&#8220;In order to work around this, we had to plan and detail an incredibly prescriptive method of install, which drove the project from start to finish. The 40-step install sequence was initially created in an alternative design software, before being pushed into <a href=\"https:\/\/www.trimble.com\/en\/products\/trimble-connect\" target=\"_blank\" rel=\"noopener\">Trimble Connect<\/a>. Using the \u2018Views\u2019 and \u2018Custom Properties\u2019 features in Trimble Connect, we were able to animate the sequence to show how it would be fitted, piece by piece.<\/p>\n<p>&#8220;This was hugely valuable. Effectively, anyone can use Trimble Connect, whether to consult a model or add data to objects in Tekla Structures. You don\u2019t have to be a Tekla user to benefit from it, which made the most difference \u2013 it truly helps to break down barriers between departments.<\/p>\n<p>&#8220;The <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/eden-facades-viewpoint-field-view\/133418\/\" target=\"_blank\" rel=\"noopener\">cloud-based platform enabled us to overcome the logistical challenges<\/a> and clearly demonstrate and communicate our proposed strategy, all of which contributed to a smooth construction sequence, loading strategy and on-site erection. For example, we could easily break down the lorry load numbers and detail the individual component install sequence within each load, all colour-coded and clearly visible. Using Trimble Connect, we were able to make this same information readily available to engineers, detailers and the on-site team. It provided a great means of successfully managing the project, adding intelligence to the model and offering an enhanced method of communication.&#8221;<\/p>\n<h3>From the BIM model to the field<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-151237 aligncenter\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-300x161.png\" alt=\"\" width=\"768\" height=\"412\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-300x161.png 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-1024x549.png 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-768x412.png 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-1536x824.png 1536w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-2048x1099.png 2048w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-783x420.png 783w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-696x373.png 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-1068x573.png 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-1920x1030.png 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination-610x327.png 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-examples-of-3D-detail-coordination.png 2000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>Pushing the capabilities of Trimble Connect further, William Hare also made use of Trimble Connect AR and Trimble Field Link to drive data from the model out into the field.<\/p>\n<p>Speaking about the value this workflow offered, Ivo commented: &#8220;The challenging structural geometry and complex installation sequence really demanded this <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/concept-construction-building-connected-digital-workflows\/140010\/\" target=\"_blank\" rel=\"noopener\">digital workflow<\/a>. Adopting the streamlined approach offered by <a href=\"https:\/\/www.trimble.com\/en\/products\/building-construction-field-systems\/fieldlink-software\" target=\"_blank\" rel=\"noopener\">Trimble Field Link<\/a> just makes sense, especially if you are already using other <a href=\"http:\/\/www.tekla.com\/uk\" target=\"_blank\" rel=\"noopener\">Tekla software solutions<\/a> \u2013 it\u2019s the same ecosystem, with the same data flowing seamlessly from office to field. Having the model data readily available, whether you\u2019re in the office or out on site was invaluable.<\/p>\n<p>&#8220;Ordinarily, there is the potential for time to be wasted when problems are found or doubts arise, with people having to travel from site to office or spend time on the phone with a member of the detailing or engineering team. When all the information is locked within a system and a skillset that not everyone has access to, it can bring inefficiencies. If we can make curated data readily available to the site team, through platforms such as Trimble Connect, this can all be avoided, providing teams with the context, the data and the means to action it.<\/p>\n<p>&#8220;On this project, we had around 25 Trimble Connect users on the project. Outside of William Hare\u2019s project and engineering teams, client representatives and their designers and architects, erection subcontractors and our production planning team all had access to the project in Trimble Connect. It really was at the centre of it all.<\/p>\n<p>&#8220;While communication with other stakeholders on this project was primarily in 3D, with the preferred file format being IFC, this is sadly still not the norm. Here, the complex geometry made it essential and was possible due to the enhanced collaboration fostered within the delivery team. Using 3D continues to have its complications and barriers \u2013 while it can be used extensively for engineering, it is still often followed by drawings, with these drawings being what \u2018rule\u2019. Confidence is needed on an industry-level that 3D is the best tool for communicating information on every level, from contractors to clients to developers. We need to embrace it and find the necessary framework to deliver it.&#8221;<\/p>\n<p><strong>For more information, please visit: <a href=\"http:\/\/www.tekla.com\/uk\" target=\"_blank\" rel=\"noopener\">www.tekla.com\/uk<\/a>.<\/strong><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach.<\/p>\n","protected":false},"author":17,"featured_media":151236,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[173054,576,464,172727],"stakeholder_rel_tag":[172539],"contributor_rel_tag":[],"class_list":{"0":"post-151232","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bim-news","8":"tag-3d-modeling","9":"tag-bim-software","10":"tag-contributor-profile","11":"tag-featured","12":"stakeholder_rel_tag-trimble"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Building bold: The digital engineering challenge at Maggie&#039;s cancer centre | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building bold: The digital engineering challenge at Maggie&#039;s cancer centre\" \/>\n<meta property=\"og:description\" content=\"Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-15T10:50:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1245\" \/>\n\t<meta property=\"og:image:height\" content=\"754\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Carpenter\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\"},\"author\":{\"name\":\"Steph Carpenter\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65\"},\"headline\":\"Building bold: The digital engineering challenge at Maggie&#8217;s cancer centre\",\"datePublished\":\"2025-05-15T10:50:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\"},\"wordCount\":989,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg\",\"keywords\":[\"3D Modeling\",\"BIM Software\",\"Contributor Profile\",\"Featured\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#respond\"]}],\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\",\"name\":\"Building bold: The digital engineering challenge at Maggie's cancer centre | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg\",\"datePublished\":\"2025-05-15T10:50:04+00:00\",\"description\":\"Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg\",\"width\":1245,\"height\":754},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Building bold: The digital engineering challenge at Maggie&#8217;s cancer centre\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65\",\"name\":\"Steph Carpenter\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"caption\":\"Steph Carpenter\"},\"sameAs\":[\"http:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephhazlegreaves\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Building bold: The digital engineering challenge at Maggie's cancer centre | Planning, Building &amp; Construction Today","description":"Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/","og_locale":"en_US","og_type":"article","og_title":"Building bold: The digital engineering challenge at Maggie's cancer centre","og_description":"Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2025-05-15T10:50:04+00:00","og_image":[{"width":1245,"height":754,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg","type":"image\/jpeg"}],"author":"Steph Carpenter","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/"},"author":{"name":"Steph Carpenter","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65"},"headline":"Building bold: The digital engineering challenge at Maggie&#8217;s cancer centre","datePublished":"2025-05-15T10:50:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/"},"wordCount":989,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg","keywords":["3D Modeling","BIM Software","Contributor Profile","Featured"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#respond"]}],"copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/","name":"Building bold: The digital engineering challenge at Maggie's cancer centre | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg","datePublished":"2025-05-15T10:50:04+00:00","description":"Featuring complex geometry, with nearly all edge columns of the curved fa\u00e7ade raking in two directions, the construction of the new Maggie\u2019s cancer centre at The Royal Free Hospital demanded an integrated approach","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/05\/Maggies-building-in-context-with-Trimble-cloud-survey-data.jpg","width":1245,"height":754},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/building-bold-the-digital-engineering-challenge-at-maggies-cancer-centre\/151232\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Building bold: The digital engineering challenge at Maggie&#8217;s cancer centre"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65","name":"Steph Carpenter","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","caption":"Steph Carpenter"},"sameAs":["http:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephhazlegreaves\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-14 06:36:31","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/151232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=151232"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/151232\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/151236"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=151232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=151232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=151232"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=151232"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=151232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}