{"id":153775,"date":"2025-08-04T10:28:26","date_gmt":"2025-08-04T09:28:26","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=153775"},"modified":"2025-08-04T10:33:46","modified_gmt":"2025-08-04T09:33:46","slug":"making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/","title":{"rendered":"Making water discharge an early priority crucial for well-regulated, compliant sites"},"content":{"rendered":"<h2>RSK Geosciences principal engineer Kevin Holmes argues that, while housebuilders and developers have long been aware of the importance of suitable <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/suds-surface-water-flooding-england\/137445\/\" target=\"_blank\" rel=\"noopener\">surface water drainage strategies<\/a> on completed developments, responsible developers should have the same level of awareness of regulations governing water discharge during the construction phase and suggests how developers can remain compliant<\/h2>\n<p>Water on a construction site will nearly always be an issue owing to rainfall, and given that UK soils commonly contain silts or clays, most construction projects will generate silt-laden wastewater.<\/p>\n<p>Watercourse drainage consent acquired via local authorities is often misconstrued as consent to discharge water during the temporary construction phase of works. Temporary discharge of water off-site that is released into the environment will be classed by the environmental regulator as a water discharge activity and subject to environmental permitting regulations. Construction sites that do not hold a valid permit are vulnerable to regulatory and enforcement action, which can include significant fines and work delays, not to mention loss of reputation.<\/p>\n<p>There are situations when the environmental regulator may not look to enforce the need for an environmental permit for some activities, such as the temporary storage, reuse, treatment and discharge of water from excavations, so long as the requirements set out within the regulatory position statements (RPS) are complied with.<\/p>\n<h3>Generic water management plans are not suitable for construction sites<\/h3>\n<p>Unfortunately, the RPS are both overly relied on and of limited use to service temporary discharges from construction projects, where a bespoke permit should be put in place for activities that do not meet the conditions for the RPS. In practice, this means that all construction sites require appropriate bespoke environmental permits and a suitable construction surface water management plan to cater for this discharge.<\/p>\n<p>In order to obtain a bespoke permit, an application must be made to the regulator and a fee should be paid prior to submission. The information required typically includes a non-technical summary of the discharge activities involved, providing a simplified explanation of the proposed discharge activities and commentary on the effluent quality and intended treatment, as well as the management systems and maintenance programme that will be in place to safeguard the environment. It should be easy to read and summarise neatly what the developer intends to do. The regulator may also require additional assessments, such as a habitat assessment or a specific substances assessment, which can be confirmed as part of the regulator\u2019s pre-application advice service.<\/p>\n<p>The forms used for these permit applications actually cover a range of activities and are not solely for discharge from construction sites. There are sections on sewage treatment, mining processes and waste operations that don\u2019t apply to most of the activities a developer and contractor would plan to undertake. This can make the forms quite confusing for someone not experienced in their submission.<\/p>\n<h3>It can take up to a year to secure a bespoke permit<\/h3>\n<p>Upon receiving the application, the regulator will undertake a screening assessment to ensure all mandatory information has been received, and once this is completed the application will be classed as \u2018duly made\u2019 and passed to a permitting officer for determination. It is important to note that it can take over 6 months, and in some cases up to 12 months, for a permit to be prepared, submitted and determined, a time frame that developers need to be aware of and factor into their development programme to avoid potentially costly delays.<\/p>\n<p>Once issued, the permit comes with conditions relating to water quality, and it is the duty of the permit holder to ensure that all conditions are adhered to. The required monitoring, for example, water quality spot-checks or laboratory testing of collected water samples, will be specified in the permit. Generally, this will follow the proposed construction surface water management plan that has been submitted but may include additional specifications if the regulator feels they are necessary.<\/p>\n<p>Should discharged water breach limits set in the permit, it remains the responsibility of the permit holder to adapt their surface water management plan accordingly, so it is in everyone\u2019s interests to ensure that the management plan is suitable from the outset, as a pollution event can result in an unlimited fine or prosecution and even a custodial sentence.<\/p>\n<h3>Water discharge regulations may be updated in the coming months<\/h3>\n<p>Developers must be aware of their duties and responsibilities towards water discharge on a construction site. The UK and Welsh governments have recently launched a <a href=\"https:\/\/consult.defra.gov.uk\/environmental-regulations\/exemptions-reform-to-the-environmental-permitting\/\" target=\"_blank\" rel=\"noopener\">joint consultation<\/a> to reform environmental permitting regulations, which will hopefully result in a more streamlined and responsive permitting process.<\/p>\n<p>Until then, while simply having a construction surface water management plan does not exempt a developer from the need to properly monitor and mitigate the discharge of potentially contaminated water, it is an important \u2013 and, in our experience, a poorly understood \u2013 first step in ensuring regulatory compliance.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>RSK Geosciences principal engineer Kevin Holmes argues that, while housebuilders and developers have long been aware of the importance of suitable surface water drainage strategies on completed developments, responsible developers should have the same level of awareness of regulations governing water discharge during the construction phase and suggests how developers can remain compliant. <\/p>\n","protected":false},"author":25,"featured_media":153785,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[306],"tags":[568,649,802],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-153775","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-building-control-news","8":"tag-building-regulations","9":"tag-planning-applications","10":"tag-water-management"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Making water discharge an early priority crucial for well-regulated, compliant sites<\/title>\n<meta name=\"description\" content=\"RSK Geosciences principal engineer Kevin Holmes examines how developers can remain compliant with water discharge regulations\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Making water discharge an early priority crucial for well-regulated, compliant sites\" \/>\n<meta property=\"og:description\" content=\"RSK Geosciences principal engineer Kevin Holmes examines how developers can remain compliant with water discharge regulations\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-04T09:28:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-04T09:33:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harriet Clough\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\"},\"author\":{\"name\":\"Harriet Clough\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\"},\"headline\":\"Making water discharge an early priority crucial for well-regulated, compliant sites\",\"datePublished\":\"2025-08-04T09:28:26+00:00\",\"dateModified\":\"2025-08-04T09:33:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\"},\"wordCount\":820,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg\",\"keywords\":[\"Building Regulations\",\"Planning Applications\",\"Water Management\"],\"articleSection\":[\"Building Control News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#respond\"]}],\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\",\"name\":\"Making water discharge an early priority crucial for well-regulated, compliant sites\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg\",\"datePublished\":\"2025-08-04T09:28:26+00:00\",\"dateModified\":\"2025-08-04T09:33:46+00:00\",\"description\":\"RSK Geosciences principal engineer Kevin Holmes examines how developers can remain compliant with water discharge regulations\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg\",\"width\":2000,\"height\":1333,\"caption\":\"\u00a9Francesca Leslie | iStock\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Making water discharge an early priority crucial for well-regulated, compliant sites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\",\"name\":\"Harriet Clough\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"caption\":\"Harriet Clough\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Making water discharge an early priority crucial for well-regulated, compliant sites","description":"RSK Geosciences principal engineer Kevin Holmes examines how developers can remain compliant with water discharge regulations","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/","og_locale":"en_US","og_type":"article","og_title":"Making water discharge an early priority crucial for well-regulated, compliant sites","og_description":"RSK Geosciences principal engineer Kevin Holmes examines how developers can remain compliant with water discharge regulations","og_url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2025-08-04T09:28:26+00:00","article_modified_time":"2025-08-04T09:33:46+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg","type":"image\/jpeg"}],"author":"Harriet Clough","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/"},"author":{"name":"Harriet Clough","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356"},"headline":"Making water discharge an early priority crucial for well-regulated, compliant sites","datePublished":"2025-08-04T09:28:26+00:00","dateModified":"2025-08-04T09:33:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/"},"wordCount":820,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg","keywords":["Building Regulations","Planning Applications","Water Management"],"articleSection":["Building Control News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#respond"]}],"copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/","url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/","name":"Making water discharge an early priority crucial for well-regulated, compliant sites","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg","datePublished":"2025-08-04T09:28:26+00:00","dateModified":"2025-08-04T09:33:46+00:00","description":"RSK Geosciences principal engineer Kevin Holmes examines how developers can remain compliant with water discharge regulations","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/08\/iStock-1496022655-scaled.jpg","width":2000,"height":1333,"caption":"\u00a9Francesca Leslie | iStock"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/making-water-discharge-early-priority-crucial-for-well-regulated-compliant-sites\/153775\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Making water discharge an early priority crucial for well-regulated, compliant sites"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356","name":"Harriet Clough","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","caption":"Harriet Clough"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 00:06:03","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/153775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=153775"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/153775\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/153785"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=153775"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=153775"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=153775"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=153775"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=153775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}