{"id":156791,"date":"2025-11-10T09:00:34","date_gmt":"2025-11-10T09:00:34","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=156791"},"modified":"2025-11-12T09:55:22","modified_gmt":"2025-11-12T09:55:22","slug":"how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/","title":{"rendered":"How could integrated digital planning tools tighten cost estimates in roadbuilding?"},"content":{"rendered":"<h2>4D planning tools could improve control over costs and schedules for infrastructure &#8211; especially road building, writes Dan Ashton, programme and project services director at Proicere Digital<\/h2>\n<p>In the UK, a road-building scheme at an early stage can easily have a cost spread of +20%-30% because of how much is still uncertain before design and approvals are locked in.<\/p>\n<p>One example of a wide cost spread is the <a href=\"https:\/\/www.manchestereveningnews.co.uk\/news\/greater-manchester-news\/massive-motorway-changes-simister-island-31351943\" target=\"_blank\" rel=\"noopener\">upgrade of the Simister Island Interchange<\/a> that links the M60, M62 and M66 motorways in Greater Manchester, estimated to cost between \u00a3207m and \u00a3340m.<\/p>\n<p>The high contingency \u2013 a \u00a3133m spread, equivalent to +\/- 24.3% around the midpoint \u2013 is consistent with a <a href=\"https:\/\/aheinc.ca\/wp-content\/uploads\/2018\/12\/AACE-Cost-Estimate-Classification-System.pdf\" target=\"_blank\" rel=\"noopener\">Class-3 estimate<\/a> for construction projects where many factors affecting the eventual cost are unknown.<\/p>\n<p>There are indeed many such unknowns at this early stage for Simister Island. Construction and traffic management plans are not yet finalised, so costs of lane closures, diversions and sequences are still rough guesses. Other unknowns include ground conditions, inflation risk and planning requirements.<\/p>\n<p>Additionally, public sector clients such as the Highways Agency are reluctant to declare the most likely estimate, to avoid contractors pricing right up to that figure.<\/p>\n<p>But in light of the government\u2019s recent announcement to invest \u00a324bn in improving the UK\u2019s road network between now and 2030, it\u2019s worth exploring whether estimates can<br \/>\nbe tightened. Even a small percentage reduction in estimates could generate 10-figure savings.<\/p>\n<p>Digital construction planning tools can offer stronger support for cost certainty and decision-making \u2013 provided they are integrated and rigorously applied from the outset<br \/>\nof a project. Here we see room for improvement.<\/p>\n<p>The conventional understanding is that 4D information management tools provide a time-lapsed visualisation of a construction project, by integrating the 3D model with the schedule.<\/p>\n<h3>4D environments as decision-support systems<\/h3>\n<p>However, assisted by artificial intelligence, today\u2019s 4D environments act as decision-support systems across the project lifecycle. They help validate constructability, sequence activities without clashes, rehearse traffic management strategies, forecast resource needs and communicate options to stakeholders.<\/p>\n<p>Because these platforms are increasingly linked with cost data, they are not only about planning workflows but also about tightening estimates and improving budget confidence.<\/p>\n<p>In the ideation phase, it can simulate traffic management plans, improving sequencing and resource estimates. The clear visualisation of these plans can also help stakeholders<br \/>\nsuch as communities, investors and regulators reach decisions more easily. By definition, anything that helps accelerate a construction project reduces risk of overspend.<\/p>\n<p>In the design phase, the 4D model would enable detection of clashes that are invisible in static models or Gantt charts. For road building, these can be between utilities, structures, people, equipment, materials and vehicles. This enables a smooth construction sequence to be determined before works start, avoiding contingencies for costly design changes later on.<\/p>\n<h3>Connecting cost data for more accurate estimates<\/h3>\n<p>Furthermore, an updatable <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-technology-news\/beyond-visualisation-why-the-future-of-4d-planning-is-active\/151760\/\" target=\"_blank\" rel=\"noopener\">4D planning tool<\/a> that is connected to the cost data, can enable more accurate estimates for materials and operating costs, and tighter budget control through the life of the project.<\/p>\n<p>Also during the design phase, the planning tool calculates exact quantities of materials like steel, asphalt and concrete, avoiding overestimation or shortage risks. Should there be changes to the model later on \u2013 for example, if ground surveys reveal the need for extra drainage \u2013 cost and quantity forecasts get automatically updated, triggering procurement alerts.<\/p>\n<p>Commercial teams see the financial impact of scope and sequence changes in real time &#8211; avoiding wasted worker hours chasing up colleagues for status reports.<\/p>\n<h3>Areas of uncertainty<\/h3>\n<p>However, there will still be external risks that 4D modelling cannot eliminate at the outset of an infrastructure project. Modelling cannot meaningfully reduce uncertainty relating to land acquisition, legal approvals, cost inflation or unexpected archaeological and environmental findings.<\/p>\n<p>And while 4D tools can provide scenarios for environmental impacts, the actual requirements \u2013 such as the need to protect habitats, water courses or air quality \u2013 depend on surveys, outcomes and approvals. Likewise, it can model likely impacts caused by extreme weather, and analyse vast data to determine probabilities of occurrence, but<br \/>\nfrequency and severity are still unpredictable.<\/p>\n<p>The impact of environmental surveys cannot be underestimated. For example, in the south of the Netherlands,<a href=\"https:\/\/nos.nl\/artikel\/2569957-verbreding-a2-in-het-geding-door-beschermde-vleermuis\" target=\"_blank\" rel=\"noopener\"> plans to upgrade a 20km stretch of the A2 motorway have been threatened with cancellation<\/a>, after it was discovered that works would disturb a population of bats, which are protected under EU law. If the project goes ahead, it will likely take up to two years longer to complete than originally expected, in order to comply with bat protection legislation.<\/p>\n<h3>4D modelling: the potential for deeper understanding<\/h3>\n<p>A 4D model, therefore, will not remove the need for a healthy contingency. But given its capabilities for visualisation, clash detection, accurate cost estimates and scenario testing, it makes significant contributions to avoiding overspend, waste and delay, and gives project managers a clearer understanding of risk probability.<\/p>\n<p>Empowered by this combination of benefits, the project manager is in a stronger position to reduce the spread from a Class-3 cost estimate classification (-20% to +30%) to a<br \/>\nClass-2 (-10% to +20%).<\/p>\n<p>A modest 10% spread reduction could mean a \u00a324m saving in estimates for a new motorway junction. Achieving a similar reduction across the \u00a324bn roadbuilding plan could potentially help the government free up \u00a32.4bn of allocated funds. At a time when budgets are especially tight and under scrutiny, this can only bring cheer, especially to taxpayers.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>4D planning tools could improve control over costs and schedules for infrastructure &#8211; especially road building, writes Dan Ashton, programme and project services director at Proicere Digital. <\/p>\n","protected":false},"author":24,"featured_media":156793,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172736],"tags":[173054,173165,649],"stakeholder_rel_tag":[],"contributor_rel_tag":[173062],"class_list":{"0":"post-156791","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction-software-news","8":"tag-3d-modeling","9":"tag-pbc-today-november-2025","10":"tag-planning-applications"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How could integrated digital planning tools tighten cost estimates in roadbuilding? | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"4D planning tools could improve control over costs and schedules for infrastructure - especially road building, writes Dan Ashton of Proicere Digital\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How could integrated digital planning tools tighten cost estimates in roadbuilding?\" \/>\n<meta property=\"og:description\" content=\"4D planning tools could improve control over costs and schedules for infrastructure - especially road building, writes Dan Ashton of Proicere Digital\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-10T09:00:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-12T09:55:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Andy Jowett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\"},\"author\":{\"name\":\"Andy Jowett\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae\"},\"headline\":\"How could integrated digital planning tools tighten cost estimates in roadbuilding?\",\"datePublished\":\"2025-11-10T09:00:34+00:00\",\"dateModified\":\"2025-11-12T09:55:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\"},\"wordCount\":904,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg\",\"keywords\":[\"3D Modeling\",\"PBC Today November 2025\",\"Planning Applications\"],\"articleSection\":[\"Construction Software News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#respond\"]}],\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\",\"name\":\"How could integrated digital planning tools tighten cost estimates in roadbuilding? | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg\",\"datePublished\":\"2025-11-10T09:00:34+00:00\",\"dateModified\":\"2025-11-12T09:55:22+00:00\",\"description\":\"4D planning tools could improve control over costs and schedules for infrastructure - especially road building, writes Dan Ashton of Proicere Digital\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Image: Proicere Digital\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How could integrated digital planning tools tighten cost estimates in roadbuilding?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae\",\"name\":\"Andy Jowett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g\",\"caption\":\"Andy Jowett\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/andyjowett\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How could integrated digital planning tools tighten cost estimates in roadbuilding? | Planning, Building &amp; Construction Today","description":"4D planning tools could improve control over costs and schedules for infrastructure - especially road building, writes Dan Ashton of Proicere Digital","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/","og_locale":"en_US","og_type":"article","og_title":"How could integrated digital planning tools tighten cost estimates in roadbuilding?","og_description":"4D planning tools could improve control over costs and schedules for infrastructure - especially road building, writes Dan Ashton of Proicere Digital","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2025-11-10T09:00:34+00:00","article_modified_time":"2025-11-12T09:55:22+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg","type":"image\/jpeg"}],"author":"Andy Jowett","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/"},"author":{"name":"Andy Jowett","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae"},"headline":"How could integrated digital planning tools tighten cost estimates in roadbuilding?","datePublished":"2025-11-10T09:00:34+00:00","dateModified":"2025-11-12T09:55:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/"},"wordCount":904,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg","keywords":["3D Modeling","PBC Today November 2025","Planning Applications"],"articleSection":["Construction Software News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#respond"]}],"copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/","name":"How could integrated digital planning tools tighten cost estimates in roadbuilding? | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg","datePublished":"2025-11-10T09:00:34+00:00","dateModified":"2025-11-12T09:55:22+00:00","description":"4D planning tools could improve control over costs and schedules for infrastructure - especially road building, writes Dan Ashton of Proicere Digital","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2025\/11\/4D-plannings-uses-include-validating-constructability-sequencing-rehearsals-forecasting-and-stakeholder-communication.jpg","width":1920,"height":1080,"caption":"Image: Proicere Digital"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-software-news\/how-could-integrated-digital-planning-tools-tighten-cost-estimates-in-roadbuilding\/156791\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"How could integrated digital planning tools tighten cost estimates in roadbuilding?"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/3211d68061e71e4ffadd66d34dedbdae","name":"Andy Jowett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/39ef950782aaea1ff49efe9d23efc3c20b0acef0aab57ec899568bced017c888?s=96&d=mm&r=g","caption":"Andy Jowett"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/andyjowett\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-04 20:15:26","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/156791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=156791"}],"version-history":[{"count":4,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/156791\/revisions"}],"predecessor-version":[{"id":156976,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/156791\/revisions\/156976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/156793"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=156791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=156791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=156791"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=156791"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=156791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}