{"id":158054,"date":"2026-01-02T10:44:51","date_gmt":"2026-01-02T10:44:51","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=158054"},"modified":"2026-01-02T10:44:51","modified_gmt":"2026-01-02T10:44:51","slug":"video-two-key-hs2-viaducts-completed-over-christmas","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/","title":{"rendered":"[VIDEO] Two key HS2 viaducts completed over Christmas"},"content":{"rendered":"<h2>Two of the railway\u2019s viaducts saw completion over the Christmas break near Water Orton, Warwickshire<\/h2>\n<p>The <a href=\"https:\/\/www.hs2.org.uk\/\" target=\"_blank\" rel=\"noopener\">HS2<\/a> viaducts form a small part of the Delta junction, which is a large triangular intersection being built for HS2 near Birmingham.<\/p>\n<p>The Delta junction will allow high-speed trains to travel over motorways and roads, rivers, and floodplains, connecting services to Birmingham and the mainline.<\/p>\n<h3>The junction will have over two miles of track<\/h3>\n<p>Due to the nature of the high-speed trains, which will travel up to 360km\/h (223mph), the junction needs to be stretched out much further than a motorway junction. Therefore, including underpasses, flyovers, and viaducts, the track will stretch to 2.6 miles.<\/p>\n<p>The two HS2 viaducts completed over Christmas, the Water Orton viaducts, are at the northernmost end of the junction and will allow southbound trains to join the spur into Birmingham.<\/p>\n<p>The viaducts were completed by Balfour Beatty VINCI engineers over a five-day closure throughout Christmas, and now work can move to the viaducts over the A446 and M42.<\/p>\n<div class=\"youtube-embed\" data-video_id=\"U01oO8Q3drc\"><iframe loading=\"lazy\" title=\"Water Orton viaducts completed over railway\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/U01oO8Q3drc?feature=oembed&#038;enablejsapi=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<p>Sam Hinkley, HS2 Ltd\u2019s senior project manager, said: \u201cIt\u2019s great to see the Water Orton viaducts in place across the railway and I\u2019d like to thank everyone who gave up their Christmas to help us reach this important milestone and I\u2019d like to thank passengers for their patience.<\/p>\n<p>\u201cThese precast segmental viaducts form a key part of the Delta junction \u2013 one of the most complex parts of the HS2 project and I look forward to seeing more progress in the year ahead.\u201d<\/p>\n<p>Stephane Ciccolini, senior works manager at Balfour Beatty VINCI, added: \u201cThis complex section of the HS2 route has taken a major step forward, after BBV teams successfully erected two viaducts spans over an existing railway near Water Orton.<\/p>\n<p>\u201cWe\u2019ve worked around the clock during the Christmas period to deliver this incredible feat of engineering, using a specialist cantilever technique not seen in the UK before this project. This approach involves using a 22-metre-high mast and a 14-metre-high swivel crane to move each individual segment into place until the span is complete.\u201d<\/p>\n<h3>2025 was a big year for HS2<\/h3>\n<p>A lot of work was completed for the HS2 project in 2025, including the sliding of a <a href=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2-completes-4600-tonne-viaduct-slide-across-m6\/157923\/\" target=\"_blank\" rel=\"noopener\">4,600-tonne viaduct<\/a> spanning across a section of the M6.<\/p>\n<p>The sliding operation took 17 hours as the 315 metre long east deck of the M6 South viaduct was put in place. Using experience from a previous slide, the operation marked the halfway point for completion of the M6 South viaduct.<\/p>\n<p>At the time, Caroline Warrington, HS2 Ltd\u2019s head of delivery, said: \u201cWe believe this fully restrained slide was a first for the country, but most importantly it means we\u2019ve been able to cut in half the number of times we\u2019ve had to close the motorway. I\u2019d like to thank everyone who worked so hard to make the operation a success.\u201d<\/p>\n<p>National Highways regional director for the Midlands, Victoria Lazenby, said: \u201cOur key focus is the impact that these major construction works have on our roads \u2013 we must both ensure the safety of road users and minimise the disruption they face.<\/p>\n<p>\u201cSo we are delighted that this innovative technique has meant that not only was this enormous structure slid into place without having to close the motorway during the day but also that the total number of closures needed has also been halved.\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year.<\/p>\n","protected":false},"author":32,"featured_media":158055,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172731],"tags":[473,579,928],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-158054","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-projects","8":"tag-hs2","9":"tag-infrastructure","10":"tag-rail-network"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>[VIDEO] Two key HS2 viaducts completed over Christmas<\/title>\n<meta name=\"description\" content=\"Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"[VIDEO] Two key HS2 viaducts completed over Christmas\" \/>\n<meta property=\"og:description\" content=\"Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-02T10:44:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Matt Brundrett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\"},\"author\":{\"name\":\"Matt Brundrett\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3\"},\"headline\":\"[VIDEO] Two key HS2 viaducts completed over Christmas\",\"datePublished\":\"2026-01-02T10:44:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\"},\"wordCount\":600,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg\",\"keywords\":[\"HS2\",\"Infrastructure\",\"Rail Network\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\",\"name\":\"[VIDEO] Two key HS2 viaducts completed over Christmas\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg\",\"datePublished\":\"2026-01-02T10:44:51+00:00\",\"description\":\"Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg\",\"width\":2000,\"height\":1500,\"caption\":\"Image: \u00a9HS2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"[VIDEO] Two key HS2 viaducts completed over Christmas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3\",\"name\":\"Matt Brundrett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g\",\"caption\":\"Matt Brundrett\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/mattbrundrett\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"[VIDEO] Two key HS2 viaducts completed over Christmas","description":"Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/","og_locale":"en_US","og_type":"article","og_title":"[VIDEO] Two key HS2 viaducts completed over Christmas","og_description":"Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year","og_url":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-01-02T10:44:51+00:00","og_image":[{"width":2000,"height":1500,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg","type":"image\/jpeg"}],"author":"Matt Brundrett","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/"},"author":{"name":"Matt Brundrett","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3"},"headline":"[VIDEO] Two key HS2 viaducts completed over Christmas","datePublished":"2026-01-02T10:44:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/"},"wordCount":600,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg","keywords":["HS2","Infrastructure","Rail Network"],"articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/","url":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/","name":"[VIDEO] Two key HS2 viaducts completed over Christmas","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg","datePublished":"2026-01-02T10:44:51+00:00","description":"Two key HS2 viaducts near Water Orton have been completed, allowing work to begin over other major roads into the new year","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/01\/20251227_HS2-Water-Orton-1-and-2-viaducts-over-the-Birmingham-to-Nuneaton-line-27-scaled.jpg","width":2000,"height":1500,"caption":"Image: \u00a9HS2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-two-key-hs2-viaducts-completed-over-christmas\/158054\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"[VIDEO] Two key HS2 viaducts completed over Christmas"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3","name":"Matt Brundrett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g","caption":"Matt Brundrett"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/mattbrundrett\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-24 10:12:41","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/158054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=158054"}],"version-history":[{"count":3,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/158054\/revisions"}],"predecessor-version":[{"id":158059,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/158054\/revisions\/158059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/158055"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=158054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=158054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=158054"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=158054"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=158054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}