{"id":159679,"date":"2026-02-25T07:39:13","date_gmt":"2026-02-25T07:39:13","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=159679"},"modified":"2026-02-24T14:42:41","modified_gmt":"2026-02-24T14:42:41","slug":"dalkia-deliver-me-systems-new-british-museum-energy-centre","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/","title":{"rendered":"Dalkia to deliver M&#038;E systems for new British Museum energy centre"},"content":{"rendered":"<h2>EDF subsidiary Dalkia will oversee M&amp;E works on the British Musuem&#8217;s new energy centre, which will cut carbon emissions by around 1,700 tonnes a year<\/h2>\n<p>Part of plans to phase out fossil fuels from the British Museum estate, the scheme is comprised of a new energy centre, additional plant in the East Road building and a secondary plant building, in total representing 1.8% of the Musuem&#8217;s total footprint.<\/p>\n<p>Sir Robert McAlpine is the main contractor for the energy centre, whereas Quinn is delivering structural and civils works on the East Road building.<\/p>\n<p>Valued at \u00a333m by Glenigan, the overall programme is scheduled for completion in 2029.<\/p>\n<h3>Modernising the energy infrastructure of a heritage estate<\/h3>\n<p>The refurbishment programme will replace the existing gas-fired boiler plant with an all-electric system, adding 5.1MW air-source and 7MW water-source<a href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/proven-by-physics-heat-pumps-work\/158171\/\" target=\"_blank\" rel=\"noopener\"> heat pumps<\/a>, as well as a 900kW electrical boiler for additional capacity.<\/p>\n<p>The Museum believes these upgrades will reduce carbon emissions by 1,700 tonnes a year by eliminating direct emissions from the site&#8217;s current gas boilers.<\/p>\n<p>To more efficiently distribute energy across the site, planned infrastructure upgrades include new cabling and pipework, a new high-voltage ring main, low-temperature hot water services, rewiring of sub-mains and relocation of the high-voltage intake substation.<\/p>\n<p>The new facilities have all been designed to integrate with the Camden site&#8217;s <a href=\"https:\/\/historicengland.org.uk\/listing\/the-list\/list-entry\/1130404\" target=\"_blank\" rel=\"noopener\">Grade I-listed buildings<\/a>, by lead consultant and MEP engineer Steensen Varming and architect Wright &amp; Wright.<\/p>\n<h3>Strengthening the &#8220;resilience and sustainability of our estate for decades ahead&#8221;<\/h3>\n<p>Colin Brunton, regional managing director at Dalkia, said: \u201cWe are proud to deliver infrastructure upgrades that align with the museum\u2019s sustainability objectives while preserving its operational integrity throughout the works.\u201d<\/p>\n<p>British Museum managing director Judith McNicol said: \u201cModernising our energy infrastructure is essential to transforming the museum, reducing our environmental impact and ensuring we can continue to care for the collection for generations to come. Dalkia\u2019s expertise in delivering complex, low-carbon energy solutions gives us confidence that this programme will strengthen the resilience and sustainability of our estate for decades ahead.\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>EDF subsidiary Dalkia will oversee M&#038;E works on the British Musuem&#8217;s new energy centre, which will cut carbon emissions by around 1,700 tonnes a year. <\/p>\n","protected":false},"author":25,"featured_media":159681,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[307],"tags":[430,173211,675,172774],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-159679","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-energy-news","8":"tag-energy-efficiency","9":"tag-heat-pumps","10":"tag-heritage","11":"tag-retrofitting"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dalkia to deliver M&amp;E systems for new British Museum energy centre<\/title>\n<meta name=\"description\" content=\"Dalkia will oversee M&amp;E works on the British Musuem&#039;s new energy centre, which will cut carbon emissions by around 1,700 tonnes a year\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dalkia to deliver M&amp;E systems for new British Museum energy centre\" \/>\n<meta property=\"og:description\" content=\"Dalkia will oversee M&amp;E works on the British Musuem&#039;s new energy centre, which will cut carbon emissions by around 1,700 tonnes a year\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-25T07:39:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1254\" \/>\n\t<meta property=\"og:image:height\" content=\"836\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Harriet Clough\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\"},\"author\":{\"name\":\"Harriet Clough\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\"},\"headline\":\"Dalkia to deliver M&#038;E systems for new British Museum energy centre\",\"datePublished\":\"2026-02-25T07:39:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\"},\"wordCount\":352,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg\",\"keywords\":[\"Energy Efficiency\",\"Heat Pumps\",\"Heritage sites\",\"Retrofitting\"],\"articleSection\":[\"Energy News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\",\"name\":\"Dalkia to deliver M&E systems for new British Museum energy centre\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg\",\"datePublished\":\"2026-02-25T07:39:13+00:00\",\"description\":\"Dalkia will oversee M&E works on the British Musuem's new energy centre, which will cut carbon emissions by around 1,700 tonnes a year\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg\",\"width\":1254,\"height\":836,\"caption\":\"\u00a9Michael Mulkens | iStock\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dalkia to deliver M&#038;E systems for new British Museum energy centre\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356\",\"name\":\"Harriet Clough\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g\",\"caption\":\"Harriet Clough\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dalkia to deliver M&E systems for new British Museum energy centre","description":"Dalkia will oversee M&E works on the British Musuem's new energy centre, which will cut carbon emissions by around 1,700 tonnes a year","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/","og_locale":"en_US","og_type":"article","og_title":"Dalkia to deliver M&E systems for new British Museum energy centre","og_description":"Dalkia will oversee M&E works on the British Musuem's new energy centre, which will cut carbon emissions by around 1,700 tonnes a year","og_url":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-02-25T07:39:13+00:00","og_image":[{"width":1254,"height":836,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg","type":"image\/jpeg"}],"author":"Harriet Clough","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/"},"author":{"name":"Harriet Clough","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356"},"headline":"Dalkia to deliver M&#038;E systems for new British Museum energy centre","datePublished":"2026-02-25T07:39:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/"},"wordCount":352,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg","keywords":["Energy Efficiency","Heat Pumps","Heritage sites","Retrofitting"],"articleSection":["Energy News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/","url":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/","name":"Dalkia to deliver M&E systems for new British Museum energy centre","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg","datePublished":"2026-02-25T07:39:13+00:00","description":"Dalkia will oversee M&E works on the British Musuem's new energy centre, which will cut carbon emissions by around 1,700 tonnes a year","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/02\/iStock-615099890.jpg","width":1254,"height":836,"caption":"\u00a9Michael Mulkens | iStock"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/dalkia-deliver-me-systems-new-british-museum-energy-centre\/159679\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Dalkia to deliver M&#038;E systems for new British Museum energy centre"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/0beefb03e9cfaf5fa036d3ce55ada356","name":"Harriet Clough","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b0cfdd3163c72e81d453787c0a3e3e02f2919965d9b1bc8206dbd5dccd07966?s=96&d=mm&r=g","caption":"Harriet Clough"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/harrietclough\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-02 04:10:11","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/159679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=159679"}],"version-history":[{"count":2,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/159679\/revisions"}],"predecessor-version":[{"id":159688,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/159679\/revisions\/159688"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/159681"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=159679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=159679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=159679"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=159679"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=159679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}