{"id":164000,"date":"2026-07-22T12:55:09","date_gmt":"2026-07-22T11:55:09","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=164000"},"modified":"2026-07-22T12:55:09","modified_gmt":"2026-07-22T11:55:09","slug":"digital-construction-site-assessment-tool-halves-durham-wait-time","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/","title":{"rendered":"Digital construction site assessment tool halves Durham wait time"},"content":{"rendered":"<h2>A new PlaceMaker tool has been used in a trial run by <a href=\"https:\/\/www.durham.gov.uk\/\" target=\"_blank\" rel=\"noopener\">Durham County Council<\/a>, and found that the time needed to assess sites was reduced by 50%<\/h2>\n<p>The digital construction site assessment tool also saved an estimated \u00a310,403 in annual operational costs.<\/p>\n<p>PlaceMaker is a local plan platform that can assess development sites and manage site information.<\/p>\n<h3>The pilot was conducted in 2024<\/h3>\n<p>This test was a part of a PropTech Innovation Fund round, and the test area was chosen as improvement in assessment time was very much needed.<\/p>\n<p>The council\u2019s objectives were:<\/p>\n<ul>\n<li>Reduce the time and cost of assessing a large number of sites<\/li>\n<li>Standardise assessment criteria and scoring across the authority<\/li>\n<li>Reduce reliance on manual processes and spreadsheets<\/li>\n<li>Improve transparency and consistency in decision-making<\/li>\n<li>Create an approach that could be reused and scaled<\/li>\n<\/ul>\n<p>Before the introduction of PlaceMaker, site assessments required multiple teams, tools, and handovers, with reliance on geographic information system (GIS) analysis, research, and manual data entry in spreadsheets and documents.<\/p>\n<p>As a result, PlaceMaker was introduced in this pilot to replace the spreadsheet and manual processes used in assessment. The Strategic Housing Land Acailability Assessment was moved onto the platform, and a standardised Housing and Economic Land Availability Assessment database structure was built to be shared with other councils that will use PlaceMaker.<\/p>\n<h3>The platform was effective<\/h3>\n<p>The platform was used to:<\/p>\n<ul>\n<li>Assess potential sites using a shared set of criteria<\/li>\n<li>Record assessment information in a consistent digital format<\/li>\n<li>Update assessments as evidence or assumptions changed<\/li>\n<li>Reuse assessment data instead of recreating it at each stage<\/li>\n<\/ul>\n<p>The results speak for themselves, as assessment time was halved, being consolidated into a single digital workflow, and the reliance on spreadsheets and manual <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/blink-imaging-laser-scanner-from-quick-data-capture-to-improved-clarity\/163763\/\" target=\"_blank\" rel=\"noopener\">data handling<\/a> was vastly reduced.<\/p>\n<p>Duplication between team and systems was also reduced, parts of the data handling and workflows were automated, which in turn reduced the need for manual updates and freed up assessment officers\u2019 time.<\/p>\n<p>Costs were cut by an estimated \u00a310,403 via reduced time spent by officers on assessment tasks, less reliance on GIS, and reduced frequency of handovers between teams and tools.<\/p>\n<p>Durham County Council found that:<\/p>\n<ul>\n<li>Standardising assessment criteria and workflows made the process more efficient and easier to repeat<\/li>\n<li>The biggest time savings came from reducing manual data handling and duplication<\/li>\n<li>Upfront configuration and testing is essential to build trust in outputs<\/li>\n<li>Structuring assessments digitally makes them easier to update and reuse as evidence changes<\/li>\n<li>Digital tools work best when they support professional judgement rather than replacing it<\/li>\n<\/ul>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments.<\/p>\n","protected":false},"author":32,"featured_media":164001,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172736,141293],"tags":[574,997,172737,173333],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-164000","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction-software-news","8":"category-digital-construction-news","9":"tag-data-management","10":"tag-development","11":"tag-project-management-software","12":"tag-site-management"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Digital construction site assessment tool halves Durham wait time<\/title>\n<meta name=\"description\" content=\"Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Digital construction site assessment tool halves Durham wait time\" \/>\n<meta property=\"og:description\" content=\"Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T11:55:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1404\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Matt Brundrett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\"},\"author\":{\"name\":\"Matt Brundrett\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3\"},\"headline\":\"Digital construction site assessment tool halves Durham wait time\",\"datePublished\":\"2026-07-22T11:55:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\"},\"wordCount\":426,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg\",\"keywords\":[\"Data Management\",\"Development\",\"Project Management Software\",\"Site Management\"],\"articleSection\":[\"Construction Software News\",\"Digital Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\",\"name\":\"Digital construction site assessment tool halves Durham wait time\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg\",\"datePublished\":\"2026-07-22T11:55:09+00:00\",\"description\":\"Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg\",\"width\":2048,\"height\":1404,\"caption\":\"Image: iStock | \u00a9 TraceyAPhotos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Digital construction site assessment tool halves Durham wait time\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3\",\"name\":\"Matt Brundrett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g\",\"caption\":\"Matt Brundrett\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/mattbrundrett\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Digital construction site assessment tool halves Durham wait time","description":"Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/","og_locale":"en_US","og_type":"article","og_title":"Digital construction site assessment tool halves Durham wait time","og_description":"Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-07-22T11:55:09+00:00","og_image":[{"width":2048,"height":1404,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg","type":"image\/jpeg"}],"author":"Matt Brundrett","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/"},"author":{"name":"Matt Brundrett","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3"},"headline":"Digital construction site assessment tool halves Durham wait time","datePublished":"2026-07-22T11:55:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/"},"wordCount":426,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg","keywords":["Data Management","Development","Project Management Software","Site Management"],"articleSection":["Construction Software News","Digital Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/","name":"Digital construction site assessment tool halves Durham wait time","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg","datePublished":"2026-07-22T11:55:09+00:00","description":"Durham County Council trialled a digital construction site assessment tool, which they found halved the time taken to assess developments","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/iStock-2161239541-scaled.jpg","width":2048,"height":1404,"caption":"Image: iStock | \u00a9 TraceyAPhotos"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-construction-site-assessment-tool-halves-durham-wait-time\/164000\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Digital construction site assessment tool halves Durham wait time"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/594ba5cf5982e9dea55db60cc67201c3","name":"Matt Brundrett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/988ad917057a66900e50efa03ae6e49ec25b0b95febda9277235cc945c2ff8ec?s=96&d=mm&r=g","caption":"Matt Brundrett"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/mattbrundrett\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-18 15:15:39","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/164000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=164000"}],"version-history":[{"count":2,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/164000\/revisions"}],"predecessor-version":[{"id":164003,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/164000\/revisions\/164003"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/164001"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=164000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=164000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=164000"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=164000"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=164000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}