{"id":164010,"date":"2026-07-22T14:43:25","date_gmt":"2026-07-22T13:43:25","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=164010"},"modified":"2026-07-22T14:43:25","modified_gmt":"2026-07-22T13:43:25","slug":"why-construction-sectors-dispute-problem-starts-long-before-dispute","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/","title":{"rendered":"Why the construction sector&#8217;s dispute problem starts long before the dispute"},"content":{"rendered":"<h2>As commercial disputes and insolvencies climb across construction, the industry&#8217;s attention is turning to a less obvious cause: not poor workmanship, but poor evidence. For subcontractors carrying the risk, that distinction is becoming commercially critical<\/h2>\n<p>Construction disputes are rising, and so is the cost of losing them. Insolvencies across the sector have grown sharply in recent years, and commercial disagreements\u2014over defects, delays, and remedial liability\u2014are a significant contributor. Much of the policy conversation around this focuses on payment terms, contract structures, and risk allocation up the supply chain.<\/p>\n<p>Less attention goes to a simpler, quieter cause sitting underneath many of these disputes: subcontractors often cannot prove work was done correctly, even when it was.<\/p>\n<p>This isn&#8217;t a workmanship problem. It&#8217;s a documentation one\u2014and it disproportionately affects the businesses with the least commercial leverage to absorb it.<\/p>\n<h3>Where the evidence gap actually sits<\/h3>\n<p>A <a href=\"https:\/\/onetrace.com\/use-cases\/evidencing\" target=\"_blank\" rel=\"noopener\">remedial claim<\/a> typically surfaces weeks after practical completion, once another trade has moved through the area, access has closed, or the element in question is concealed behind a finished surface. At that point, the subcontractor knows the work was compliant. Proving it is a separate problem entirely.<\/p>\n<p>Most site evidence still isn&#8217;t built for this moment. Photographs sit in shared folders or messaging apps. Job sheets describe work in general terms rather than against specific locations. Drawings are marked up by hand, if at all. None of this is a record a subcontractor can produce quickly and precisely when a client raises a query about one specific location, months later.<\/p>\n<p>Once that query lands, the burden of proof sits entirely with the subcontractor\u2014and without a structured, location-specific record, it&#8217;s very difficult to meet.<\/p>\n<h3>What changes when evidence is structured<\/h3>\n<p>City Fire Proofing, which runs up to 40 live passive fire protection projects at any one time, encountered this at scale. Chrissy Briant, the company&#8217;s document controller and QA manager, is direct about what was at stake: without a system built for it, record-keeping at that volume becomes chaotic fast.<\/p>\n<p>Using <a href=\"https:\/\/onetrace.com\/company\/about-us\" target=\"_blank\" rel=\"noopener\">Onetrace<\/a>, the company&#8217;s site teams now log work\u2014photos, forms, sign-off\u2014against exact locations on the drawing, timestamped, as the work happens. When a client later queried an installation in an occupied building, the team didn&#8217;t need to open a single ceiling to investigate. The photographic record from the point of install settled it immediately.<\/p>\n<figure id=\"attachment_164013\" aria-describedby=\"caption-attachment-164013\" style=\"width: 708px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-164013 \" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-300x172.jpg\" alt=\"\" width=\"708\" height=\"406\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-300x172.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-1024x588.jpg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-768x441.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-1536x883.jpg 1536w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-scaled.jpg 2048w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-731x420.jpg 731w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-696x400.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-1068x614.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-1920x1103.jpg 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/Onetrace_editorial-image-2_Hero_Digital_Site-610x351.jpg 610w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><figcaption id=\"caption-attachment-164013\" class=\"wp-caption-text\">Image: \u00a9 Onetrace<\/figcaption><\/figure>\n<p>The pattern has held beyond that one instance. Briant reports a measurable drop in rework and remediation on the company&#8217;s projects, directly attributable to being able to produce compliance evidence on request rather than reconstructing it after the fact.<\/p>\n<h3>The commercial case for a golden thread that works day-to-day<\/h3>\n<p>The &#8220;golden thread&#8221; of information is now a familiar phrase across the sector, largely in the context of building safety legislation. But its practical value extends well beyond regulatory compliance\u2014it&#8217;s a live commercial asset. Structured, continuous evidence doesn&#8217;t just satisfy an auditor; it changes the outcome of a dispute before it starts.<\/p>\n<p>It also reshapes handover. When evidence accumulates against drawings throughout a project rather than being assembled under pressure at the end, handover documentation is largely complete before practical completion is reached. Briant notes that on large projects, this has cut handover pack production from weeks to days\u2014a shift with direct downstream value for main contractors managing multiple live handovers and clients wanting a clean commercial close.<\/p>\n<p>Will Naylor, chief operating officer at CLM Fireproofing, frames the client-facing effect: giving clients direct system access to check completed work builds a transparency that matters increasingly in a market where scrutiny of subcontractor delivery is only going up.<\/p>\n<h3>The window closes fast<\/h3>\n<p>There is no retrospective fix for missing site evidence. Once a job completes and other trades have moved through, the opportunity to build a defensible record has gone with it.<\/p>\n<p>For an industry grappling with rising disputes and tightening margins, the subcontractors adjusting their approach aren&#8217;t necessarily responding to one bad experience. Most have simply concluded that the cost of an indefensible dispute is too high to leave to chance\u2014and that the fix starts on site, not in a claims process.<\/p>\n<p>To see how subcontractors across the fire protection and passive fire sector are building this in from day one, visit <a href=\"http:\/\/onetrace.com\" target=\"_blank\" rel=\"noopener\">onetrace.com<\/a>.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation.<\/p>\n","protected":false},"author":37,"featured_media":164011,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172736,141293],"tags":[88176,16990,172727,173203],"stakeholder_rel_tag":[173357],"contributor_rel_tag":[],"class_list":{"0":"post-164010","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction-software-news","8":"category-digital-construction-news","9":"tag-construction-disputes","10":"tag-construction-software","11":"tag-featured","12":"tag-payment-processes","13":"stakeholder_rel_tag-onetrace"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Why the construction sector&#039;s dispute problem starts long before the dispute<\/title>\n<meta name=\"description\" content=\"Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Why the construction sector&#039;s dispute problem starts long before the dispute\" \/>\n<meta property=\"og:description\" content=\"Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T13:43:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1232\" \/>\n\t<meta property=\"og:image:height\" content=\"928\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Megan Traviss\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\"},\"author\":{\"name\":\"Megan Traviss\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980\"},\"headline\":\"Why the construction sector&#8217;s dispute problem starts long before the dispute\",\"datePublished\":\"2026-07-22T13:43:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\"},\"wordCount\":740,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png\",\"keywords\":[\"Construction disputes\",\"Construction Software\",\"Featured\",\"Payment processes\"],\"articleSection\":[\"Construction Software News\",\"Digital Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\",\"name\":\"Why the construction sector's dispute problem starts long before the dispute\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png\",\"datePublished\":\"2026-07-22T13:43:25+00:00\",\"description\":\"Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png\",\"width\":1232,\"height\":928,\"caption\":\"Image: \u00a9 Onetrace\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why the construction sector&#8217;s dispute problem starts long before the dispute\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980\",\"name\":\"Megan Traviss\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"caption\":\"Megan Traviss\"},\"sameAs\":[\"http:\/\/www.pbctoday.co.uk\/\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/megantraviss\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Why the construction sector's dispute problem starts long before the dispute","description":"Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/","og_locale":"en_US","og_type":"article","og_title":"Why the construction sector's dispute problem starts long before the dispute","og_description":"Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-07-22T13:43:25+00:00","og_image":[{"width":1232,"height":928,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png","type":"image\/png"}],"author":"Megan Traviss","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/"},"author":{"name":"Megan Traviss","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980"},"headline":"Why the construction sector&#8217;s dispute problem starts long before the dispute","datePublished":"2026-07-22T13:43:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/"},"wordCount":740,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png","keywords":["Construction disputes","Construction Software","Featured","Payment processes"],"articleSection":["Construction Software News","Digital Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/","name":"Why the construction sector's dispute problem starts long before the dispute","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png","datePublished":"2026-07-22T13:43:25+00:00","description":"Construction disputes are rising, and so is the cost of losing them due to payment terms, contract structures, and risk allocation","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/07\/onetrace-construction_supervisor.png","width":1232,"height":928,"caption":"Image: \u00a9 Onetrace"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/why-construction-sectors-dispute-problem-starts-long-before-dispute\/164010\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Why the construction sector&#8217;s dispute problem starts long before the dispute"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980","name":"Megan Traviss","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","caption":"Megan Traviss"},"sameAs":["http:\/\/www.pbctoday.co.uk\/"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/megantraviss\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-21 18:28:45","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/164010","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=164010"}],"version-history":[{"count":1,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/164010\/revisions"}],"predecessor-version":[{"id":164015,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/164010\/revisions\/164015"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/164011"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=164010"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=164010"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=164010"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=164010"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=164010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}