{"id":165921,"date":"2026-09-22T12:25:09","date_gmt":"2026-09-22T11:25:09","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=165921"},"modified":"2026-09-22T12:25:09","modified_gmt":"2026-09-22T11:25:09","slug":"hs2s-m42-viaduct-lifts-enter-final-stage-of-construction","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/","title":{"rendered":"HS2\u2019s M42 viaduct lifts enter final stage of construction"},"content":{"rendered":"<h2>HS2 engineers have lifted the last of six huge viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway<\/h2>\n<p>The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned.<\/p>\n<p>HS2&#8217;s West Midlands construction partner, Balfour Beatty VINCI, led operations at both sites, building on progress over four weekends this summer.<\/p>\n<p>Oliver Shore, Project Director for Balfour Beatty VINCI, explained: \u201cThe twin box and Water Orton Viaducts are three major structures that cross the busy M42 motorway. In just four weekends, we\u2019ve completed the bridging works on each, closing the gap over the north and southbound carriageways.\u201d<\/p>\n<h3>300m viaduct will help trains travel above the M42<\/h3>\n<p>To take full advantage of the closure, a separate team &#8211; three miles to the south \u2013 spent the weekend lifting the last beams that will support another major HS2 bridge known as the \u2018twin box\u2019.<\/p>\n<p>The 300-metre-long structure near the NEC is formed of two boxes that will support the railway as it passes over the carriageways. This approach has been chosen because of the angle at which the railway must cross the motorway.<\/p>\n<figure id=\"attachment_165923\" aria-describedby=\"caption-attachment-165923\" style=\"width: 703px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-165923\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-300x168.png\" alt=\"\" width=\"703\" height=\"394\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-300x168.png 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1024x575.png 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-768x431.png 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1536x862.png 1536w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-scaled.png 2048w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-748x420.png 748w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-696x391.png 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1068x600.png 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1920x1078.png 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-610x342.png 610w\" sizes=\"auto, (max-width: 703px) 100vw, 703px\" \/><figcaption id=\"caption-attachment-165923\" class=\"wp-caption-text\">Image: \u00a9 HS2<\/figcaption><\/figure>\n<p>The construction programme was meticulously planned over four weekends, spaced across the summer months, with engineers working on all three structures at the same time to reduce closures.<\/p>\n<h3>The final stages of construction can now commence<\/h3>\n<p>Engineers can now proceed to the final stages of construction \u2013 installing the remaining parapets along the sides of the Water Orton viaducts, and the final concrete pours on the twin box ready for railway tracks to be laid.<\/p>\n<p>Agnes Usciak, HS2\u2019s senior project manager, said: \u201cI\u2019d like to thank motorists and local residents for their patience during this huge programme of work \u2013 our biggest yet over the motorway network.<\/p>\n<p>\u201cSplitting a huge construction programme into four separate weekends requires meticulous planning, and our engineers executed the entire operation with pin-point precision, ensuring the motorway reopened on time, every time.<\/p>\n<p>\u201cStructural completion of the Water Orton viaducts and the twin box means the end is in sight for our bumper programme of motorway works this year.\u201d<\/p>\n<h3>What\u2019s next for the M42 bridge project?<\/h3>\n<p>In the coming days, Balfour Beatty VINCI\u2019s engineers will extend Water Orton 2 by a further 40 metres, closing the final gap above Gilson Road.<\/p>\n<p>The M42 will close again from 9pm on Friday, 23 October to 5am on Monday, 26th October, to install the viaduct\u2019s parapets on the sections directly above the motorway.<\/p>\n<p>Progress is also being made on other parts of the project with the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/video-hs2-old-oak-common-platforms-completed\/164696\/\" target=\"_blank\" rel=\"noopener\">platforms now in place at Old Oak Common<\/a>, the first \u2018green tunnel\u2019 complete and the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/last-hs2-curzon-street-viaducts-launched\/164898\/\" target=\"_blank\" rel=\"noopener\">Curzon 2 viaduct<\/a> on the approach to Curzon Street now in place.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>HS2 engineers have lifted the last of six huge viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway.<\/p>\n","protected":false},"author":37,"featured_media":165922,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172731],"tags":[473,579,928],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-165921","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-projects","8":"tag-hs2","9":"tag-infrastructure","10":"tag-rail-network"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>HS2\u2019s M42 viaduct lifts enter final stage of construction<\/title>\n<meta name=\"description\" content=\"The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HS2\u2019s M42 viaduct lifts enter final stage of construction\" \/>\n<meta property=\"og:description\" content=\"The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-22T11:25:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Megan Traviss\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\"},\"author\":{\"name\":\"Megan Traviss\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980\"},\"headline\":\"HS2\u2019s M42 viaduct lifts enter final stage of construction\",\"datePublished\":\"2026-09-22T11:25:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\"},\"wordCount\":484,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg\",\"keywords\":[\"HS2\",\"Infrastructure\",\"Rail Network\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\",\"name\":\"HS2\u2019s M42 viaduct lifts enter final stage of construction\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg\",\"datePublished\":\"2026-09-22T11:25:09+00:00\",\"description\":\"The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg\",\"width\":2048,\"height\":1152,\"caption\":\"Image: \u00a9 HS2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"HS2\u2019s M42 viaduct lifts enter final stage of construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980\",\"name\":\"Megan Traviss\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"caption\":\"Megan Traviss\"},\"sameAs\":[\"http:\/\/www.pbctoday.co.uk\/\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/megantraviss\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"HS2\u2019s M42 viaduct lifts enter final stage of construction","description":"The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/","og_locale":"en_US","og_type":"article","og_title":"HS2\u2019s M42 viaduct lifts enter final stage of construction","og_description":"The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned","og_url":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-09-22T11:25:09+00:00","og_image":[{"width":2048,"height":1152,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg","type":"image\/jpeg"}],"author":"Megan Traviss","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/"},"author":{"name":"Megan Traviss","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980"},"headline":"HS2\u2019s M42 viaduct lifts enter final stage of construction","datePublished":"2026-09-22T11:25:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/"},"wordCount":484,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg","keywords":["HS2","Infrastructure","Rail Network"],"articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/","url":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/","name":"HS2\u2019s M42 viaduct lifts enter final stage of construction","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg","datePublished":"2026-09-22T11:25:09+00:00","description":"The M42 viaduct operation was completed early on Monday morning, with the motorway reopening at around 4am as planned","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/09\/The-final-Water-Orton-span-being-lifted-across-the-M24-during-the-September-closure-scaled.jpg","width":2048,"height":1152,"caption":"Image: \u00a9 HS2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/projects\/hs2s-m42-viaduct-lifts-enter-final-stage-of-construction\/165921\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"HS2\u2019s M42 viaduct lifts enter final stage of construction"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980","name":"Megan Traviss","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","caption":"Megan Traviss"},"sameAs":["http:\/\/www.pbctoday.co.uk\/"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/megantraviss\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-29 14:48:04","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/165921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=165921"}],"version-history":[{"count":2,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/165921\/revisions"}],"predecessor-version":[{"id":165925,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/165921\/revisions\/165925"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/165922"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=165921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=165921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=165921"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=165921"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=165921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}