{"id":167487,"date":"2026-11-10T08:39:39","date_gmt":"2026-11-10T08:39:39","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=167487"},"modified":"2026-11-10T08:39:39","modified_gmt":"2026-11-10T08:39:39","slug":"construction-robotics-site-deployment-economics","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/","title":{"rendered":"Construction robotics needs a business case measured across the whole shift"},"content":{"rendered":"<h2>A robot&#8217;s task speed is only one part of its on-site value. Contractors need to account for preparation, access, supervision and exceptions before judging whether automation improves the delivery of a complete work package<\/h2>\n<p>A machine can drill a hole quickly while the work package around it moves slowly. It may wait for access, a revised layout, a clear floor or confirmation that the proposed location is suitable. Construction robotics therefore presents a commercial question that cannot be answered by watching a single successful cycle.<\/p>\n<p>Robotics can be useful in tasks that are repetitive, physically demanding or difficult to measure consistently. Yet a construction site changes as work proceeds. Equipment, materials and people move; information is revised; and the next location may differ from the one just completed. <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/automation-in-construction-is-shifting\/166570\/\" target=\"_blank\" rel=\"noopener\">Automation has to operate within that changing production system<\/a>.<\/p>\n<p>For contractors, the useful starting point is a bounded task with a clear acceptance requirement. The business case should then follow the work from preparation to completion, including the human effort that makes the automated step possible. This reveals where a robot creates capacity and where it merely transfers work elsewhere.<\/p>\n<h3>Match the task to the machine&#8217;s actual capability<\/h3>\n<p>Hilti describes its <a href=\"https:\/\/www.hilti.co.uk\/content\/hilti\/E1\/GB\/en\/business\/business\/trends\/jaibot-semi-autonomous-drilling-robot.html\" target=\"_blank\" rel=\"noopener\">Jaibot as a semi-autonomous ceiling-drilling robot<\/a> that uses a digital plan to mark and drill holes. Its published workflow includes transferring design information and establishing layout with a total station. This is a manufacturer&#8217;s description of capability, not independent proof of productivity gains on every project.<\/p>\n<p>The example shows why task boundaries matter. Marking and drilling are parts of installation, but they are not the whole installation. Design coordination, substrate checks, access planning, fixing selection and subsequent assembly remain relevant. A contractor should identify which activities the proposed system performs, which it assists and which remain with the existing team.<\/p>\n<p>Other automated systems may carry out setting out, inspection, material handling or earthmoving. They should not be grouped into a single productivity category. A robot collecting images can tolerate different operating conditions and deliver different evidence from one applying force to a structure. Its deployment case needs to reflect the specific task and the consequences of error.<\/p>\n<h3>Repeatability comes from the work environment too<\/h3>\n<p>Repetition is valuable because it allows setup effort to be spread over more useful output. A series of similar areas may suit a system better than scattered locations requiring frequent moves and reconfiguration. This does not make irregular projects unsuitable in principle, but it changes the time and effort needed to make them work.<\/p>\n<p>Site readiness includes physical and informational conditions. The machine needs access and a suitable working area, while the team needs an approved task definition and reliable location information. If either changes after setup, the expected production rate may disappear. Planning automation therefore involves the surrounding trades and logistics team as well as the equipment supplier.<\/p>\n<p>Layout is a particularly important connection between digital and physical work. A correct instruction in the wrong coordinate frame can produce an accurately executed mistake. The process should verify the relationship between the approved design, site control and the machine&#8217;s working position before production begins, and after events that could disturb that relationship.<\/p>\n<p>A pilot should record these dependencies rather than hide them as exceptional delays. If floors routinely contain stored material or access is frequently interrupted, that is part of the environment in which the robot must earn its return. A demonstration area prepared to ideal conditions provides useful evidence of capability but a limited estimate of everyday productivity.<\/p>\n<h3>Research demonstrations show possibilities, not fleet economics<\/h3>\n<p>Researchers at ETH Zurich reported an autonomous excavator building a dry-stone wall six metres high and 65 metres long in 2023. Their <a href=\"https:\/\/ethz.ch\/en\/news-and-events\/eth-news\/news\/2023\/11\/autonomous-excavator-constructs-a-six-metre-high-dry-stone-wall.html\" target=\"_blank\" rel=\"noopener\">published account of the HEAP deployment<\/a> describes scanning stones, estimating relevant properties and selecting placement positions. The work shows how to handle irregular materials through sensing and planning.<\/p>\n<p>It does not establish that the same system is commercially ready for every contractor or that its cost will beat conventional work on an unrelated site. Research can demonstrate a technical method without resolving support arrangements, utilisation, procurement or maintenance economics. Those questions become central when a business moves from observing a result to depending on the equipment.<\/p>\n<p>The distinction is useful for suppliers as well as buyers. A commercial pilot can state what has already been demonstrated and what the deployment is intended to learn. It can then gather evidence about ordinary operators, realistic access constraints and complete task sequences, rather than treating every trial as a performance showcase.<\/p>\n<h3>Safety belongs to the integrated operation<\/h3>\n<p>The Health and Safety Executive&#8217;s <a href=\"https:\/\/www.hse.gov.uk\/Research\/rrhtm\/rr1214.htm\" target=\"_blank\" rel=\"noopener\">machinery safety research report RR1214<\/a> considers how existing standards and guidance address emerging technologies, including autonomous mobile robots. HSE&#8217;s summary distinguishes requirements for supplying machinery from those for its safe use and maintenance at work. Buying equipment and integrating it into a changing site are related but separate responsibilities.<\/p>\n<p>The practical assessment must consider the machine, its task and the people sharing the space. Removing someone from repetitive overhead work can be valuable, while introducing a moving machine changes access and interaction arrangements. The team needs to understand normal operation, foreseeable interruptions and the circumstances in which work must stop.<\/p>\n<p>Recovery deserves explicit attention. A stalled process, blocked route or unexpected object may require human intervention. The procedure for that intervention should be part of deployment planning, rather than improvised under programme pressure. Site users also need to know how to recognise the system&#8217;s status and who is responsible for restarting it.<\/p>\n<p>Automation does not remove the need to accept the finished work. A record that the machine completed a programmed action is evidence of execution, but it may not establish that the result meets every project requirement. Inspection and acceptance should address the actual output and retain a route for handling discrepancies.<\/p>\n<h3>Count accepted output across a complete shift<\/h3>\n<p>A useful productivity comparison begins with the quantity of accepted work delivered during the full working period. It includes mobilisation, setup, calibration or positioning, operation, interruption, checking and demobilisation. Labour spent preparing digital instructions or resolving exceptions also belongs in the comparison, even if it occurs away from the workface.<\/p>\n<p>Then examine utilisation. Equipment that works efficiently for a short period may still carry substantial hire, transport and support costs during idle time. A sequence of suitable projects can change the investment case by spreading fixed costs and retaining trained people. Conversely, a one-off package may favour a service arrangement over owning specialist equipment.<\/p>\n<p>The counterfactual should be realistic. Compare automation with the method the contractor would actually use, including appropriate tools and competent crews, rather than with an artificially inefficient manual process. Match the scope and quality requirements. Otherwise, an apparent gain may reflect different work content or a different acceptance threshold.<\/p>\n<p>Benefits beyond labour hours also deserve evidence. Reduced exposure to strenuous work, more consistent records or less rework may matter commercially and operationally. They should be measured separately so that a weak time saving does not conceal a worthwhile improvement elsewhere, or a strong output figure does not disguise an unresolved quality problem.<\/p>\n<h3>Use pilots to establish a repeatable deployment<\/h3>\n<p>A credible pilot records the starting conditions and the resources required to create them. It should track output, rejected work, interruptions, support calls and the time other trades spend accommodating the machine. Keeping those categories visible lets the team distinguish a technical limitation from a problem better planning could address.<\/p>\n<p>Operators and supervisors should contribute to the assessment. They see awkward access, unclear instructions and recovery steps that may not appear in supplier dashboards. Their experience can identify whether additional training would solve the issue or whether the task itself is poorly matched to the system. That feedback becomes more valuable when it is linked to recorded events.<\/p>\n<p>The decision to expand should follow the conditions under which the pilot succeeded. A contractor may find a strong case for repeated ceiling layouts in clear areas and a weak case for fragmented refurbishment work. That is useful commercial knowledge. Construction robotics becomes investable when the business can recognise suitable work, prepare it consistently and predict the cost of delivering an accepted result.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering accepted work.<\/p>\n","protected":false},"author":37,"featured_media":167488,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[38487,141293],"tags":[431,172950,753],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":["post-167487","post","type-post","status-publish","format-standard","has-post-thumbnail","category-construction-technology-news","category-digital-construction-news","tag-plant-equipment-supplies","tag-robotics","tag-safety"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Construction robotics: Testing the site deployment case<\/title>\n<meta name=\"description\" content=\"Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering work\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction robotics needs a business case measured across the whole shift\" \/>\n<meta property=\"og:description\" content=\"Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering work\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-10T08:39:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1023232352-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"958\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Megan Traviss\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/\"},\"author\":{\"name\":\"Megan Traviss\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/eadde57b3ac1487082d7c73f80e7f980\"},\"headline\":\"Construction robotics needs a business case measured across the whole shift\",\"datePublished\":\"2026-11-10T08:39:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/\"},\"wordCount\":1370,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1023232352-scaled.jpg\",\"keywords\":[\"Plant Equipment &amp; Supplies\",\"Robotics\",\"Safety\"],\"articleSection\":[\"Construction Technology News\",\"Digital Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/\",\"name\":\"Construction robotics: Testing the site deployment case\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1023232352-scaled.jpg\",\"datePublished\":\"2026-11-10T08:39:39+00:00\",\"description\":\"Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering work\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1023232352-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1023232352-scaled.jpg\",\"width\":2048,\"height\":958,\"caption\":\"Image: iStock | \u00a9 ipopba\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/construction-robotics-site-deployment-economics\\\/167487\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction robotics needs a business case measured across the whole shift\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PBCToday\\\/\",\"https:\\\/\\\/x.com\\\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/eadde57b3ac1487082d7c73f80e7f980\",\"name\":\"Megan Traviss\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"caption\":\"Megan Traviss\"},\"sameAs\":[\"http:\\\/\\\/www.pbctoday.co.uk\\\/\"],\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/author\\\/megantraviss\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction robotics: Testing the site deployment case","description":"Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering work","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/","og_locale":"en_US","og_type":"article","og_title":"Construction robotics needs a business case measured across the whole shift","og_description":"Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering work","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-11-10T08:39:39+00:00","og_image":[{"width":2048,"height":958,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1023232352-scaled.jpg","type":"image\/jpeg"}],"author":"Megan Traviss","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/"},"author":{"name":"Megan Traviss","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980"},"headline":"Construction robotics needs a business case measured across the whole shift","datePublished":"2026-11-10T08:39:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/"},"wordCount":1370,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1023232352-scaled.jpg","keywords":["Plant Equipment &amp; Supplies","Robotics","Safety"],"articleSection":["Construction Technology News","Digital Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/","name":"Construction robotics: Testing the site deployment case","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1023232352-scaled.jpg","datePublished":"2026-11-10T08:39:39+00:00","description":"Examine construction robotics through repeatable tasks, changing site conditions, safe integration and the full cost of delivering work","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1023232352-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1023232352-scaled.jpg","width":2048,"height":958,"caption":"Image: iStock | \u00a9 ipopba"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/construction-robotics-site-deployment-economics\/167487\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Construction robotics needs a business case measured across the whole shift"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980","name":"Megan Traviss","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","caption":"Megan Traviss"},"sameAs":["http:\/\/www.pbctoday.co.uk\/"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/megantraviss\/"}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=167487"}],"version-history":[{"count":2,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167487\/revisions"}],"predecessor-version":[{"id":167490,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167487\/revisions\/167490"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/167488"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=167487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=167487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=167487"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=167487"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=167487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}