{"id":167658,"date":"2026-11-13T12:41:37","date_gmt":"2026-11-13T12:41:37","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=167658"},"modified":"2026-11-13T12:41:37","modified_gmt":"2026-11-13T12:41:37","slug":"comparing-modular-and-traditional-building-costs","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/","title":{"rendered":"Comparing modular and traditional building costs"},"content":{"rendered":"<h2 class=\"standfirst\">A factory price and a completed-building price can describe very different scopes. Clients need a common specification, cost boundary and payment profile before deciding which proposal offers better value<\/h2>\n<p>The first task in comparing modular and traditional construction costs is to establish what each price includes. A module supplied from a factory may be only one part of a completed project. Groundworks, transport, lifting, connections and commissioning still need to appear somewhere in the cost plan.<\/p>\n<p>The comparison becomes useful when both proposals describe an equivalent building and a clearly defined delivery scope. Without that common basis, a lower headline figure can conceal work priced elsewhere or left unresolved.<\/p>\n<h3>Begin with the building the client needs<\/h3>\n<p>The specification should identify the intended function, area basis and relevant performance requirements. Differences in finishes, services, acoustics or operating requirements can make two prices incomparable even when the buildings have the same number of rooms.<\/p>\n<p>A cost-per-square-metre figure also needs a stated area convention, location and price date. It should explain whether fees, external works, contingency and tax are included. These details are part of the number\u2019s meaning, not minor footnotes.<\/p>\n<p>The government\u2019s <a href=\"https:\/\/www.gov.uk\/government\/publications\/volumetric-modular-construction-research\/volumetric-modular-construction-research\" target=\"_blank\" rel=\"noopener\">volumetric modular research<\/a> considers procurement alongside manufacture and installation. That connected view helps identify where a project\u2019s cost boundary crosses organisational boundaries.<\/p>\n<h3>Reconcile factory and site scope<\/h3>\n<p>A practical comparison can use four classifications for each cost item: included, excluded, provisional or not yet priced. The purpose is to reveal assumptions before tender totals are compared.<\/p>\n<p>The exercise should involve the people who understand the interfaces. A manufacturer may price a particular connection detail while the site contractor assumes a different responsibility. The resulting gap may remain invisible until installation unless the scopes are reconciled.<\/p>\n<div class=\"table-wrap\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Cost element<\/th>\n<th scope=\"col\">Question to resolve<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Design and coordination<\/td>\n<td>Which design work and interface checks are included?<\/td>\n<\/tr>\n<tr>\n<td>Factory production<\/td>\n<td>What is complete when the module leaves the factory?<\/td>\n<\/tr>\n<tr>\n<td>Groundworks and external works<\/td>\n<td>Which site-specific activities sit outside the factory scope?<\/td>\n<\/tr>\n<tr>\n<td>Transport and lifting<\/td>\n<td>What access, delivery and assembly assumptions support the price?<\/td>\n<\/tr>\n<tr>\n<td>Site completion<\/td>\n<td>Who completes connections, finishes, testing and commissioning?<\/td>\n<\/tr>\n<tr>\n<td>Risk and change<\/td>\n<td>Which allowances and assumptions remain provisional?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3>Payment timing affects the client<\/h3>\n<p>Two proposals with similar total prices may require payments at different stages. A procurement route involving significant manufacture before delivery can create a different cash-flow profile from work valued as it progresses on site.<\/p>\n<p>The client needs to understand what each payment relates to and which evidence supports it. Questions about ownership, protection of payments and consequences of supplier failure require the project\u2019s commercial and legal advisers. A generic cost comparison cannot establish those protections merely by listing them.<\/p>\n<p>This is a reason to examine the complete procurement arrangement early. It is also a reason to avoid presenting the lowest initial quote as a complete assessment of client exposure.<\/p>\n<h3>Test repetition and change assumptions<\/h3>\n<p>The economics of repeated production depend on what actually repeats and how consistently it can be delivered. A proposal may assume a settled design, a particular quantity or a predictable production sequence. The client should know which assumptions support the quoted price.<\/p>\n<p>Late changes can affect materials already ordered, work already completed and the sequence of remaining manufacture. PBC Today\u2019s <a href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-construction-management\/94327\/\" target=\"_blank\" rel=\"noopener\">modular management feature<\/a> discusses design approval and variations from a practitioner perspective. An independent tender review should test how those arrangements apply to the actual project.<\/p>\n<h3>Compare value at the same boundary<\/h3>\n<p>A shorter programme may reduce some costs, while earlier design or specialist coordination adds others. The cost plan should show these effects transparently rather than assume that a claimed time saving converts directly into a fixed financial saving.<\/p>\n<p>The same discipline supports <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/4d-5d-bim-project-controls-quantities-programme-cost-certainty\/167026\/\" target=\"_blank\" rel=\"noopener\">project cost and programme controls<\/a>: quantities, sequence and assumptions need to remain connected.<\/p>\n<p>A fair comparison leaves the client able to explain what is being purchased, what remains uncertain and when money is committed. Only then can the team judge whether the proposed construction method offers better value for the required building.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change.<\/p>\n","protected":false},"author":17,"featured_media":167659,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[942],"tags":[627],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":["post-167658","post","type-post","status-publish","format-standard","has-post-thumbnail","category-mmc-news","tag-modular-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comparing modular and traditional building costs | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comparing modular and traditional building costs\" \/>\n<meta property=\"og:description\" content=\"Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-13T12:41:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-2214692080-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Carpenter\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/\"},\"author\":{\"name\":\"Steph Carpenter\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/dd16f5e0e89ad310c0ff814f9325eb65\"},\"headline\":\"Comparing modular and traditional building costs\",\"datePublished\":\"2026-11-13T12:41:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/\"},\"wordCount\":670,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-2214692080-scaled.jpg\",\"keywords\":[\"Modular Construction\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/\",\"name\":\"Comparing modular and traditional building costs | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-2214692080-scaled.jpg\",\"datePublished\":\"2026-11-13T12:41:37+00:00\",\"description\":\"Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-2214692080-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-2214692080-scaled.jpg\",\"width\":2048,\"height\":1152,\"caption\":\"Image: iStock | \u00a9 MarioGuti\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/mmc-news\\\/comparing-modular-and-traditional-building-costs\\\/167658\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comparing modular and traditional building costs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PBCToday\\\/\",\"https:\\\/\\\/x.com\\\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/dd16f5e0e89ad310c0ff814f9325eb65\",\"name\":\"Steph Carpenter\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"caption\":\"Steph Carpenter\"},\"sameAs\":[\"http:\\\/\\\/www.pbctoday.co.uk\"],\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/author\\\/stephhazlegreaves\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comparing modular and traditional building costs | Planning, Building &amp; Construction Today","description":"Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/","og_locale":"en_US","og_type":"article","og_title":"Comparing modular and traditional building costs","og_description":"Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-11-13T12:41:37+00:00","og_image":[{"width":2048,"height":1152,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-2214692080-scaled.jpg","type":"image\/jpeg"}],"author":"Steph Carpenter","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/"},"author":{"name":"Steph Carpenter","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65"},"headline":"Comparing modular and traditional building costs","datePublished":"2026-11-13T12:41:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/"},"wordCount":670,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-2214692080-scaled.jpg","keywords":["Modular Construction"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/","name":"Comparing modular and traditional building costs | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-2214692080-scaled.jpg","datePublished":"2026-11-13T12:41:37+00:00","description":"Compare modular and traditional building costs on a common scope, including factory work, site completion, payment timing and design change","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-2214692080-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-2214692080-scaled.jpg","width":2048,"height":1152,"caption":"Image: iStock | \u00a9 MarioGuti"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/comparing-modular-and-traditional-building-costs\/167658\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Comparing modular and traditional building costs"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65","name":"Steph Carpenter","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","caption":"Steph Carpenter"},"sameAs":["http:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephhazlegreaves\/"}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=167658"}],"version-history":[{"count":2,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167658\/revisions"}],"predecessor-version":[{"id":167661,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167658\/revisions\/167661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/167659"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=167658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=167658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=167658"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=167658"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=167658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}