{"id":167936,"date":"2026-11-24T10:11:28","date_gmt":"2026-11-24T10:11:28","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=167936"},"modified":"2026-11-24T10:11:28","modified_gmt":"2026-11-24T10:11:28","slug":"digital-asset-records-existing-buildings","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/","title":{"rendered":"After digital handover: Keep the asset register true as the building changes"},"content":{"rendered":"<h2>An asset register starts losing value when replacements, relocations and maintenance decisions bypass it. Existing estates need a practical way to recover missing evidence and make each intervention improve the record<\/h2>\n<p>A facilities team opens an asset register to plan a replacement and finds three conflicting descriptions of the same ventilation unit. The maintenance system uses one identifier, the financial record another, and an old drawing shows equipment that has since been removed. Each record may have been reasonable when it was created. The problem is that subsequent changes have not travelled through all the systems that depend on them. The team must now spend time establishing the physical facts before it can make the intended decision.<\/p>\n<p>This is where digital construction meets the reality of an operating estate. Even a carefully prepared handover becomes less reliable if maintenance and refurbishment do not update it. Older buildings may never have had a consistent digital record. The practical objective is to establish enough trustworthy information for the decisions that matter, then prevent avoidable deterioration. That requires a continuing operational process, with a clear owner, rather than an isolated exercise to populate a database or recreate the whole building in three dimensions.<\/p>\n<h3>Start with the decisions the estate must make<\/h3>\n<p>The government&#8217;s <a href=\"https:\/\/www.gov.uk\/government\/publications\/facilities-management-standards-for-govs-004-property\/facilities-management-standard-002-asset-data\" target=\"_blank\" rel=\"noopener\">Facilities Management Standard 002 on asset data<\/a> sets an expectation for an asset register and knowledge of assets&#8217; condition and maintenance requirements within its government-property context. It provides a useful reference for other owners without becoming a universal legal requirement for every estate. The central operational question is what the owner needs to know to maintain services, control risk and plan expenditure across the buildings it manages.<\/p>\n<p>Translate that into specific decisions. A maintenance planner may need reliable locations, access arrangements and service history. A capital programme manager needs condition, consequence of failure and credible renewal information. An energy manager may need to relate equipment changes to metered performance. These uses overlap, but they do not require identical datasets. Agreeing the decisions first helps avoid a survey that collects easily available information while missing the attributes needed to authorise work or compare investment priorities. It also gives the data team a defensible basis for sequencing its effort.<\/p>\n<h3>Recover the legacy record without inventing certainty<\/h3>\n<p>Begin by bringing existing sources into view: drawings, maintenance contracts, inspection reports, equipment schedules, invoices and local knowledge. Record where each item came from and when it was last checked. Keep conflicting evidence visible until someone resolves it. Automatically selecting the newest file can be misleading if that document describes a proposal rather than completed work. Likewise, a maintenance invoice may demonstrate that a visit occurred without establishing the precise condition of every asset listed in the contract.<\/p>\n<p>A risk-based survey can then prioritise the gaps that obstruct important decisions. For a hypothetical school estate, inaccessible ventilation equipment with uncertain maintenance history might justify earlier verification than a low-consequence fixture with a reliable local record. The ranking should reflect actual building use, service dependence and competent risk assessment. Label unknown values as unknown and distinguish measured, observed, documented and inferred information. A complete-looking register assembled from assumptions can be more misleading than an incomplete one whose limitations are clearly understood.<\/p>\n<h3>Make identity survive replacement and relocation<\/h3>\n<p>A durable asset identity connects physical equipment to its records without depending entirely on a description such as &#8216;main air handler&#8217;. Descriptions change and may be reused. The register should distinguish a maintainable item, its system and its location, with rules for replacement and relocation. When equipment is removed, preserving its history is usually more useful than overwriting it with the replacement&#8217;s details. A clear relationship between old and new records helps explain changes in faults, energy use and maintenance expenditure.<\/p>\n<p>The <a href=\"https:\/\/www.gov.uk\/government\/publications\/government-property-data-standard\/government-property-data-standard-govs004-pds010-html\" target=\"_blank\" rel=\"noopener\">Government Property Data Standard<\/a> emphasises consistent information and mastering data at source within its scope. Applied as a management principle, that means deciding which system controls each attribute. The finance system may own accounting values while the maintenance system owns service status. Linking their identifiers can be more practical than forcing all functions into one application. The essential control is that a change has an agreed origin and can be reconciled across the systems that need it.<\/p>\n<h3>Use maintenance as a controlled information event<\/h3>\n<p>Every intervention creates an opportunity to improve the record. A technician who identifies an incorrect serial number, a relocated item or an undocumented component needs a simple correction route. The work order should capture the observation and supporting evidence, while a defined reviewer decides which controlled records require amendment. Closing the maintenance task and accepting the data update are related but different actions. If both are hidden in a single completion tick, errors can persist while the dashboard reports that the job is finished.<\/p>\n<p>For work equipment within its scope, <a href=\"https:\/\/www.hse.gov.uk\/work-equipment-machinery\/maintenance.htm\" target=\"_blank\" rel=\"noopener\">HSE&#8217;s maintenance guidance<\/a> explains that equipment must be maintained in a safe condition and that an existing machinery maintenance log must be kept up to date. It also stresses planning and communicating maintenance safely. Those requirements should not be stretched into a claim that one database satisfies every building duty. They do reinforce the importance of connecting usable instructions and maintenance history to the actual equipment, with competent people assessing what the work requires.<\/p>\n<h3>Treat refurbishment as a change to an operating system<\/h3>\n<p>A refurbishment can alter several operational relationships at once. A new partition may change room identifiers; a replacement controller may change an equipment interface; a service alteration may affect access or isolation arrangements. The project team should identify the affected records before work starts and agree on who verifies the completed changes. This includes small works and reactive replacements, which can escape the information controls applied to major capital projects. The financial size of the job is not a reliable measure of its informational consequences.<\/p>\n<p><a href=\"https:\/\/www.iso.org\/standard\/75109.html\" target=\"_blank\" rel=\"noopener\">ISO 19650-3<\/a> addresses information management during the operational phase of assets. Its published scope supports treating information exchanges as an ongoing activity throughout operation. An owner applying this approach can define events that require review: replacement, significant modification, change of use, a material inspection finding or a change of service provider. Each event should trigger the relevant information work at a proportionate level. The aim is to prevent repeated surveys from becoming the only way to discover changes that the organisation itself commissioned.<\/p>\n<h3>Connect information quality to maintenance and finance<\/h3>\n<p>Asset information becomes more useful when it explains expenditure. A repair cost attached only to a building gives limited insight into whether one piece of equipment is repeatedly failing. Linking work orders to a stable asset identity can support a more informed renewal discussion, provided the costs are recorded consistently. The decision still needs technical judgement: frequent interventions may reflect installation problems, changing use or an unsuitable maintenance approach rather than simple age. The record should help test those possibilities rather than produce an automatic replacement instruction.<\/p>\n<p>Finance teams should also understand the uncertainty behind estate forecasts. A renewal programme based on surveyed condition has a different evidential basis from one using assumed service lives. Showing the coverage and age of condition information helps decision-makers assess confidence. Where surveying would materially change a large investment decision, the cost of better evidence can be considered alongside the expenditure at stake. This creates a practical business case for improving data, while avoiding the assumption that every additional attribute will deliver equal value.<\/p>\n<h3>Check that the record remains usable<\/h3>\n<p>Periodic assurance should examine a sample from physical asset to record and from record back to physical asset. The two directions reveal different problems: unrecorded equipment on one side and obsolete or duplicated entries on the other. Select samples according to consequence and recent change, as well as random coverage. Ask whether staff can retrieve the relevant history, understand its status and identify unresolved gaps. Track recurring causes of failure, such as contractor naming conventions or delayed work-order updates, so that the process improves rather than merely correcting isolated entries.<\/p>\n<p>PBC Today&#8217;s <a href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-handover-write-information-brief-operator-can-use\/166254\/\" target=\"_blank\" rel=\"noopener\">article on writing a usable BIM handover brief<\/a> examined what an operator should receive. Existing estates face the continuing task of keeping that information aligned with reality. A successful register is one that maintenance teams trust enough to use, finance teams can interpret, and responsible managers can challenge. Its value is sustained through ordinary operational events, with every verified change making the next maintenance or investment decision easier to defend.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>How facilities teams can recover unreliable building records, prioritise legacy data gaps and keep asset information aligned with maintenance and renewal.<\/p>\n","protected":false},"author":37,"featured_media":167937,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[305,141293],"tags":[645,574,742],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":["post-167936","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bim-news","category-digital-construction-news","tag-bim-execution-plan","tag-data-management","tag-facilities-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Digital asset records: Keeping existing buildings up to date<\/title>\n<meta name=\"description\" content=\"How facilities teams can recover unreliable building records, prioritise data gaps and keep asset information aligned with maintenance\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"After digital handover: Keep the asset register true as the building changes\" \/>\n<meta property=\"og:description\" content=\"How facilities teams can recover unreliable building records, prioritise data gaps and keep asset information aligned with maintenance\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-24T10:11:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1809649170-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Megan Traviss\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/\"},\"author\":{\"name\":\"Megan Traviss\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/eadde57b3ac1487082d7c73f80e7f980\"},\"headline\":\"After digital handover: Keep the asset register true as the building changes\",\"datePublished\":\"2026-11-24T10:11:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/\"},\"wordCount\":1407,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1809649170-scaled.jpg\",\"keywords\":[\"BIM Execution Plan\",\"Data Management\",\"Facilities Management\"],\"articleSection\":[\"BIM News\",\"Digital Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/\",\"name\":\"Digital asset records: Keeping existing buildings up to date\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1809649170-scaled.jpg\",\"datePublished\":\"2026-11-24T10:11:28+00:00\",\"description\":\"How facilities teams can recover unreliable building records, prioritise data gaps and keep asset information aligned with maintenance\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1809649170-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1809649170-scaled.jpg\",\"width\":2048,\"height\":1152,\"caption\":\"Image: iStock | \u00a9 gorodenkoff\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/digital-construction-news\\\/digital-asset-records-existing-buildings\\\/167936\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"After digital handover: Keep the asset register true as the building changes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PBCToday\\\/\",\"https:\\\/\\\/x.com\\\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/eadde57b3ac1487082d7c73f80e7f980\",\"name\":\"Megan Traviss\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g\",\"caption\":\"Megan Traviss\"},\"sameAs\":[\"http:\\\/\\\/www.pbctoday.co.uk\\\/\"],\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/author\\\/megantraviss\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Digital asset records: Keeping existing buildings up to date","description":"How facilities teams can recover unreliable building records, prioritise data gaps and keep asset information aligned with maintenance","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/","og_locale":"en_US","og_type":"article","og_title":"After digital handover: Keep the asset register true as the building changes","og_description":"How facilities teams can recover unreliable building records, prioritise data gaps and keep asset information aligned with maintenance","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-11-24T10:11:28+00:00","og_image":[{"width":2048,"height":1152,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1809649170-scaled.jpg","type":"image\/jpeg"}],"author":"Megan Traviss","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/"},"author":{"name":"Megan Traviss","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980"},"headline":"After digital handover: Keep the asset register true as the building changes","datePublished":"2026-11-24T10:11:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/"},"wordCount":1407,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1809649170-scaled.jpg","keywords":["BIM Execution Plan","Data Management","Facilities Management"],"articleSection":["BIM News","Digital Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/","name":"Digital asset records: Keeping existing buildings up to date","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1809649170-scaled.jpg","datePublished":"2026-11-24T10:11:28+00:00","description":"How facilities teams can recover unreliable building records, prioritise data gaps and keep asset information aligned with maintenance","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1809649170-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1809649170-scaled.jpg","width":2048,"height":1152,"caption":"Image: iStock | \u00a9 gorodenkoff"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/digital-asset-records-existing-buildings\/167936\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"After digital handover: Keep the asset register true as the building changes"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/eadde57b3ac1487082d7c73f80e7f980","name":"Megan Traviss","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/15ca848d3573aa65fc384124cafbeb3850703250d3837657c4d09a58fbae14f6?s=96&d=mm&r=g","caption":"Megan Traviss"},"sameAs":["http:\/\/www.pbctoday.co.uk\/"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/megantraviss\/"}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=167936"}],"version-history":[{"count":3,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167936\/revisions"}],"predecessor-version":[{"id":167940,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167936\/revisions\/167940"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/167937"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=167936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=167936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=167936"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=167936"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=167936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}