{"id":167941,"date":"2026-11-24T10:43:43","date_gmt":"2026-11-24T10:43:43","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=167941"},"modified":"2026-11-24T10:43:43","modified_gmt":"2026-11-24T10:43:43","slug":"verifying-damp-and-mould-remediation-through-commissioning-and-follow-up","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/","title":{"rendered":"Verifying damp and mould remediation through commissioning and follow up"},"content":{"rendered":"<h2 data-pm-slice=\"1 1 []\">Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections<\/h2>\n<p class=\"standfirst\">Completion records should establish whether remedial works have addressed the diagnosed defect. Defined acceptance criteria, commissioning evidence and proportionate follow-up give housing asset teams a stronger basis for technical sign-off.<\/p>\n<p>A completed repair order demonstrates that an instructed activity has been recorded as delivered. Technical sign-off requires evidence that the intervention has met its specified purpose, with any unresolved risks or follow-up requirements still visible to the asset team.<\/p>\n<p>For damp and mould programmes, this distinction affects contract management as well as building performance. If the acceptance criteria are unspecified, a contractor and client may assess completion against different expectations. Subsequent recurrence then becomes difficult to interpret: the diagnosis, installation or original scope may each require review.<\/p>\n<p>Verification should therefore be designed into the work package. The diagnosis establishes the intended outcome; the specification defines the intervention; the completion record documents what was installed, corrected and tested. Post-works assessment then examines whether the expected improvement is sustained in use.<\/p>\n<h3>Set acceptance criteria before procurement<\/h3>\n<p>The criteria should relate to the identified mechanism. A confirmed ingress defect requires evidence that the relevant detail has been repaired and that associated moisture recovery is being assessed appropriately. A ventilation intervention requires evidence of installed performance against the specified design basis.<\/p>\n<p>These are different verification tasks. Neither is adequately described by a generic instruction to provide photographs after completion. Images may document workmanship and previously concealed details, but the contract should identify where measurements, inspection or specialist judgement are also required.<\/p>\n<p>An illustrative ventilation work package might require the contractor to record the system and components installed, relevant settings and measured airflow at designated points in the required operating modes. The acceptance schedule would define the project\u2019s performance criteria, responsibility for testing and the route for resolving a failed result. It should not import a single airflow threshold across different system types.<\/p>\n<p><a href=\"https:\/\/assets.publishing.service.gov.uk\/media\/61deba42d3bf7f054fcc243d\/ADF1.pdf\" target=\"_blank\" rel=\"noopener\">Approved Document F\u2019s 2021<\/a> dwelling guidance provides example commissioning documentation and distinguishes inspection from airflow measurement. The client should establish which requirements apply to the work and use the relevant records to support the handover.<\/p>\n<h3>Preserve evidence through handover<\/h3>\n<p>An asset manager should be able to connect a completion certificate to the original diagnosis and final scope. Where the contractor has varied the proposed work, the record should identify the change, its technical basis and the person who accepted it. An unexplained substitution can undermine later assessment even when the installation itself appears satisfactory.<\/p>\n<p>Responsibility is particularly important where fabric repairs, ventilation works and reinstatement are procured separately. The programme needs an owner for the overall outcome, alongside responsibility for each package. A completed electrical instruction should not automatically close an outstanding building-fabric investigation.<\/p>\n<p><a href=\"https:\/\/www.housing-ombudsman.org.uk\/reports\/spotlight-reports\/spotlight-on-knowledge-and-information-management\/\" target=\"_blank\" rel=\"noopener\">The Housing Ombudsman\u2019s report<\/a> on knowledge and information management identifies the risks of weak arrangements for creating, using and sharing information. For remedial programmes, the implication is practical: survey findings and commissioning results must be retrievable against the asset and available to those reviewing a repeat defect.<\/p>\n<h3>Check performance in use<\/h3>\n<p><a href=\"https:\/\/www.gov.uk\/government\/publications\/damp-and-mould-understanding-and-addressing-the-health-risks-for-rented-housing-providers\/understanding-and-addressing-the-health-risks-of-damp-and-mould-in-the-home--2\" target=\"_blank\" rel=\"noopener\">Government damp and mould guidance<\/a> recommends a further inspection at least six weeks after remedial work to check for recurrence. That follow-up sits alongside immediate protective action and any additional checks justified by the risk; it is not a waiting period for responding to further reports.<\/p>\n<p>The assessment should be related to the original failure mechanism. Where the concern involved environmental conditions, post-works monitoring should record sensor locations and relevant operating circumstances. Comparisons need to account for weather and heating conditions. A lower relative<a href=\"https:\/\/www.npl.co.uk\/resources\/q-a\/dew-point-and-relative-humidity\" target=\"_blank\" rel=\"noopener\"> humidity reading<\/a> on one visit does not, by itself, demonstrate reduced moisture load, because relative humidity changes with temperature.<\/p>\n<p>For a repaired ingress defect, the review should consider the repaired detail and the condition of affected materials, with any limitations on interpreting progress recorded. Where suitable weather exposure has not occurred, the evidence available may not yet test the original pathway. The response is to define the necessary verification, while continuing to manage the case according to its risk.<\/p>\n<p>Resident reports provide operational evidence about recurrence, control use and disruption. They should be considered alongside inspection and performance data, rather than used as the sole basis for technical acceptance or displaced by a favourable sensor reading.<\/p>\n<h3>Feed the result into asset assurance<\/h3>\n<p><a href=\"https:\/\/www.gov.uk\/government\/publications\/safety-and-quality-standard\" target=\"_blank\" rel=\"noopener\">The Regulator of Social Housing\u2019s Safety and Quality Standard<\/a> requires registered providers in England to keep accurate, current condition records for individual homes and use those records to inform repairs and improvements. Verified remedial findings should therefore update the property\u2019s technical history, including outstanding uncertainty and future maintenance requirements.<\/p>\n<p>Portfolio reporting can then distinguish first-time completion from recurrence and technical rework. Useful management measures include the proportion of works with complete verification records, repeat reports within a defined review period and the time taken to resolve outstanding recommendations. These are proposed assurance measures, not statutory performance indicators.<\/p>\n<p><a href=\"https:\/\/www.gov.uk\/government\/publications\/awaabs-law-phase-2-guidance-for-social-housing-landlords\/awaabs-law-phase-2-guidance-for-social-landlords\" target=\"_blank\" rel=\"noopener\">The government\u2019s published Awaab\u2019s Law Phase 2 guidance<\/a> is written to apply from 30 November 2026 to social housing in England. As providers review their response arrangements, they need to maintain a clear distinction between meeting response requirements and demonstrating the performance of completed remedial works.<\/p>\n<p>A defensible sign-off records what was verified, under which conditions and what remains to be checked. It gives the client a basis for accepting the work and makes any subsequent recurrence an evidence-led technical review, rather than another repair order detached from the previous decision.<\/p>\n<p class=\"cta\"><strong><em><a href=\"https:\/\/www.pbctoday.co.uk\/events\/event-details\/pbctw06\/\" target=\"_blank\" rel=\"noopener\">PBC Today\u2019s Introducing Healthy Homes webinar<\/a> takes place on 15 December 2026, 2\u20133pm GMT. David Bly of Cornerstone Management Services Ltd will discuss the connection between knowledge, diagnosis, resolution and ongoing management.<\/em><\/strong><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections.<\/p>\n","protected":false},"author":17,"featured_media":167943,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[306],"tags":[173173,172910],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":["post-167941","post","type-post","status-publish","format-standard","has-post-thumbnail","category-building-control-news","tag-awaabs-law","tag-damp-and-mould"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Verifying damp and mould remediation through commissioning and follow up | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Verifying damp and mould remediation through commissioning and follow up\" \/>\n<meta property=\"og:description\" content=\"Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-24T10:43:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1385683278-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1365\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Carpenter\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/\"},\"author\":{\"name\":\"Steph Carpenter\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/dd16f5e0e89ad310c0ff814f9325eb65\"},\"headline\":\"Verifying damp and mould remediation through commissioning and follow up\",\"datePublished\":\"2026-11-24T10:43:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/\"},\"wordCount\":951,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1385683278-scaled.jpg\",\"keywords\":[\"Awaab's Law\",\"Damp and Mould\"],\"articleSection\":[\"Building Control News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/\",\"name\":\"Verifying damp and mould remediation through commissioning and follow up | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1385683278-scaled.jpg\",\"datePublished\":\"2026-11-24T10:43:43+00:00\",\"description\":\"Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1385683278-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/iStock-1385683278-scaled.jpg\",\"width\":2048,\"height\":1365,\"caption\":\"Image: iStock | \u00a9 Epiximages\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/building-control-news\\\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\\\/167941\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Verifying damp and mould remediation through commissioning and follow up\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PBCToday\\\/\",\"https:\\\/\\\/x.com\\\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/#\\\/schema\\\/person\\\/dd16f5e0e89ad310c0ff814f9325eb65\",\"name\":\"Steph Carpenter\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g\",\"caption\":\"Steph Carpenter\"},\"sameAs\":[\"http:\\\/\\\/www.pbctoday.co.uk\"],\"url\":\"https:\\\/\\\/www.pbctoday.co.uk\\\/news\\\/author\\\/stephhazlegreaves\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Verifying damp and mould remediation through commissioning and follow up | Planning, Building &amp; Construction Today","description":"Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/","og_locale":"en_US","og_type":"article","og_title":"Verifying damp and mould remediation through commissioning and follow up","og_description":"Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections","og_url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2026-11-24T10:43:43+00:00","og_image":[{"width":2048,"height":1365,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1385683278-scaled.jpg","type":"image\/jpeg"}],"author":"Steph Carpenter","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/"},"author":{"name":"Steph Carpenter","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65"},"headline":"Verifying damp and mould remediation through commissioning and follow up","datePublished":"2026-11-24T10:43:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/"},"wordCount":951,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1385683278-scaled.jpg","keywords":["Awaab's Law","Damp and Mould"],"articleSection":["Building Control News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/","url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/","name":"Verifying damp and mould remediation through commissioning and follow up | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1385683278-scaled.jpg","datePublished":"2026-11-24T10:43:43+00:00","description":"Discover how housing asset teams can verify damp and mould remedial works through acceptance criteria, commissioning evidence and follow-up inspections","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1385683278-scaled.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2026\/11\/iStock-1385683278-scaled.jpg","width":2048,"height":1365,"caption":"Image: iStock | \u00a9 Epiximages"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/verifying-damp-and-mould-remediation-through-commissioning-and-follow-up\/167941\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Verifying damp and mould remediation through commissioning and follow up"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/dd16f5e0e89ad310c0ff814f9325eb65","name":"Steph Carpenter","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/97a073c56b415b32c4d1d8ee9ef9a0ce42224c6532ccc712f228b71f15b4e650?s=96&d=mm&r=g","caption":"Steph Carpenter"},"sameAs":["http:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephhazlegreaves\/"}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=167941"}],"version-history":[{"count":2,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167941\/revisions"}],"predecessor-version":[{"id":167945,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/167941\/revisions\/167945"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media\/167943"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=167941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=167941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=167941"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=167941"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=167941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}