{"id":19433,"date":"2015-08-04T14:30:20","date_gmt":"2015-08-04T14:30:20","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=19433"},"modified":"2015-08-04T14:30:20","modified_gmt":"2015-08-04T14:30:20","slug":"bim-coastal-defences-operational-maintenance-data-2","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/","title":{"rendered":"BIM for Coastal Defences: Operational and maintenance data"},"content":{"rendered":"<h2><span>This is the third in a series of interviews with Carl Green, Head of Engineering Services for Wyre Council as we follow the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme\u2026<\/span><\/h2>\n<p>The Fylde Peninsula Coastal Programme (FPCP) is a partnership between Wyre Council, Blackpool Council, Fylde Council and the Environment Agency. It is responsible for managing the Fylde Peninsula\u2019s coastline and reducing risk of flooding to people and the developed, historic and natural environment. The new defences will protect 12,000 properties in total \u2013 7500 in Rossall and 4500 in Anchorsholme plus critical drainage and transport infrastructure<\/p>\n<p>Construction work at Rossall, which is part of the scheme, has been progressing at a significant pace. There is now 500 meters of rock and material which has been placed on the seaward side of the sheet piles. To give this some context, the total weight of the material placed on the beach over this relatively short distance is well over 165,000 tonnes. Carl Green explains the challenges that have arisen to date and how they have been overcome.<\/p>\n<p>\u201cIt seems obvious, but one of the key challenges of maintaining the coastal defences is ensuring that they don\u2019t get washed away. Coastal defences, like any asset that comes into contact with water, has to have a drainage solution to allow water to run away. Part of our solution includes specially designed holes and a drainage system that allows water to drain through the sheet piles, whilst retaining the fill behind.<\/p>\n<p>\u201cWe were concerned that we would lose a significant amount of fill through these drain holes and suggested a composite geotextile drainage system to be placed in front of the holes. This acts as a filter holding back the solids whilst allowing the water to escape. From a risk management and maintenance point of view, it is vital that we know where these drain holes are, as we will only know that the drainage system has failed when the fill level starts to drop and cracks appear in the defence.\u201d<\/p>\n<p>In order to accurately record this information, they used the Sitedesk ( www.sitedeskconstruct.com ) inbuilt form creator to create a site diary. The form creator allows custom fields to be created as well as photos, videos, PDFs or any content to be embedded into the form itself.<\/p>\n<p>The site diary allows the council officers to record any information that is needed to manage the coastal defences. Green explained;<\/p>\n<p>\u201cIn this case, we recorded exactly where the drainage holes are, took pictures to ensure that the composite geotextile solution was installed correctly, and noted down material reference numbers and locations. This information was related to the BIM model in the correct location which makes it far simpler to get exactly the information that we might need straightaway. The process is entirely automated which meant that there was no extra work for the team.<\/p>\n<p>\u201cA major challenge is constructing the defences in line with the design and then checking the defences to make sure that they are still functioning as designed over time. The rocks are placed in a specific pattern with certain sized spaces between them. These spaces allow the sea\u2019s wave energy to be dissipated without causing any damage, each time a wave hits them.<\/p>\n<p>\u201cIt would be far too slow and dangerous for a person to measure every single void and even more risky and onerous to try and record manual measurements for every rock placement. We solved this by using a GPS machine control solution which is mounted to the machinery placing the rock armour. The machine control solution accurately records the actual GPS position of each placed rock. The GPS output is attached to the Sitedesk site diary which provides a real time \u2018as built record\u2019 of how the defences are being constructed. This data is then automatically attached to the correct grid and the BIM model.<\/p>\n<p>\u201cTo gain a picture of how the defences look when they are first completed, we are using a Quadcopter to record HD video of each section. In a similar way to the GPS rock placement, the video is being added to the Sitedesk site diary which gives us a complete \u2018as built\u2019 picture as well as any notes or comments that we have made during the construction process. This minimises risk to the defences, lives and property, as well as the public purse<\/p>\n<p>\u201cWe have created inspection forms in Sitedesk that allow us to capture all of the operational and maintenance data that we need. Once the maintenance processes commence we will fly the drone over the defences and record the condition of the assets over time. This gives us the facility to see how the defences are performing, as well as identify any problems by comparing the data sets and by viewing and comparing the videos. Sitedesk is helping minimise time, costs and risks to the project by delivering three things in one solution. A risk management tool that helps us measure, validate and mitigate risks as the project progresses, a digital asset management solution to manage the asset which we are constructing as the project progresses and a maintenance and inspection tool that we can use to manage anything that is in, on or related to the project.\u201d<\/p>\n<p><b>Lessons learned so far<\/b><\/p>\n<p>For Green, the biggest lessons learned so far are:<\/p>\n<ul>\n<li>To identify areas of risk early, and specifically capture data which allows rapid identification and management of the issue;<\/li>\n<li>Test the risk management process with trial scenarios so you know that the data sets and processes that you have identified will work when you need them;<\/li>\n<li>Validate data as you go along. It\u2019s too big a job to do at the end of the process. It will probably be too late to address any construction issues unless you identify them as you go along;<\/li>\n<li>Embrace technology but ensure that there is a solid business case driving the adoption otherwise you will get data for data\u2019s sake;<\/li>\n<li>Build your O&amp;M solution as you go along. It\u2019s cheaper;<\/li>\n<li>Choose technology that is easy to use. If it isn\u2019t people won\u2019t use it. <span style=\"font-family: Arial, serif;\"><br \/>\n<\/span><\/li>\n<\/ul>\n<p><strong>Carl Green<\/strong><\/p>\n<p>Head of Engineering Services<\/p>\n<p>Wyre Council<\/p>\n<p>Carl.Green@wyre.gov.uk<\/p>\n<p><a href=\"http:\/\/www.wyre.gov.uk\" target=\"_blank\"><span>www.wyre.gov.uk<\/span><\/a><\/p>\n<p><a href=\"http:\/\/www.twitter.com\/wyrecouncil\" target=\"_blank\"><span>www.twitter.com\/wyrecouncil<\/span><\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>This is the third in a series of interviews with Carl Green, Head of Engineering Services for Wyre Council as we follow the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme\u2026 The Fylde Peninsula Coastal Programme (FPCP) is a partnership between Wyre Council, Blackpool Council, Fylde Council and the Environment Agency. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-19433","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>BIM for Coastal Defences: Operational and maintenance data | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"Carl Green, Head of Engineering Services for Wyre Council on the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM for Coastal Defences: Operational and maintenance data\" \/>\n<meta property=\"og:description\" content=\"Carl Green, Head of Engineering Services for Wyre Council on the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2015-08-04T14:30:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2015\/08\/IMG_3459-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lisa Carnwell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\"},\"author\":{\"name\":\"Lisa Carnwell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38\"},\"headline\":\"BIM for Coastal Defences: Operational and maintenance data\",\"datePublished\":\"2015-08-04T14:30:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\"},\"wordCount\":1057,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#respond\"]}],\"copyrightYear\":\"2015\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\",\"name\":\"BIM for Coastal Defences: Operational and maintenance data | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2015-08-04T14:30:20+00:00\",\"description\":\"Carl Green, Head of Engineering Services for Wyre Council on the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM for Coastal Defences: Operational and maintenance data\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38\",\"name\":\"Lisa Carnwell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g\",\"caption\":\"Lisa Carnwell\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/lisa-carnwell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"BIM for Coastal Defences: Operational and maintenance data | Planning, Building &amp; Construction Today","description":"Carl Green, Head of Engineering Services for Wyre Council on the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/","og_locale":"en_US","og_type":"article","og_title":"BIM for Coastal Defences: Operational and maintenance data","og_description":"Carl Green, Head of Engineering Services for Wyre Council on the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2015-08-04T14:30:20+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2015\/08\/IMG_3459-1.jpg","type":"image\/jpeg"}],"author":"Lisa Carnwell","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/"},"author":{"name":"Lisa Carnwell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38"},"headline":"BIM for Coastal Defences: Operational and maintenance data","datePublished":"2015-08-04T14:30:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/"},"wordCount":1057,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#respond"]}],"copyrightYear":"2015","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/","name":"BIM for Coastal Defences: Operational and maintenance data | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2015-08-04T14:30:20+00:00","description":"Carl Green, Head of Engineering Services for Wyre Council on the progress throughout the construction and operation of the Fylde Peninsula Coastal Programme","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-coastal-defences-operational-maintenance-data-2\/19433\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"BIM for Coastal Defences: Operational and maintenance data"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38","name":"Lisa Carnwell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g","caption":"Lisa Carnwell"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/lisa-carnwell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-23 09:31:50","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/19433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=19433"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/19433\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=19433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=19433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=19433"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=19433"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=19433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}