{"id":23717,"date":"2016-04-26T11:11:22","date_gmt":"2016-04-26T11:11:22","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=23717"},"modified":"2016-04-26T11:11:53","modified_gmt":"2016-04-26T11:11:53","slug":"offsite-prefabrication-manufacture","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/","title":{"rendered":"Offsite prefabrication and manufacture"},"content":{"rendered":"<h2><span>Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play in construction&#8230;<\/span><\/h2>\n<p>The Cad Room have been involved with prefabricated modules and plant equipment for the last five years.\u00a0 This is fast becoming the standard installation method on all construction sites where the design of the building allows for modules to be installed. The benefits include:<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0 Reduced installation time on site;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0 Improved health and safety by reducing work at height;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0 Reduced waste material.<\/p>\n<p>An engineered decision from reviewing the design and architectural structure will determine whether prefabricated modules for corridors, risers and plantrooms will work on the project.\u00a0 Once that the decision is made you have already saved time and money.\u00a0 Coordination still plays the major part in any off-site project, the same process and coordination philosophies still need to be adhered to to allow successful modularisation.<\/p>\n<p>Plantrooms are the heart of a functioning building; it is where all the major plant is housed and where the most time is spent to maintain and repair the equipment and plant to keep the building in use.\u00a0 We have produced many coordinated plantrooms and as such, this has led to prefabricated skids being manufactured offsite from our detailed dimensioned drawings.\u00a0 Making use of the correct size and supplier of equipment is essential to achieve an accurately installed plantroom.<\/p>\n<p>Risers are generally the easiest part of the building to coordinate and although not all risers can be prefabricated due to structural or architectural design, there are projects which require risers to be fully modularised.\u00a0 Risers need to be accessed more than most as it is the main isolation point for each specific floor that needs distribution of services.\u00a0 Fabricated risers make it easy to maintain and isolate if there is ever a problem.<\/p>\n<p>Corridors are the primary routes for distributing services to all parts of the building as they are the first area to be considered for modules. Maintenance and access is very important when configuring a module as corridors are the most congested and require the most coordination.\u00a0 The traditional install, albeit effective, has the risk of being changed on site, but with prefabricated modules, this removes the risk of change as the services are already fixed in place on a framed structure.\u00a0 As the items are manufactured off-site, the level of detail increases to make sure all materials are drawn to real life sizes.<\/p>\n<p>Modules come in three lengths, sized to which work with the ceiling arrangement.\u00a0 These lengths range from 6m to 2.4m made up of 1.2m sections.\u00a0 Generally, the module frames are made from slotted unistrut which comes in different sizes 41&#215;41, 21&#215;21 or 62&#215;41, depending on the weight of the services to be installed on the frame will determine the size of unistrut to be used.\u00a0 The installation of modules act like a puzzle &#8212; once you have a setting out point from the structure and making sure that the modules are labelled correctly &#8212; they should all seamlessly fit into place which reduces man-hours and also improves health and safety by minimising the amount of time one would have to work at height.<\/p>\n<p>As we are now in the world of BIM, this process plays an important part into the efficiency of prefabrication and modules.\u00a0 We have completed numerous prefabricated projects for all sectors.\u00a0 Our experience in modules is advanced more than most, and we have completed over 1000 detailed manufactured drawings for offsite production to strict deadlines to meet site programme and deliverables.\u00a0 We have created project specific templates to help with spool drawings which are required for fabricators to make the exact piece need for it to fit accurately &#8212; precision is key when creating spool drawings.<\/p>\n<p>The Cad Room Ltd are specialists in coordinating and modularising services for prefabrication offsite.<\/p>\n<p>If you have a project in mind, and would like to discuss the possibility of modules, we are more than happy to help.<\/p>\n<p><i>\u00a0<\/i><\/p>\n<p><i><\/i><strong>Grant Hood \u00a0<\/strong><\/p>\n<p>The Cad Room<\/p>\n<p>01614270348<\/p>\n<p>grant.hood@thecadroom.com<\/p>\n<p><a href=\"http:\/\/www.thecadroom.com\" target=\"_blank\"><span>www.thecadroom.com<\/span><\/a><\/p>\n<p><a href=\"https:\/\/twitter.com\/TheCadRoom\" target=\"_blank\"><span>www.twitter.com\/TheCadRoom<\/span><\/a><\/p>\n<p><i>Please note: this is a commercial profile<\/i><\/p>\n<p><i>Image details:\u00a0<\/i><\/p>\n<p><i><\/i><strong>Project:\u00a0<\/strong>Carr Gate \u2013 Firing Range Building, West Yorkshire police station;\u00a0<strong>Client:\u00a0<\/strong>Interserve<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play in construction&#8230; The Cad Room have been involved with prefabricated modules and plant equipment for the last five years.\u00a0 This is fast becoming the standard installation method on all construction sites where the design of the building allows [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-23717","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Offsite prefabrication and manufacture  | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play on construction sites...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Offsite prefabrication and manufacture\" \/>\n<meta property=\"og:description\" content=\"Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play on construction sites...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2016-04-26T11:11:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-04-26T11:11:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2016\/04\/Carr-Gate-FR-e1421334038106.png\" \/>\n\t<meta property=\"og:image:width\" content=\"992\" \/>\n\t<meta property=\"og:image:height\" content=\"627\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Lisa Carnwell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\"},\"author\":{\"name\":\"Lisa Carnwell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38\"},\"headline\":\"Offsite prefabrication and manufacture\",\"datePublished\":\"2016-04-26T11:11:22+00:00\",\"dateModified\":\"2016-04-26T11:11:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\"},\"wordCount\":699,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#respond\"]}],\"copyrightYear\":\"2016\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\",\"name\":\"Offsite prefabrication and manufacture | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2016-04-26T11:11:22+00:00\",\"dateModified\":\"2016-04-26T11:11:53+00:00\",\"description\":\"Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play on construction sites...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Offsite prefabrication and manufacture\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38\",\"name\":\"Lisa Carnwell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g\",\"caption\":\"Lisa Carnwell\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/lisa-carnwell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Offsite prefabrication and manufacture  | Planning, Building &amp; Construction Today","description":"Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play on construction sites...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/","og_locale":"en_US","og_type":"article","og_title":"Offsite prefabrication and manufacture","og_description":"Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play on construction sites...","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2016-04-26T11:11:22+00:00","article_modified_time":"2016-04-26T11:11:53+00:00","og_image":[{"width":992,"height":627,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2016\/04\/Carr-Gate-FR-e1421334038106.png","type":"image\/png"}],"author":"Lisa Carnwell","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/"},"author":{"name":"Lisa Carnwell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38"},"headline":"Offsite prefabrication and manufacture","datePublished":"2016-04-26T11:11:22+00:00","dateModified":"2016-04-26T11:11:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/"},"wordCount":699,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#respond"]}],"copyrightYear":"2016","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/","name":"Offsite prefabrication and manufacture | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2016-04-26T11:11:22+00:00","dateModified":"2016-04-26T11:11:53+00:00","description":"Prefabricated models offer numerous benefits. Grant Hood, of The Cad Room explains the role they can play on construction sites...","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/offsite-prefabrication-manufacture\/23717\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Offsite prefabrication and manufacture"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38","name":"Lisa Carnwell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g","caption":"Lisa Carnwell"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/lisa-carnwell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-14 00:44:15","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/23717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=23717"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/23717\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=23717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=23717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=23717"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=23717"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=23717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}