{"id":24426,"date":"2016-06-06T12:34:02","date_gmt":"2016-06-06T12:34:02","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=24426"},"modified":"2022-06-21T15:48:53","modified_gmt":"2022-06-21T14:48:53","slug":"legally-removing-hazardous-waste-construction-sites","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/","title":{"rendered":"Legally removing hazardous waste from construction sites"},"content":{"rendered":"<h2>When removing hazardous waste from a construction site, or premises a hazardous waste consignment note must be prepared. On 1st April 2016 in England, the Consignment Note and the way it is completed changed. This is to accommodate the removal of the need to register premises where hazardous waste is produced, hence the premises code.<\/h2>\n<h3>Legal requirement<b> <\/b><\/h3>\n<p>In England and Wales <i>The Hazardous Waste Regulations 2005<\/i> as amended in 2009 require all hazardous waste transfers to be accompanied by a Consignment Note even when being carried in connection with a mobile service. In Scotland the <i>Special Waste Regulations<\/i> still apply, and additional regulations were bought in &#8212; <i>The Special Waste Amendment (Scotland) Regulations 2004<\/i> &#8212; to bring them into line with the European requirements. Much of the information relating to England and Wales will also apply in Scotland however, there is no registration as a special waste producer. If the waste is being moved within Scotland or from England or Wales to Scotland or Northern Ireland an additional copy of the Consignment Note must be prepared and sent to SEPA for pre-notification at least 72 hours before the waste is moved.<\/p>\n<h3>Completing the Consignment Note<b> <\/b><\/h3>\n<p>The Consignment Note is divided into 5 sections, numbered A to E, with each section being completed in a defined sequence by the different parties to the waste transfer process.\u00a0 The requirements in Scotland differ from those in England and Wales.<\/p>\n<h3>England and Wales<\/h3>\n<p>The Consignment Note should provide for at least 3 copies to be made, 1 each for the producer\/holder\/consignor, the carrier and the consignee. Template Consignment Notes are produced by the EA and NRW and can be downloaded from their websites.<\/p>\n<p><a href=\"http:\/\/www.gov.uk\/government\/publications\/hazardous-waste-consignment-note\">www.gov.uk\/government\/publications\/hazardous-waste-consignment-note<\/a><\/p>\n<p><a href=\"https:\/\/naturalresources.wales\/media\/677710\/consignmentnote.pdf\">https:\/\/naturalresources.wales\/media\/677710\/consignmentnote.pdf<\/a><\/p>\n<p>Other suppliers can also provide them and in complying with the requirements of the Regulations the general layout and wording will be very similar. If more than two types of hazardous waste are to be removed and described a Consignment Note continuation sheet (also available from the EA website) will be needed, again with 3 copies.<\/p>\n<h3>Scotland<\/h3>\n<p>The \u2018Special Waste Consignment Note\u2019 (SWCN) can be <a href=\"https:\/\/webpayments.sepa.org.uk\/\">purchased online<\/a> from SEPA (insert hyperlink into SEPA (https:\/\/webpayments.sepa.org.uk\/\u00a0 )and consists of five different coloured (self-carbonising) pages, 1 each for the producer\/holder\/consignor, the carrier and the consignee and with a pre-notification copy and a final deposit copy being sent to SEPA. All Consignment Notes must bear a unique code, purchased from SEPA (unless for the second or subsequent removal of waste within a succession of extended carrier\u2019s collection rounds or for the return to the original manufacturer of out of specification materials, \u2013 both of which are free). The code consists of two letters and a series of numbers.<\/p>\n<p>For more information on removing hazardous waste and completing Consignment Notes, consult the CIP Construction Environmental Manual at <a href=\"http:\/\/www.cip-greenbook.com\">www.cip-greenbook.com<\/a> or call 0870 078 7700 for more information on the Manual and how it can help your business meet its environmental responsibilities.<\/p>\n<p><strong>Sarah Kenny<\/strong><br \/>\nSales and Marketing Manager<br \/>\nConstruction Industry Publications Limited<br \/>\n0870 078 4400<br \/>\n<a href=\"mailto:skenny@cip-books.com\">skenny@cip-books.com<\/a><br \/>\n<a href=\"http:\/\/www.cip-books.com\">www.cip-books.com<\/a><br \/>\n<b><i>Please note: this is a commercial profile<\/i><\/b><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>When removing hazardous waste from a construction site, or premises a hazardous waste consignment note must be prepared. On 1st April 2016 in England, the Consignment Note and the way it is completed changed. This is to accommodate the removal of the need to register premises where hazardous waste is produced, hence the premises code. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[309],"tags":[],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-24426","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-health-safety-news"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Legally removing hazardous waste from construction sites | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"When removing hazardous waste from a construction site or premises, a hazardous waste consignment note must be prepared. The changes are detailed here\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Legally removing hazardous waste from construction sites\" \/>\n<meta property=\"og:description\" content=\"When removing hazardous waste from a construction site or premises, a hazardous waste consignment note must be prepared. The changes are detailed here\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2016-06-06T12:34:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-21T14:48:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2016\/06\/CIP-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"803\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lisa Carnwell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\"},\"author\":{\"name\":\"Lisa Carnwell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38\"},\"headline\":\"Legally removing hazardous waste from construction sites\",\"datePublished\":\"2016-06-06T12:34:02+00:00\",\"dateModified\":\"2022-06-21T14:48:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\"},\"wordCount\":523,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"articleSection\":[\"Health &amp; Safety News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#respond\"]}],\"copyrightYear\":\"2016\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\",\"name\":\"Legally removing hazardous waste from construction sites | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2016-06-06T12:34:02+00:00\",\"dateModified\":\"2022-06-21T14:48:53+00:00\",\"description\":\"When removing hazardous waste from a construction site or premises, a hazardous waste consignment note must be prepared. The changes are detailed here\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Legally removing hazardous waste from construction sites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38\",\"name\":\"Lisa Carnwell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g\",\"caption\":\"Lisa Carnwell\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/lisa-carnwell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Legally removing hazardous waste from construction sites | Planning, Building &amp; Construction Today","description":"When removing hazardous waste from a construction site or premises, a hazardous waste consignment note must be prepared. The changes are detailed here","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/","og_locale":"en_US","og_type":"article","og_title":"Legally removing hazardous waste from construction sites","og_description":"When removing hazardous waste from a construction site or premises, a hazardous waste consignment note must be prepared. The changes are detailed here","og_url":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2016-06-06T12:34:02+00:00","article_modified_time":"2022-06-21T14:48:53+00:00","og_image":[{"width":1200,"height":803,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2016\/06\/CIP-image.jpg","type":"image\/jpeg"}],"author":"Lisa Carnwell","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/"},"author":{"name":"Lisa Carnwell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38"},"headline":"Legally removing hazardous waste from construction sites","datePublished":"2016-06-06T12:34:02+00:00","dateModified":"2022-06-21T14:48:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/"},"wordCount":523,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"articleSection":["Health &amp; Safety News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#respond"]}],"copyrightYear":"2016","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/","url":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/","name":"Legally removing hazardous waste from construction sites | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2016-06-06T12:34:02+00:00","dateModified":"2022-06-21T14:48:53+00:00","description":"When removing hazardous waste from a construction site or premises, a hazardous waste consignment note must be prepared. The changes are detailed here","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/health-safety-news\/legally-removing-hazardous-waste-construction-sites\/24426\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Legally removing hazardous waste from construction sites"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/a3c579395b9fa3afe1bb370843acfc38","name":"Lisa Carnwell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1fcf8fe4d0bb386422671c004870f9914448822f3ca1a741922d383c5a867e0e?s=96&d=mm&r=g","caption":"Lisa Carnwell"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/lisa-carnwell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-29 06:30:00","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/24426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=24426"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/24426\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=24426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=24426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=24426"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=24426"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=24426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}