{"id":31025,"date":"2017-02-20T11:26:33","date_gmt":"2017-02-20T11:26:33","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=31025"},"modified":"2017-02-20T12:44:38","modified_gmt":"2017-02-20T12:44:38","slug":"3d-modelling-ensures-quality","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/","title":{"rendered":"3D modelling ensures quality while maintaining control"},"content":{"rendered":"<h2>Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction<\/h2>\n<p>As a result of 3D modelling\u00a0it became apparent that the reinforced concrete could not be constructed as designed by the client.<\/p>\n<p>The problems found were as follows:<\/p>\n<ul>\n<li>Due to the length of the longitudinal bars it would be extremely difficult to install them between steel beams already installed<\/li>\n<li>Closed links would be impossible to install due to the intermediate bracing between the beams<\/li>\n<li>Stirrup reinforcement clashed with the intermediate bracing<\/li>\n<\/ul>\n<h3>3D modelling avoids expensive mistakes<\/h3>\n<p>These problems only became apparent once the 3D model had been created and hence avoided costly delays.<\/p>\n<p>The solutions Martin Young suggested to the client were as follows:<\/p>\n<ul>\n<li>Change the longitudinal reinforcement bars so that the bars could be installed on the ground before the steel beams are lifted into place<\/li>\n<li>Change the closed links to open U bars so that they could be fixed after the intermediate bracing<\/li>\n<li>Move the stirrup reinforcement or move the intermediate bracing away from the reinforced concrete beam<\/li>\n<\/ul>\n<p>These proposed changes would allow the majority of the reinforcement to be installed on the ground, reducing the inherent risk of installing reinforcement at height, during a rail possession at night.<\/p>\n<p>The problems highlighted by the 3D model can be seen from the screenshots below:<\/p>\n<figure id=\"attachment_31027\" aria-describedby=\"caption-attachment-31027\" style=\"width: 700px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-31027\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg\" alt=\"Rackheath\" width=\"700\" height=\"380\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg 700w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802-300x163.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802-100x54.jpg 100w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802-696x378.jpg 696w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption id=\"caption-attachment-31027\" class=\"wp-caption-text\">Diaphragm beam reinforcement with clashes with bracing<\/figcaption><\/figure>\n<figure id=\"attachment_31028\" aria-describedby=\"caption-attachment-31028\" style=\"width: 700px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-31028 size-full\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-e1487589785269.jpg\" alt=\"Rackheath\" width=\"700\" height=\"383\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-e1487589785269.jpg 700w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-e1487589785269-300x164.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-e1487589785269-100x55.jpg 100w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-e1487589785269-696x381.jpg 696w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption id=\"caption-attachment-31028\" class=\"wp-caption-text\">3d model of preferred reinforcement showing additional short straight bars<\/figcaption><\/figure>\n<p>If Balfour Beatty had attempted to construct the bridge without the 3D modelling it would have been impossible to fix the reinforcement as designed.<\/p>\n<p>This would have led to wasted possessions including costs for plant, people and materials, together with delays to the programme.<\/p>\n<p>Bearing in mind that a 1000t crane was intended to be used for lifting the beams into place the costs for the aborted work could easily be in the order of \u00a3500,000<\/p>\n<p>As part of this exercise dynamic cross sections were cut which revealed that there wasn\u2019t enough level difference between the proposed road levels and the proposed beams to accommodate the road surfacing and the deck, as shown below<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-31029\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/3-e1487589838127.jpg\" alt=\"Rackheath\" width=\"700\" height=\"324\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/3-e1487589838127.jpg 700w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/3-e1487589838127-300x139.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/3-e1487589838127-100x46.jpg 100w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/3-e1487589838127-696x322.jpg 696w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>This problem was subsequently sent back to the road designers who had to raise the vertical alignment of the road to allow for the road pavement layers and the deck construction.<\/p>\n<p><a href=\"http:\/\/cassidyforsythe.com\/\"><strong>www.cassidyforsythe.com<\/strong><\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[172712,741],"stakeholder_rel_tag":[172411],"contributor_rel_tag":[],"class_list":{"0":"post-31025","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim-insight","8":"tag-sh-cassidyforsythe","9":"stakeholder_rel_tag-cassidy-forsythe"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>3D modelling ensures quality while maintaining control<\/title>\n<meta name=\"description\" content=\"Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"3D modelling ensures quality while maintaining control\" \/>\n<meta property=\"og:description\" content=\"Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-02-20T11:26:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-02-20T12:44:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/Cassidy-Forsythe-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"171\" \/>\n\t<meta property=\"og:image:height\" content=\"70\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nick Wilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\"},\"author\":{\"name\":\"Nick Wilde\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\"},\"headline\":\"3D modelling ensures quality while maintaining control\",\"datePublished\":\"2017-02-20T11:26:33+00:00\",\"dateModified\":\"2017-02-20T12:44:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\"},\"wordCount\":414,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg\",\"keywords\":[\"BIM Insight\",\"SH CassidyForsythe\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#respond\"]}],\"copyrightYear\":\"2017\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\",\"name\":\"3D modelling ensures quality while maintaining control\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg\",\"datePublished\":\"2017-02-20T11:26:33+00:00\",\"dateModified\":\"2017-02-20T12:44:38+00:00\",\"description\":\"Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg\",\"width\":700,\"height\":380,\"caption\":\"Diaphragm beam reinforcement with clashes with bracing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"3D modelling ensures quality while maintaining control\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\",\"name\":\"Nick Wilde\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"caption\":\"Nick Wilde\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"3D modelling ensures quality while maintaining control","description":"Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/","og_locale":"en_US","og_type":"article","og_title":"3D modelling ensures quality while maintaining control","og_description":"Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2017-02-20T11:26:33+00:00","article_modified_time":"2017-02-20T12:44:38+00:00","og_image":[{"width":171,"height":70,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/Cassidy-Forsythe-1.jpg","type":"image\/jpeg"}],"author":"Nick Wilde","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/"},"author":{"name":"Nick Wilde","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715"},"headline":"3D modelling ensures quality while maintaining control","datePublished":"2017-02-20T11:26:33+00:00","dateModified":"2017-02-20T12:44:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/"},"wordCount":414,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg","keywords":["BIM Insight","SH CassidyForsythe"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#respond"]}],"copyrightYear":"2017","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/","name":"3D modelling ensures quality while maintaining control","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg","datePublished":"2017-02-20T11:26:33+00:00","dateModified":"2017-02-20T12:44:38+00:00","description":"Martin Young, of Cassidy Forsythe explains why 3D modelling Rackheath bridge was a vital part of the project, highlighting problems prior to construction","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-1-e1487589742802.jpg","width":700,"height":380,"caption":"Diaphragm beam reinforcement with clashes with bracing"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/3d-modelling-ensures-quality\/31025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"3D modelling ensures quality while maintaining control"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715","name":"Nick Wilde","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","caption":"Nick Wilde"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-23 01:42:29","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/31025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=31025"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/31025\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=31025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=31025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=31025"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=31025"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=31025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}