{"id":31040,"date":"2017-02-20T11:35:40","date_gmt":"2017-02-20T11:35:40","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=31040"},"modified":"2017-02-21T12:22:12","modified_gmt":"2017-02-21T12:22:12","slug":"cromer-road-interchange","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/","title":{"rendered":"Cromer Road interchange saves \u00a3400k using 3D modelling"},"content":{"rendered":"<h2>The Cromer Road interchange on the Norwich Northern Distributor Road (NNDR) project involves the construction of a new overbridge to take the re-aligned A140 Cromer Road over the NNDR.<\/h2>\n<p>The A140 is one the primary traffic routes into Norwich city centre.<\/p>\n<p>The design of the new bridge placed it very close to the edge of the existing Cromer Road and as such it would need to be constructed whilst traffic was still using the existing road.<\/p>\n<p>Initial construction planning highlighted that extensive temporary works would be required to construct the bridge.<\/p>\n<p>Initial feedback from the supply chain was that these temporary works were envisaged to cost approximately \u00a3500k.<\/p>\n<p>In order to mitigate the potential cost and time impacts on the project, BB proposed that the design alignment of the new Cromer Road be amended to move the new bridge further away from the existing road.<\/p>\n<p>By employing the services of Cassidy Forsythe LTD a specialist BIM Engineer was able to produce an integrated 3D model for the proposed road re-alignment and bridge repositioning.<\/p>\n<p>This model included all relevant temporary and permanent works items, including highway alignment, utility diversions and earthworks slopes.<\/p>\n<p>The model demonstrated that the road could be realigned within the applicable highway design standards, without necessitating a formal change to the scheme DCO.<\/p>\n<p>As a result of the bridge being repositioned, the scope of the temporary works was significantly reduced \u2013 as shown in the screenshot from the model below.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-31042\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg\" alt=\"Cromer Road\" width=\"700\" height=\"415\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg 700w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277-300x178.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277-100x59.jpg 100w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277-696x413.jpg 696w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>The price of the revised sheet piles amounted to \u00a3110k and programme savings in the region of 4 weeks were also achieved from the reduced temporary works scope.<\/p>\n<p>The difference in cost between the original temporary works and the revised temporary works has realised savings amounting to approximately \u00a3400k.<\/p>\n<p>These savings are directly attributable to the BIM Engineer\u2019s ability to create 3D models of the bridge and challenge to design provided by the client.<\/p>\n<p>The model was presented to the Client\u2019s lead designer, which he subsequently accepted and incorporated into their overall model for the NNDR scheme.<\/p>\n<p><a href=\"http:\/\/cassidyforsythe.com\/\"><strong>www.cassidyforsythe.com<\/strong><\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The Cromer Road interchange on the Norwich Northern Distributor Road (NNDR) project involves the construction of a new overbridge to take the re-aligned A140 Cromer Road over the NNDR. The A140 is one the primary traffic routes into Norwich city centre. The design of the new bridge placed it very close to the edge of [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[172712,741],"stakeholder_rel_tag":[172411],"contributor_rel_tag":[],"class_list":{"0":"post-31040","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim-insight","8":"tag-sh-cassidyforsythe","9":"stakeholder_rel_tag-cassidy-forsythe"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cromer Road interchange saves \u00a3400k using 3D modelling | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cromer Road interchange saves \u00a3400k using 3D modelling\" \/>\n<meta property=\"og:description\" content=\"The Cromer Road interchange on the Norwich Northern Distributor Road (NNDR) project involves the construction of a new overbridge to take the re-aligned A140 Cromer Road over the NNDR. The A140 is one the primary traffic routes into Norwich city centre. The design of the new bridge placed it very close to the edge of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-02-20T11:35:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-02-21T12:22:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/Cassidy-Forsythe-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"171\" \/>\n\t<meta property=\"og:image:height\" content=\"70\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nick Wilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\"},\"author\":{\"name\":\"Nick Wilde\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\"},\"headline\":\"Cromer Road interchange saves \u00a3400k using 3D modelling\",\"datePublished\":\"2017-02-20T11:35:40+00:00\",\"dateModified\":\"2017-02-21T12:22:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\"},\"wordCount\":350,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg\",\"keywords\":[\"BIM Insight\",\"SH CassidyForsythe\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#respond\"]}],\"copyrightYear\":\"2017\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\",\"name\":\"Cromer Road interchange saves \u00a3400k using 3D modelling | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg\",\"datePublished\":\"2017-02-20T11:35:40+00:00\",\"dateModified\":\"2017-02-21T12:22:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg\",\"width\":700,\"height\":415,\"caption\":\"Cromer Road\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cromer Road interchange saves \u00a3400k using 3D modelling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\",\"name\":\"Nick Wilde\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"caption\":\"Nick Wilde\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cromer Road interchange saves \u00a3400k using 3D modelling | Planning, Building &amp; Construction Today","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/","og_locale":"en_US","og_type":"article","og_title":"Cromer Road interchange saves \u00a3400k using 3D modelling","og_description":"The Cromer Road interchange on the Norwich Northern Distributor Road (NNDR) project involves the construction of a new overbridge to take the re-aligned A140 Cromer Road over the NNDR. The A140 is one the primary traffic routes into Norwich city centre. The design of the new bridge placed it very close to the edge of [&hellip;]","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2017-02-20T11:35:40+00:00","article_modified_time":"2017-02-21T12:22:12+00:00","og_image":[{"width":171,"height":70,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/Cassidy-Forsythe-1.jpg","type":"image\/jpeg"}],"author":"Nick Wilde","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/"},"author":{"name":"Nick Wilde","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715"},"headline":"Cromer Road interchange saves \u00a3400k using 3D modelling","datePublished":"2017-02-20T11:35:40+00:00","dateModified":"2017-02-21T12:22:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/"},"wordCount":350,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg","keywords":["BIM Insight","SH CassidyForsythe"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#respond"]}],"copyrightYear":"2017","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/","name":"Cromer Road interchange saves \u00a3400k using 3D modelling | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg","datePublished":"2017-02-20T11:35:40+00:00","dateModified":"2017-02-21T12:22:12+00:00","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/02\/1-2-e1487590501277.jpg","width":700,"height":415,"caption":"Cromer Road"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/cromer-road-interchange\/31040\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Cromer Road interchange saves \u00a3400k using 3D modelling"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715","name":"Nick Wilde","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","caption":"Nick Wilde"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-26 01:20:43","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/31040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=31040"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/31040\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=31040"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=31040"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=31040"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=31040"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=31040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}