{"id":41017,"date":"2018-05-02T12:37:58","date_gmt":"2018-05-02T11:37:58","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=41017"},"modified":"2022-10-19T15:43:42","modified_gmt":"2022-10-19T14:43:42","slug":"tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/","title":{"rendered":"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer"},"content":{"rendered":"<h2>TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry<\/h2>\n<p>The <a href=\"https:\/\/www.tideway.london\/\">Thames Tideway Tunnel<\/a> is a major new sewer urgently needed to protect the tidal River Thames from pollution, which is due to be completed in 2023. Stretching 25km along the route of the River Thames at a depth of 65m, the tunnel will be more than seven metres in diameter. It is the largest infrastructure project ever undertaken by the UK water industry. As this major project progresses, it is vital for all contractors to integrate their works, plan and collaborate effectively. It is for that reason that TILOS has been in use since 2010 to help visualise the entirety of the works.<\/p>\n<p>TILOS is a software application that is designed for planning, managing and delivering linear construction projects. It combines the flexibility of a drawing package with the power of project management, and to exchange data seamlessly with other major project planning software packages.<\/p>\n<p>For almost five years, Evangelos Kovaios, the integration scheduler \u2013 programme controls for Tideway, worked to evolve the use of TILOS for maximum effectiveness, liaising closely with <a href=\"https:\/\/www.pbctoday.co.uk\/news\/tag\/sh-elecosoft\/\">Elecosoft<\/a> to shape and fine-tune the template around the complex requirements of this significant, multi-party project, and create ever-clearer visual representation.<\/p>\n<p>Today, TILOS delivers an unparalleled, complete overview of the Thames Tideway Tunnel project, which informs monthly integration meetings and forms an essential part of board communication for stakeholder organisations.<\/p>\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-41018 aligncenter\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png\" alt=\"Planning software\" width=\"886\" height=\"502\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png 886w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1-300x170.png 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1-768x435.png 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1-696x394.png 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1-741x420.png 741w\" sizes=\"auto, (max-width: 886px) 100vw, 886px\" \/><strong>There are seven essential benefits which he believes TILOS brings to the project:<\/strong><\/h3>\n<h3>Tell the whole project story in one page<\/h3>\n<p>\u201cTILOS gives us the ability to tell the whole project story graphically on one single page. That is very important for Tideway because, including all the contractors, we have between 50-60 thousand activities to manage. A percentage of these are pulled into a summarised Project Master Programme in TILOS, which has around 1,000 activities that represents our construction programme.\u201d<\/p>\n<h3>Anyone on the team can understand the plan<\/h3>\n<p>\u201cTILOS makes it easy for anyone on the project to understand the programme, and it really works excellently as a communication tool between the project teams for East, West and Central sections, and the system integrator. We also include the enabling works within our TILOS plan, since we can\u2019t start work on any site until they finish their activities.\u201d<\/p>\n<h3>Collaborative \u2018what if\u2019 scenario planning<\/h3>\n<p>\u201cThe Tideway project has three major contractors working together, who need to collaborate and integrate their schedules all the time. Using TILOS, it is very easy for us to do that, create \u2018what if\u2019 scenarios and assess any opportunities we have on the project. Construction managers have a visual representation, then based on that can suggest different ways to do the tunnelling or interfaces. Within an hour, we can have multiple scenarios worked out, and see the impact of each one on the actual integration of the programme.\u201d<\/p>\n<h3>Clear sight of the critical path<\/h3>\n<p>\u201cEach individual team develops their own programmes in silos, but then we need to glue the programmes together with interface milestones between them. We can integrate the schedule in our project planning software, but then the critical path changes. We produce the TILOS after the integration and can actually see the critical path on one page. That way, we know what affects what, can see if we need to change the logic, or start a new \u2018what if\u2019 scenario.\u201d<\/p>\n<h3>Providing focus for integration meetings<\/h3>\n<p>\u201cOur TILOS is used in every integration meeting \u2013 we can\u2019t go ahead until we have produced it. Because every single person in the team has a TILOS output in front of them, we\u2019re all talking the same language. There are usually at least 12 people at each meeting, including delivery managers, planners, construction managers and others. It puts everyone on the same page.\u201d<\/p>\n<h3>Essential for high-level reporting<\/h3>\n<p>\u201cTILOS is so valuable that it has been used for the past year in the official board report for each project period. It\u2019s easy to create \u2018what if\u2019 scenarios so we run two versions of the programme: the non-mitigated and the mitigated version for the board.<\/p>\n<p>\u201cWe have used the \u2018what if\u2019 scenario planning capability of TILOS in our QRSA risk analysis and reporting process. Each quarter, we run a risk analysis and model two scenarios, which assume 50% and 80% of identified risks occur. This year we started modelling these programmes, called P50 and P80, in TILOS. People can now see the comparison on a single page between our baseline, our current forecast and the P50 or P80 forecasts, along with the impact on completion timeframes.\u201d<\/p>\n<h3>Effortless programme planning data exchange<\/h3>\n<p>\u201cThe easy and automated integration with our programme planning software is ideal. We programme in another software package, but TILOS has the amazing capability to suck all the information out and create an output automatically. Without this automation, we would never be able to turn around such a quick representation of our plans. The planning maturity and the TILOS template we have evolved in the past few years mean that for each TILOS output, it only takes us 10 minutes to create the PDF.<\/p>\n<p>\u201cSpeed is essential when we integrate the programmes. Each period, there is a \u2018data date\u2019 by which all contractors must report their progress. Then there is a short time of checking and manipulating, accepting or rejecting information. Once that ends, from the point that data is locked down in the programme planning software each period, we have less than a day to generate the summary programme and our integrated TILOS view, ready for the integration meeting. Because of the TILOS integration with the planning software, we can generate everything really quickly.<\/p>\n<p>\u201cWe don\u2019t use TILOS for most of the month, but on that single day it is critical \u2013 it can exchange information with the planning software, and produce the output automatically and quickly, so we don\u2019t have to do any slow data input or typing.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Elecosoft<\/strong><\/p>\n<p>Tel: +44 (0)1844 261 700<\/p>\n<p><a href=\"mailto:info@elecosoft.com\">info@elecosoft.com<\/a><\/p>\n<p><a href=\"http:\/\/www.elecosoft.com\">www.elecosoft.com<\/a><\/p>\n<p>Twitter: <a href=\"http:\/\/www.twitter.com\/astapmsoftware\">@astapmsoftware<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[576,852,856,574,579,389],"stakeholder_rel_tag":[172433],"contributor_rel_tag":[],"class_list":{"0":"post-41017","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim-software","8":"tag-bim-today-may-2018","9":"tag-construction-technology","10":"tag-data-management","11":"tag-infrastructure","12":"tag-sh-elecosoft","13":"stakeholder_rel_tag-eleco"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer | Planning, Building &amp; Construction Today<\/title>\n<meta name=\"description\" content=\"TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer\" \/>\n<meta property=\"og:description\" content=\"TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-02T11:37:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-19T14:43:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe.png\" \/>\n\t<meta property=\"og:image:width\" content=\"885\" \/>\n\t<meta property=\"og:image:height\" content=\"503\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer\",\"datePublished\":\"2018-05-02T11:37:58+00:00\",\"dateModified\":\"2022-10-19T14:43:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\"},\"wordCount\":1021,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png\",\"keywords\":[\"BIM Software\",\"BIM Today May 2018\",\"Construction Technology\",\"Data Management\",\"Infrastructure\",\"SH Elecosoft\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#respond\"]}],\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\",\"name\":\"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer | Planning, Building &amp; Construction Today\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png\",\"datePublished\":\"2018-05-02T11:37:58+00:00\",\"dateModified\":\"2022-10-19T14:43:42+00:00\",\"description\":\"TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png\",\"width\":886,\"height\":502,\"caption\":\"Planning software\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer | Planning, Building &amp; Construction Today","description":"TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/","og_locale":"en_US","og_type":"article","og_title":"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer","og_description":"TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2018-05-02T11:37:58+00:00","article_modified_time":"2022-10-19T14:43:42+00:00","og_image":[{"width":885,"height":503,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe.png","type":"image\/png"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer","datePublished":"2018-05-02T11:37:58+00:00","dateModified":"2022-10-19T14:43:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/"},"wordCount":1021,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png","keywords":["BIM Software","BIM Today May 2018","Construction Technology","Data Management","Infrastructure","SH Elecosoft"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#respond"]}],"copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/","name":"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer | Planning, Building &amp; Construction Today","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png","datePublished":"2018-05-02T11:37:58+00:00","dateModified":"2022-10-19T14:43:42+00:00","description":"TILOS is playing a key role in the delivery of the Thames Tideway super-sewer, the largest-ever infrastructure project undertaken by the UK water industry","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/05\/K-Naefe-1.png","width":886,"height":502,"caption":"Planning software"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/tilos-helps-thames-tideway-teams-to-visualise-and-integrate-plans\/41017\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Case study: TILOS helps Thames Tideway teams to visualise and integrate plans for 25km London super-sewer"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-11 18:51:28","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/41017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=41017"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/41017\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=41017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=41017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=41017"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=41017"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=41017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}