{"id":47421,"date":"2018-09-24T16:20:14","date_gmt":"2018-09-24T15:20:14","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=47421"},"modified":"2018-11-15T11:03:37","modified_gmt":"2018-11-15T11:03:37","slug":"site-diary-electronic-contemporaneous-record-capture-on-site","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/","title":{"rendered":"Site Diary \u2013 electronic contemporaneous record capture on site"},"content":{"rendered":"<h2>COMIT discuss its implementation of\u00a0electronic contemporaneous record capture as part of its site diary solution to meet industry requirements<\/h2>\n<p>First COMIT provided a useful summary revealing how the <strong>Site Diary<\/strong> solution meets a core industry business problem of how to efficiently digitise site diary information in a more contemporaneous way.<\/p>\n<p>They also describe the development of <strong>Site Diary<\/strong>, provide a detailed explanation of the issues arising using a paper-based site journal and the nature of the solution, its usage and benefits.<\/p>\n<h3>The problems Site Diary resolves<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-47423 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png\" alt=\"Costain site worker\" width=\"229\" height=\"232\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png 524w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker-296x300.png 296w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker-414x420.png 414w\" sizes=\"auto, (max-width: 229px) 100vw, 229px\" \/>COMIT highlight the fact that an important part of a site worker, such as a site engineer, is following progress and issues on site. Traditionally this is done by keeping a paper-based daily diary. Increasingly often this has been written up in electronic form at the end of the day but relies on memory and handwritten notes made on site.* This is a time consuming and inaccurate method that is hard to integrate with other evidence such as photographs.<\/p>\n<p>* Most of the legal value of a site diary comes from it being a contemporaneous record, made at or near the time events happen. It\u2019s therefore critical site records are detailed, high quality and as contemporaneous as possible. This is difficult to achieve with a paper-based process.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-47425\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Site-diary-e1537802129770.jpg\" alt=\"Site diary\" width=\"700\" height=\"396\" \/><\/p>\n<h3>The paperless Site Diary solution<\/h3>\n<p>By providing a way of recording information on site electronically and integrating this with photographic, location and weather information and other such evidence, COMIT explains that <strong>Site Diary<\/strong> web app allows progress and issues on site to be tracked and a clear diary format* achieved with a higher level of quality and detail through a predominantly, if not exclusively paperless process.<\/p>\n<p>*The <strong>Site Diary<\/strong> web app is occasionally used by site managers and site engineers to download data and print for use in meetings, otherwise there is no paper involved.<\/p>\n<h3>Site Diary benefits<\/h3>\n<p>COMIT mention how Script&amp;Go has<strong><em> \u201cimproved its functionality and made it more user-friendly<\/em><\/strong><em>,\u201d<\/em> to give <strong>Site Diary<\/strong> the format it has today.<\/p>\n<p>They outline the principal benefits that Costain, particularly its site engineers, can derive from using <strong>Site Diary<\/strong> as follows:<\/p>\n<ul>\n<li>1-2 hrs\/day saved compared to paper-based methods<\/li>\n<li>More accurate and detailed records<\/li>\n<li>Time and location automatically recorded<\/li>\n<li>Photographs linked permanently to relevant diary entries<\/li>\n<li>Almost instantaneous diary entries available<\/li>\n<li>No information \u201clost\u201d over time. Data stored securely in the cloud<\/li>\n<li>Easier record sharing and information sharing<\/li>\n<li>Quicker and more reliable data and information retrieva<\/li>\n<li>More up-to-date records should they be relied on as legal evidence<\/li>\n<\/ul>\n<h3>Future development of Site Diary<\/h3>\n<p>A frank overview of current limitations and an outline of the future direction of travel for the development of <strong>Site Diary<\/strong> are then given.<\/p>\n<p>COMIT state that \u201c<em>although it is an <strong>extremely useful tool<\/strong>, there is still scope for improvement with both the hardware and software of Site Diary.<\/em>\u201d<\/p>\n<p>They go on to provide an indication of the steps being considered for developing <strong>Site Diary <\/strong>further, such as voice and handwriting recognition technology, to make data entry even easier.<\/p>\n<h3>Cost benefit: Return on Investment<\/h3>\n<p>As COMIT explain, <strong>Site Diary<\/strong> appears to offer a 1-2 hr\/day\/user time saving (typically for an engineer). Cost savings relating to this necessarily depend on supporting infrastructure (hardware, IT support and so on), however a ballpark guide to likely return on investment (ROI) is possible.<\/p>\n<p>COMIT explain that based on \u00a330K as a representative user salary today, \u201c<strong><em>Site Diary<\/em><\/strong><em> can save \u00a3250-\u00a3500\/month\/user<\/em>\u201d and that even allowing for the cost of a suitable mobile device* and training, ROI is likely to be under 4 months.<\/p>\n<p><em>*Note <strong>Site Diary <\/strong>can also be used for on site or offsite construction manufacturing assembly environments with Bring Your Own Device (BYOD) policies in place.<\/em><\/p>\n<p>Script&amp;Go thanks COMIT for creating this case study detailing the <strong>Site Diary<\/strong> solution. This should enable others worldwide, like them to understand how to improve their productivity daily, reduce risk, and benefit from using a contemporaneous electronic site diary.<\/p>\n<p>&nbsp;<\/p>\n<p>For further information on the use of <strong>Site Diary<\/strong>, Script&amp;Go remains at your disposition.<\/p>\n<p>To discuss your individual, project wide or enterprise level needs <a href=\"http:\/\/www.scriptandgo.com\/en\/our-team\/\">contact Script&amp;Go\u2019s international team,<\/a> or simply <a href=\"https:\/\/signup.mobilesitediary.com\/\">trial it for free<\/a> today.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[676,172717,855,859],"stakeholder_rel_tag":[172514],"contributor_rel_tag":[],"class_list":{"0":"post-47421","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-construction","8":"tag-planning-construction-insight","9":"tag-sh-scriptgo","10":"tag-site-diary","11":"stakeholder_rel_tag-script-and-go"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Site Diary \u2013 electronic contemporaneous record capture on site<\/title>\n<meta name=\"description\" content=\"COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Site Diary \u2013 electronic contemporaneous record capture on site\" \/>\n<meta property=\"og:description\" content=\"COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-24T15:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-11-15T11:03:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/06\/ScriptGo_edited-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"171\" \/>\n\t<meta property=\"og:image:height\" content=\"70\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nick Wilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\"},\"author\":{\"name\":\"Nick Wilde\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\"},\"headline\":\"Site Diary \u2013 electronic contemporaneous record capture on site\",\"datePublished\":\"2018-09-24T15:20:14+00:00\",\"dateModified\":\"2018-11-15T11:03:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\"},\"wordCount\":714,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png\",\"keywords\":[\"Construction Processes\",\"Planning &amp; Construction Insight\",\"sh Script&amp;Go\",\"Site Diary\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#respond\"]}],\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\",\"name\":\"Site Diary \u2013 electronic contemporaneous record capture on site\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png\",\"datePublished\":\"2018-09-24T15:20:14+00:00\",\"dateModified\":\"2018-11-15T11:03:37+00:00\",\"description\":\"COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png\",\"width\":524,\"height\":531,\"caption\":\"Costain site worker\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Site Diary \u2013 electronic contemporaneous record capture on site\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\",\"name\":\"Nick Wilde\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"caption\":\"Nick Wilde\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Site Diary \u2013 electronic contemporaneous record capture on site","description":"COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/","og_locale":"en_US","og_type":"article","og_title":"Site Diary \u2013 electronic contemporaneous record capture on site","og_description":"COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2018-09-24T15:20:14+00:00","article_modified_time":"2018-11-15T11:03:37+00:00","og_image":[{"width":171,"height":70,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/06\/ScriptGo_edited-1.jpg","type":"image\/jpeg"}],"author":"Nick Wilde","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/"},"author":{"name":"Nick Wilde","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715"},"headline":"Site Diary \u2013 electronic contemporaneous record capture on site","datePublished":"2018-09-24T15:20:14+00:00","dateModified":"2018-11-15T11:03:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/"},"wordCount":714,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png","keywords":["Construction Processes","Planning &amp; Construction Insight","sh Script&amp;Go","Site Diary"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#respond"]}],"copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/","name":"Site Diary \u2013 electronic contemporaneous record capture on site","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png","datePublished":"2018-09-24T15:20:14+00:00","dateModified":"2018-11-15T11:03:37+00:00","description":"COMIT discuss their implementation of\u00a0electronic contemporaneous record capture as part of their site diary solution to meet industry requirements","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/09\/Costain-site-worker.png","width":524,"height":531,"caption":"Costain site worker"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/site-diary-electronic-contemporaneous-record-capture-on-site\/47421\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Site Diary \u2013 electronic contemporaneous record capture on site"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715","name":"Nick Wilde","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","caption":"Nick Wilde"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 00:46:23","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/47421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=47421"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/47421\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=47421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=47421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=47421"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=47421"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=47421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}