{"id":47596,"date":"2018-10-01T15:30:52","date_gmt":"2018-10-01T14:30:52","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=47596"},"modified":"2018-10-01T15:30:52","modified_gmt":"2018-10-01T14:30:52","slug":"underfloor-air-conditioning-hammersley","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/","title":{"rendered":"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street"},"content":{"rendered":"<h2><a href=\"https:\/\/www.pbctoday.co.uk\/news\/stakeholders\/building-control-stakeholders\/advanced-ergonomic-technologies-ltd\/34015\/\" target=\"_blank\" rel=\"noopener\">AET Flexible Space<\/a>, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018.<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-47602 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg\" alt=\"Hammersley House Tenant Fit-out\" width=\"347\" height=\"231\" \/>The six floor property offers both retail and office accommodation and was fully redeveloped by building owners, Royal London Asset Management.\u00a0 The 16,311 sq. ft. building was stripped back to the core and underwent a full redevelopment, including redesigned windows and a vibrant new green brick fa\u00e7ade to grant more architectural definition and visual interest from the street.<\/p>\n<h3>Underfloor air conditioning<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-47601  alignleft\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-11-e1538403823408.jpg\" alt=\"Underfloor air conditioning\" width=\"351\" height=\"234\" \/>Underfloor air conditioning was specified by M&amp;E Consultant, MTT for the refurbishment and is installed over 11,000 sq. ft. of Grade \u2013 A office accommodation on floors 1-4.\u00a0 With underfloor systems, fully conditioned air is fed into the plenum by zonal downflow units (CAM), which is then supplied into the workspace via fan terminal units (Fantile) recessed into the floor.\u00a0 Systems can be either chilled water or direct expansion, configured with either floor level or high level return and they can easily integrate with passive or other ventilation systems.\u00a0 Testament to the design, the building was awarded BREEAM Very Good and shortlisted for the New London Architecture Awards 2018 \u2013 Offices category.<\/p>\n<p>The system installed at 6 Warwick Street is a CAM-V direct expansion (DX) system, with underfloor supply air and return air at high level.\u00a0 The high level return air option can offer greater flexibility for positioning Fantiles for future and speculative tenants as there is no air segregation baffle dividing the underfloor plenum. \u00a0The fourth floor with its striking, angled floor to ceiling windows is the first to be occupied, with the entire floor leased by pulp and paper specialists, Pulp Mill Trading Ltd.<\/p>\n<h3>New tenant layout<\/h3>\n<p>Working for Maris Interiors, AET Engineers carried out an initial system survey and subsequently supplied and installed new equipment to cater to the new tenant layout.\u00a0 This included relocating and supplying additional Fantiles and associated cabling and commissioning, supplying a number of return air grilles and sound attenuator boxes to boost return air flow from the cellularised space and five FlexTouch wall controllers permitting easy user control of airflow and temperature.\u00a0 All programming and setting to work of the new equipment was carried out and the new workspace was ready for occupation by Pulp Mill Trading in July.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-47603\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-15-e1538404205872.jpg\" alt=\"Hammersley underfloor air conditioning fit-out\" width=\"700\" height=\"467\" \/><\/p>\n<p><a href=\"http:\/\/www.flexiblespace.com\/\" target=\"_blank\" rel=\"noopener\">For more information, visit\u00a0<strong>www.flexiblespace.com<\/strong><\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[306],"tags":[566,172716,774,803],"stakeholder_rel_tag":[172365],"contributor_rel_tag":[],"class_list":{"0":"post-47596","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-building-control-news","7":"tag-air-quality","8":"tag-building-control-insight","9":"tag-sh-advanced-ergonomic-technologies","10":"tag-ventilation","11":"stakeholder_rel_tag-advanced-ergonomic-technologies"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Underfloor air conditioning tenant fit-out at Hammersley House<\/title>\n<meta name=\"description\" content=\"AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street\" \/>\n<meta property=\"og:description\" content=\"AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-01T14:30:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/07\/AET.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"171\" \/>\n\t<meta property=\"og:image:height\" content=\"70\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nick Wilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\"},\"author\":{\"name\":\"Nick Wilde\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\"},\"headline\":\"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street\",\"datePublished\":\"2018-10-01T14:30:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\"},\"wordCount\":392,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg\",\"keywords\":[\"Air Quality\",\"Building Control Insight\",\"SH Advanced Ergonomic Technologies\",\"Ventilation\"],\"articleSection\":[\"Building Control News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#respond\"]}],\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\",\"name\":\"Underfloor air conditioning tenant fit-out at Hammersley House\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg\",\"datePublished\":\"2018-10-01T14:30:52+00:00\",\"description\":\"AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg\",\"width\":500,\"height\":333,\"caption\":\"Hammersley House Tenant Fit-out\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\",\"name\":\"Nick Wilde\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"caption\":\"Nick Wilde\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Underfloor air conditioning tenant fit-out at Hammersley House","description":"AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/","og_locale":"en_US","og_type":"article","og_title":"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street","og_description":"AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0","og_url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2018-10-01T14:30:52+00:00","og_image":[{"width":171,"height":70,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/07\/AET.jpg","type":"image\/jpeg"}],"author":"Nick Wilde","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/"},"author":{"name":"Nick Wilde","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715"},"headline":"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street","datePublished":"2018-10-01T14:30:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/"},"wordCount":392,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg","keywords":["Air Quality","Building Control Insight","SH Advanced Ergonomic Technologies","Ventilation"],"articleSection":["Building Control News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#respond"]}],"copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/","url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/","name":"Underfloor air conditioning tenant fit-out at Hammersley House","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg","datePublished":"2018-10-01T14:30:52+00:00","description":"AET Flexible Space, underfloor air conditioning specialists completed the Cat-A finish for this West End project at 6 Warwick Street early in 2018. \u00a0","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Hammersley-19-e1538404087314.jpg","width":500,"height":333,"caption":"Hammersley House Tenant Fit-out"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-hammersley\/47596\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Underfloor air conditioning fit-out at Hammersley House, 6 Warwick Street"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715","name":"Nick Wilde","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","caption":"Nick Wilde"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-14 02:22:32","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/47596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=47596"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/47596\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=47596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=47596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=47596"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=47596"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=47596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}