{"id":47803,"date":"2018-10-10T10:06:55","date_gmt":"2018-10-10T09:06:55","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=47803"},"modified":"2018-10-09T10:07:05","modified_gmt":"2018-10-09T09:07:05","slug":"about-access-accessible-design","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/","title":{"rendered":"About Access knows getting it right first time will keep costs down"},"content":{"rendered":"<h2>Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on<\/h2>\n<p>We see examples every day to tell us that where there are steps, it may be helpful to have a ramp and where there are toilets then nearby there should be one that is <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/report-reveals-inadequate-accessible-housing-now-a-major-barrier\/40832\/\">accessible<\/a>. But what does all that really mean?<\/p>\n<p>The same thought processes that recognise those needs should also flag up that it\u2019s not enough to have just any old ramp. And a loo doesn\u2019t become accessible just because you widen the door and stick a picture of a wheelchair on it.<\/p>\n<p>By failing when designing to accommodate access for <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/opportunities-outweigh-cost-designing-disabled-people\/23448\/\">disabled people<\/a>, you may face the costs of fixing errors, loss of business and compensation, and it underlines the importance of getting the design right at the outset.<\/p>\n<p>A construction project or major renovation can involve an army of experts, each a specialist in their respective disciplines but not necessarily able to anticipate the accessibility impact of their contributions on the wider project.<\/p>\n<p>For every \u00a31 spent remedying a problem at the concept and preparation phase you can expect to spend \u00a310 if the problem is not resolved by the time you get to scoping a project, and \u00a3100 at the planning and pre-construction stage.<\/p>\n<p>Add another zero if the problem is still there at the point of application and construction, and be prepared for that initial \u00a31 to climb to \u00a310,000 if you have to make alterations once the property is occupied and in use.<\/p>\n<p>A client of ours contacted us because an architect elsewhere on the site had designed a ramp that didn\u2019t work. They\u2019d had to arrange for the ramp to be removed, redesigned and rebuilt. This was all at the architect\u2019s expense, but the site owner was keen to avoid a repeat of the inconvenience.<\/p>\n<p>It was clear that, without our input, the same failings would have happened. We found issues with contrasting landings and nosings to help visually impaired people, handrails which didn\u2019t extend beyond the top and bottom of the accompanying steps, and no consideration given to the clear effective width of the door.<\/p>\n<p>By having an access consultant on the team, you can ensure you get things right first time, avoiding the delays and cost that result from having to revise the work of one specialist and then make sure it fits with the plans of all the others.<\/p>\n<p>The savings in time and money are such that typically the investment will pay for itself, and that\u2019s before you consider the possible costs of a discrimination claim and the loss of business when a disabled person and the other members of their party decide to shop, eat or stay elsewhere.<\/p>\n<p>For further information on how About Access can help you and your properties please contact us.<\/p>\n<p><em>Please note: this is a commercial profile<\/em><\/p>\n<p><strong>Ian Streets<\/strong><\/p>\n<p><strong>Managing Director<\/strong><\/p>\n<p><strong>About Access<\/strong><\/p>\n<p>Tel: 01482 651101<\/p>\n<p><a href=\"mailto:ian@aboutaccess.co.uk\">ian@aboutaccess.co.uk<\/a><\/p>\n<p><a href=\"http:\/\/www.aboutaccess.co.uk\">www.aboutaccess.co.uk<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on. <\/p>\n","protected":false},"author":18,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[702,594,464,1424,395],"stakeholder_rel_tag":[172362],"contributor_rel_tag":[],"class_list":{"0":"post-47803","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-architecture","8":"tag-building-design","9":"tag-contributor-profile","10":"tag-pbc-today-november-2018","11":"tag-sh-about-access","12":"stakeholder_rel_tag-about-access"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>About Access knows getting it right first time will keep costs down<\/title>\n<meta name=\"description\" content=\"Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"About Access knows getting it right first time will keep costs down\" \/>\n<meta property=\"og:description\" content=\"Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-10T09:06:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Step-pic-12.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"1523\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sally Eccleston\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\"},\"author\":{\"name\":\"Sally Eccleston\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e\"},\"headline\":\"About Access knows getting it right first time will keep costs down\",\"datePublished\":\"2018-10-10T09:06:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\"},\"wordCount\":511,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Architecture\",\"Building Design\",\"Contributor Profile\",\"PBC Today November 2018\",\"SH About Access\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#respond\"]}],\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\",\"name\":\"About Access knows getting it right first time will keep costs down\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2018-10-10T09:06:55+00:00\",\"description\":\"Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"About Access knows getting it right first time will keep costs down\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e\",\"name\":\"Sally Eccleston\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g\",\"caption\":\"Sally Eccleston\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/sallyeccleston\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"About Access knows getting it right first time will keep costs down","description":"Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/","og_locale":"en_US","og_type":"article","og_title":"About Access knows getting it right first time will keep costs down","og_description":"Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on.","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2018-10-10T09:06:55+00:00","og_image":[{"width":1200,"height":1523,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Step-pic-12.jpg","type":"image\/jpeg"}],"author":"Sally Eccleston","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/"},"author":{"name":"Sally Eccleston","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e"},"headline":"About Access knows getting it right first time will keep costs down","datePublished":"2018-10-10T09:06:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/"},"wordCount":511,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Architecture","Building Design","Contributor Profile","PBC Today November 2018","SH About Access"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#respond"]}],"copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/","name":"About Access knows getting it right first time will keep costs down","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2018-10-10T09:06:55+00:00","description":"Considering accessibility at the design stage can avoid costly delays during construction \u2013 and potential loss of business later on.","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/about-access-accessible-design\/47803\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"About Access knows getting it right first time will keep costs down"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e","name":"Sally Eccleston","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g","caption":"Sally Eccleston"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/sallyeccleston\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-14 19:28:03","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/47803","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=47803"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/47803\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=47803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=47803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=47803"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=47803"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=47803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}