{"id":48000,"date":"2018-10-16T15:27:11","date_gmt":"2018-10-16T14:27:11","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=48000"},"modified":"2018-10-16T15:27:11","modified_gmt":"2018-10-16T14:27:11","slug":"modular-student-homes-scheme","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/","title":{"rendered":"Modular student homes scheme completed in record time"},"content":{"rendered":"<h2>Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a 257-bed modular student homes scheme in London<\/h2>\n<p>The 700 sqm site was able to be brought forward for development due to the use of innovative <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/modular-construction-guide\/44042\/\">modular construction<\/a> methods and was built in record-breaking time of nine months, ensuring that it was delivered in time for the first students moving in for the 2018\/2019 academic year.<\/p>\n<p>Tide Construction used their award-winning methods to build a modular scheme on this site and, by using their pioneering techniques the project has overcome space constraints with minimal disruption to the local area.<\/p>\n<p>The development is located on a long, narrow site of land next Holloway Road Tube station which is partially owned by <a href=\"https:\/\/tfl.gov.uk\/\">Transport for London (TfL)<\/a>, and is also on one of London\u2019s designated priority \u201cRed Routes\u201d.<\/p>\n<p><a href=\"http:\/\/tideconstruction.co.uk\/\">Tide Construction<\/a> and <a href=\"http:\/\/www.visionmodular.com\/\">Vision Modular Systems<\/a> had to work in close collaboration with TfL. The site was also situated close by to Arsenal Football Club\u2019s Emirates, so it was vital that the development did not affect the fans wanting to make their way to watch their team play at home.<\/p>\n<p>The development is comprised of 308 modules that were manufactured using production-line techniques in Vision\u2019s Bedford factory. After a rigorous quality control process, each module was then transported to the site in Holloway Road before being craned carefully into place.<\/p>\n<p>\u201cModular construction is increasingly being favoured for development on tight urban sites due to the many benefits it brings\u201d,\u00a0said Christy Hayes, CEO of Tide Construction.<\/p>\n<p>\u201cMany of the smaller sites in cities like London are too restricted for traditional construction methods to be successfully applied. This has created a huge opportunity for systems like ours, which use offsite manufacturing facilities to help minimise the disruption to the local area.<\/p>\n<p>\u201cThe success of the scheme and the speed of development highlights the potential of modular construction for restricted urban sites. Working closely with Transport for London, we were able to take advantage of this exciting opportunity and ensure that only a minimal impact was made to those wishing to use the Tube to travel across the capital,\u201d Hayes added.<\/p>\n<p>Graeme Craig, Director of Commercial Development at Transport for London, said:\u00a0\u201cWorking in collaboration with Tide Construction and Vision Modular Housing, using part of our land next to Holloway Road Tube station, we have been able to provide housing that the capital desperately needs, while raising vital revenue that can be reinvested in the transport network.<\/p>\n<p>\u201cThis project shows how the industry can use fresh and innovative approaches to unlock complex, challenging sites, which might otherwise be impossible to deliver using conventional methods of construction, and ensure that any impact on those travelling across London is kept to a minimum.\u201d<\/p>\n<p>Chapter Highbury II will be the 3rd scheme that Vision\u2019s modular techniques have delivered for Chapter, and their 10th\u00a0student scheme in London.<\/p>\n<p>Tide Construction and Vision Modular Systems are active in the residential market with over 1,300 apartments currently under construction, and many other sites under advanced negotiations, illustrating this form of construction has become mainstream.<\/p>\n<p>They have recently commenced their George Street project in Croydon, south London which has a total construction programme of just over 2 years.\u00a0 Upon completion, Tide Construction will deliver the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/tide-wins-planning-consent-for-tallest-modular-construction-tower\/36906\/\">tallest modular towers<\/a> in the world, reaching 38 and 44 storeys, and offering 550 homes for private rent.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a 257-bed modular student homes scheme in London<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[676,916,627,696],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-48000","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-construction","8":"tag-modern-methods-of-construction","9":"tag-modular-construction","10":"tag-offsite-construction"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Modular student homes scheme completed in record time<\/title>\n<meta name=\"description\" content=\"Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a modular student homes scheme\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modular student homes scheme completed in record time\" \/>\n<meta property=\"og:description\" content=\"Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a 257-bed modular student homes scheme in London\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-16T14:27:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Modular-student-homes-scheme-completed-in-record-time.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1335\" \/>\n\t<meta property=\"og:image:height\" content=\"2000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Modular student homes scheme completed in record time\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Modular student homes scheme completed in record time\",\"datePublished\":\"2018-10-16T14:27:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\"},\"wordCount\":568,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Construction Processes\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#respond\"]}],\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\",\"name\":\"Modular student homes scheme completed in record time\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2018-10-16T14:27:11+00:00\",\"description\":\"Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a modular student homes scheme\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modular student homes scheme completed in record time\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Modular student homes scheme completed in record time","description":"Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a modular student homes scheme","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/","og_locale":"en_US","og_type":"article","og_title":"Modular student homes scheme completed in record time","og_description":"Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a 257-bed modular student homes scheme in London","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2018-10-16T14:27:11+00:00","og_image":[{"width":1335,"height":2000,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/10\/Modular-student-homes-scheme-completed-in-record-time.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Modular student homes scheme completed in record time","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Modular student homes scheme completed in record time","datePublished":"2018-10-16T14:27:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/"},"wordCount":568,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Construction Processes","Modern Methods of Construction","Modular Construction","Offsite Construction"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#respond"]}],"copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/","name":"Modular student homes scheme completed in record time","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2018-10-16T14:27:11+00:00","description":"Tide Construction and their offsite manufacturing company, Vision Modular Systems, have completed Chapter Highbury II, a modular student homes scheme","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/modular-student-homes-scheme\/48000\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Modular student homes scheme completed in record time"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 14:39:25","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/48000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=48000"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/48000\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=48000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=48000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=48000"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=48000"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=48000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}