{"id":48982,"date":"2018-11-12T14:57:31","date_gmt":"2018-11-12T14:57:31","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=48982"},"modified":"2018-11-12T15:07:03","modified_gmt":"2018-11-12T15:07:03","slug":"digital-twin-script-go","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/","title":{"rendered":"Site Digital Twin: Physical vs digital worksites"},"content":{"rendered":"<h2>A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date<\/h2>\n<p>The construction sector is becoming increasingly <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/business-collaborator-project-information\/47872\/\">digital<\/a> despite a rocky start. Today, we are all witnessing the craze for <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bim-workflows-lower-cost-of-zhengzhou-xixia\/48954\/\">BIM<\/a> 3D\/4D\/5D, and it sometimes seems as if it is the only thing that matters innovation-wise.<\/p>\n<p>Digitalisation in the industry is, in effect, way broader. CRM and Inventory Systems have been fully deployed in most major companies. Analytics at the procurement and production level are now at an advanced stage of maturity, with plenty of new technologies such as collaboration apps, AR\/MR, UAVs, IOT and RFID popping up at construction sites.<\/p>\n<p>Proliferation of digital platforms in the field will eventually become a problem if tech companies and start-ups do not cooperate with the ultimate goal of connecting all the systems together, including but not limited to BIM models. With the few tools we use today, it is already a nightmare when it comes to keeping information up to date. Moreover, duplication of work for actions such as creating profiles and tasks or projects in applications is a concern and reduces the advantages of digital transformation. At <a href=\"http:\/\/www.scriptandgo.com\/\">Script&amp;Go<\/a>, we believe that full interoperability is the future. We call it the \u201csite digital twin\u201d.<\/p>\n<p>The concept of a site digital twin is the idea that there should be a real-time unique digital replica of everything that is on site from the infrastructure itself to people, materials and equipment, including their properties, states and additional information. That does not necessarily mean that information would be centralised in a unique database, but that there would be no duplication of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/product-data-tata-steel\/48899\/\">data<\/a> across platforms, alongside a real-time automatic update. The site digital twin would keep records of logs so that companies can gain insights on their operations and conduct predictive analysis through machine learning, allowing anticipation of potential conflicts or problems.<\/p>\n<p>As the physical and the digital job site should both be synchronised, there is a need for acquiring data of the real world whether it be by computer vision, smart sensors, speech recognition or digital platforms. It is necessary to constitute ecosystems in which companies have shared standards on how physical objects should be described. In addition, all players should provide open web services, preferably RESTful API. \u201cOpen\u201d does not inevitably mean public, nor unsecured, nor free; it only states that it allows accredited third parties to learn how they can integrate with the relevant system.<\/p>\n<p>Who owns what data, who should get rights over which set of data and for how much are the tough questions still unanswered, with plenty of models still to be explored.<\/p>\n<p>The road toward \u201csite digital twin\u201d remains fuzzy, though construction companies and tech specialists can pave the way together. Yes, it will be challenging, but we know that the eagerness for digital transformation in the industry will overcome the challenges.<\/p>\n<p><em>Please note: this is a commercial profile.<\/em><\/p>\n<p><strong>Francois Lebas\u00a0<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-48985 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-300x200.jpg\" alt=\"digital twin\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-300x200.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-768x512.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-1024x683.jpg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-696x464.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-1068x712.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-630x420.jpg 630w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg 1200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><strong>Business Designer<\/strong><\/p>\n<p><strong>Script&amp;Go<\/strong><\/p>\n<p>Tel: +33 2 30 96 20 69<\/p>\n<p><a href=\"mailto:francois.lebas@scriptandgo.com\">francois.lebas@scriptandgo.com<\/a><\/p>\n<p><a href=\"http:\/\/www.twitter.com\/ScriptandGo_EN\">www.twitter.com\/ScriptandGo_EN<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.<\/p>\n","protected":false},"author":18,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[428,5678,464,574,688,855],"stakeholder_rel_tag":[172514],"contributor_rel_tag":[],"class_list":{"0":"post-48982","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim","8":"tag-bim-today-december-2018","9":"tag-contributor-profile","10":"tag-data-management","11":"tag-digital-construction","12":"tag-sh-scriptgo","13":"stakeholder_rel_tag-script-and-go"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Site Digital Twin: Physical vs digital worksites<\/title>\n<meta name=\"description\" content=\"A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Site Digital Twin: Physical vs digital worksites\" \/>\n<meta property=\"og:description\" content=\"A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-11-12T14:57:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-11-12T15:07:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sally Eccleston\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\"},\"author\":{\"name\":\"Sally Eccleston\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e\"},\"headline\":\"Site Digital Twin: Physical vs digital worksites\",\"datePublished\":\"2018-11-12T14:57:31+00:00\",\"dateModified\":\"2018-11-12T15:07:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\"},\"wordCount\":516,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-300x200.jpg\",\"keywords\":[\"BIM\",\"BIM Today December 2018\",\"Contributor Profile\",\"Data Management\",\"Digital Construction\",\"sh Script&amp;Go\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#respond\"]}],\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\",\"name\":\"Site Digital Twin: Physical vs digital worksites\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-300x200.jpg\",\"datePublished\":\"2018-11-12T14:57:31+00:00\",\"dateModified\":\"2018-11-12T15:07:03+00:00\",\"description\":\"A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg\",\"width\":1200,\"height\":800,\"caption\":\"site digital twin\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Site Digital Twin: Physical vs digital worksites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e\",\"name\":\"Sally Eccleston\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g\",\"caption\":\"Sally Eccleston\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/sallyeccleston\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Site Digital Twin: Physical vs digital worksites","description":"A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/","og_locale":"en_US","og_type":"article","og_title":"Site Digital Twin: Physical vs digital worksites","og_description":"A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2018-11-12T14:57:31+00:00","article_modified_time":"2018-11-12T15:07:03+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg","type":"image\/jpeg"}],"author":"Sally Eccleston","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/"},"author":{"name":"Sally Eccleston","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e"},"headline":"Site Digital Twin: Physical vs digital worksites","datePublished":"2018-11-12T14:57:31+00:00","dateModified":"2018-11-12T15:07:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/"},"wordCount":516,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-300x200.jpg","keywords":["BIM","BIM Today December 2018","Contributor Profile","Data Management","Digital Construction","sh Script&amp;Go"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#respond"]}],"copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/","name":"Site Digital Twin: Physical vs digital worksites","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo-300x200.jpg","datePublished":"2018-11-12T14:57:31+00:00","dateModified":"2018-11-12T15:07:03+00:00","description":"A site digital twin could help to avoid duplication of data across platforms and ensure project information is up-to-date.","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2018\/11\/Francois-photo.jpg","width":1200,"height":800,"caption":"site digital twin"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/digital-twin-script-go\/48982\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Site Digital Twin: Physical vs digital worksites"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5f4ccf6acddfe485bec7556a9d49203e","name":"Sally Eccleston","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/529726b4f3deecd468a3918b549d084a26f0b578930ace4a43e3472ab4a3f150?s=96&d=mm&r=g","caption":"Sally Eccleston"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/sallyeccleston\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 08:42:58","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/48982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=48982"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/48982\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=48982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=48982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=48982"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=48982"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=48982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}