{"id":50793,"date":"2019-01-09T12:45:08","date_gmt":"2019-01-09T12:45:08","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=50793"},"modified":"2019-01-09T12:45:08","modified_gmt":"2019-01-09T12:45:08","slug":"underfloor-air-conditioning-upgrade-for-avaya","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/","title":{"rendered":"Underfloor Air Conditioning Upgrade for Avaya"},"content":{"rendered":"<h2>AET Flexible Space, leading provider of underfloor air conditioning systems has recently completed commissioning new equipment installed in the refurbished office buildings at the <a href=\"https:\/\/www.guildford-cathedral.org\/visit\/directions\">Cathedral Hill Campus, Guildford<\/a><\/h2>\n<p>The Campus, comprising three buildings, is now wholly owned by <a href=\"https:\/\/www.europacapital.com\/\">Europa Capital<\/a> and Edison Real Estate, who have fully refurbished the original buildings constructed in 2001.<\/p>\n<p>The equipment was supplied to end <a href=\"https:\/\/www.avaya.com\/en\/\">user occupier, Avaya<\/a>, who lease part of Building 1000 as their headquarters and commissioned a fit-out refurbishment of their space, including the Atrium area serviced by <a href=\"https:\/\/www.pbctoday.co.uk\/news\/stakeholders\/building-control-stakeholders\/advanced-ergonomic-technologies-ltd\/34015\/\">AET Flexible Space<\/a> underfloor air conditioning.<\/p>\n<p><a href=\"https:\/\/www.pbctoday.co.uk\/news\/energy-news\/underfloor-air-conditioning\/34951\/\">With underfloor systems<\/a>, the whole plenum under the building\u2019s raised access floor becomes the duct, or ventilation zone and each floor is divided into separate zones; ideal for multi-tenancy occupation or corporate division.<\/p>\n<p>Each of these zones is supplied with fully conditioned (chilled or warmed) air, which is fed into the plenum by the zonal downflow units (CAM), and then supplied into the workspace via Fan Terminal Units (Fantile). The Fantile units feature integrated controllers where users can personally adjust fan speed and temperature to suit their own comfort; which can have a positive impact on user well being.<\/p>\n<p>AET supplied 1 x CAM-C 15 and 1 x CAM-C25 downflow units and 25 TU4 Fantiles as the original equipment to Building 1000 Cathedral Hill in 2001.\u00a0 This was for the 286 m<sup>2<\/sup> Atrium area of the 1500 m<sup>2<\/sup> building; the occupier at the time was the serviced office specialist, Regus.<\/p>\n<p>The restricted floor to ceiling height of the main office space did not permit full building installation of underfloor air conditioning, but it was deemed appropriate to serve the Atrium area.<\/p>\n<p>The fit-out works for Avaya were carried out by main contractor, <a href=\"https:\/\/www.realysgroup.com\/en\">Realys<\/a>, and <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/ufac-services-upgrade\/50552\/\">AET worked<\/a> with M&amp;E contractor, AMD Environmental on the recent project.\u00a0 The 2017 upgrade was a near like for like replacement of the original equipment, 2 x CAM-C 25 downflow units, and new TU4 Fantiles with EC fan technology for enhanced energy savings.\u00a0 Additionally a new Flexgateway module was installed to interface communications with the main BMS.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[306],"tags":[566,429,714,831,774],"stakeholder_rel_tag":[172365],"contributor_rel_tag":[],"class_list":{"0":"post-50793","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-building-control-news","7":"tag-air-quality","8":"tag-building-control","9":"tag-heating","10":"tag-hvac","11":"tag-sh-advanced-ergonomic-technologies","12":"stakeholder_rel_tag-advanced-ergonomic-technologies"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Underfloor Air Conditioning Upgrade for Avaya<\/title>\n<meta name=\"description\" content=\"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Underfloor Air Conditioning Upgrade for Avaya\" \/>\n<meta property=\"og:description\" content=\"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-09T12:45:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/Avaya-AET-Flex-Space.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"978\" \/>\n\t<meta property=\"og:image:height\" content=\"531\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Underfloor Air Conditioning Upgrade for Avaya\" \/>\n<meta name=\"twitter:description\" content=\"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Underfloor Air Conditioning Upgrade for Avaya\",\"datePublished\":\"2019-01-09T12:45:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\"},\"wordCount\":339,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Air Quality\",\"Building Control\",\"Heating Systems\",\"HVAC\",\"SH Advanced Ergonomic Technologies\"],\"articleSection\":[\"Building Control News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\",\"name\":\"Underfloor Air Conditioning Upgrade for Avaya\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2019-01-09T12:45:08+00:00\",\"description\":\"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Underfloor Air Conditioning Upgrade for Avaya\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Underfloor Air Conditioning Upgrade for Avaya","description":"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/","og_locale":"en_US","og_type":"article","og_title":"Underfloor Air Conditioning Upgrade for Avaya","og_description":"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.","og_url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-01-09T12:45:08+00:00","og_image":[{"width":978,"height":531,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/Avaya-AET-Flex-Space.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_title":"Underfloor Air Conditioning Upgrade for Avaya","twitter_description":"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Underfloor Air Conditioning Upgrade for Avaya","datePublished":"2019-01-09T12:45:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/"},"wordCount":339,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Air Quality","Building Control","Heating Systems","HVAC","SH Advanced Ergonomic Technologies"],"articleSection":["Building Control News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/","url":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/","name":"Underfloor Air Conditioning Upgrade for Avaya","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2019-01-09T12:45:08+00:00","description":"AET Flexible Space has completed commissioning new equipment installed in the refurbished office buildings at the Cathedral Hill Campus, Guildford.","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/underfloor-air-conditioning-upgrade-for-avaya\/50793\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Underfloor Air Conditioning Upgrade for Avaya"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-25 06:52:20","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/50793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=50793"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/50793\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=50793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=50793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=50793"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=50793"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=50793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}