{"id":51419,"date":"2019-01-23T08:57:16","date_gmt":"2019-01-23T08:57:16","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=51419"},"modified":"2019-01-23T08:57:16","modified_gmt":"2019-01-23T08:57:16","slug":"mick-george-ltd-land-northstowe-education-campus-package","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/","title":{"rendered":"Mick George Ltd land Northstowe education campus package"},"content":{"rendered":"<h2>Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe<\/h2>\n<p>Local construction specialist, Mick George Ltd will imminently begin Earthworks on behalf of Acrabuild (Anglia) UK, on phase one of the Northstowe Education Campus build, located on the former RAF Oakington base to the northwest edge of Cambridge.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-51422 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg\" alt=\"Mick George Earthworks\" width=\"329\" height=\"219\" \/>The first phase of the campus, which will cost around \u00a345m, includes a secondary school, a multipurpose school hall \/ theatre space and drama studios, a sports hall large enough for four tennis courts, a gym, two dance studios, an all-weather floodlit football pitch and a 110-place Special Education Needs (SEN) school.<\/p>\n<p>Once complete, also present will be a 400-place sixth form college co-located with the secondary school, a primary school and a nursery, an eight-court indoor sports hall, gymnasium, caf\u00e9, fitness studios and outdoor community sports facilities.<\/p>\n<p>The secondary school, planned to open in September 2019, will be run by Cambridge Meridian Academies Trust (CMAT) and will provide places for up to 600 pupils aged 11-16. It will then be extended in two subsequent phases to 1,200 and finally 1,800 pupils.<\/p>\n<p>The timing of these phases will be dependent upon the pace of housing development and demand for places from families moving into the catchment area. This sustainable new development will host up to 10,000 new homes and an anticipated population of around 24,400 people.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-51423 alignleft\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/Northstowe-Education-Campus.jpg\" alt=\"Northstowe Education Campus\" width=\"300\" height=\"168\" \/>The school will be the seventh secondary school to join CMAT and will work closely with CMAT\u2019s other schools across Cambridgeshire and surrounding areas, including Swavesey Village College, which has been rated \u2018Outstanding\u2019 by Ofsted since 2011.<\/p>\n<p>Michael George, Managing Director at Mick George Ltd commented: \u2018\u2019Working on education facilities comes with its challenges. The fact that our services have been utilised so frequently on some of the most high-profile builds in that sector throughout our operating regions is a testament to the high level of quality and detail we assign to all of our contracts. This is yet another exciting scheme that we\u2019re pleased to be involved with.\u2019\u2019<\/p>\n<p>&nbsp;<\/p>\n<p>For further information, please visit:\u00a0<a href=\"http:\/\/www.mickgeorge.co.uk\/\">www.mickgeorge.co.uk<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[676,997,172717,700],"stakeholder_rel_tag":[172483],"contributor_rel_tag":[],"class_list":{"0":"post-51419","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-construction","8":"tag-development","9":"tag-planning-construction-insight","10":"tag-sh-mick-george","11":"stakeholder_rel_tag-mick-george"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mick George Ltd land Northstowe Education Campus package<\/title>\n<meta name=\"description\" content=\"Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mick George Ltd land Northstowe education campus package\" \/>\n<meta property=\"og:description\" content=\"Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-23T08:57:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/06\/Mick-George.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"171\" \/>\n\t<meta property=\"og:image:height\" content=\"70\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nick Wilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\"},\"author\":{\"name\":\"Nick Wilde\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\"},\"headline\":\"Mick George Ltd land Northstowe education campus package\",\"datePublished\":\"2019-01-23T08:57:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\"},\"wordCount\":355,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg\",\"keywords\":[\"Construction Processes\",\"Development\",\"Planning &amp; Construction Insight\",\"SH Mick George\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\",\"name\":\"Mick George Ltd land Northstowe Education Campus package\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg\",\"datePublished\":\"2019-01-23T08:57:16+00:00\",\"description\":\"Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg\",\"width\":400,\"height\":267,\"caption\":\"Mick George Earthworks\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mick George Ltd land Northstowe education campus package\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715\",\"name\":\"Nick Wilde\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g\",\"caption\":\"Nick Wilde\"},\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mick George Ltd land Northstowe Education Campus package","description":"Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/","og_locale":"en_US","og_type":"article","og_title":"Mick George Ltd land Northstowe education campus package","og_description":"Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-01-23T08:57:16+00:00","og_image":[{"width":171,"height":70,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2017\/06\/Mick-George.jpg","type":"image\/jpeg"}],"author":"Nick Wilde","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/"},"author":{"name":"Nick Wilde","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715"},"headline":"Mick George Ltd land Northstowe education campus package","datePublished":"2019-01-23T08:57:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/"},"wordCount":355,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg","keywords":["Construction Processes","Development","Planning &amp; Construction Insight","SH Mick George"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/","name":"Mick George Ltd land Northstowe Education Campus package","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg","datePublished":"2019-01-23T08:57:16+00:00","description":"Having gained approval in Q4 2018, development is now underway on the creation of Cambridgeshire\u2019s largest education campus at Northstowe.","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/01\/1-e1548233756686.jpg","width":400,"height":267,"caption":"Mick George Earthworks"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/mick-george-ltd-land-northstowe-education-campus-package\/51419\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Mick George Ltd land Northstowe education campus package"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/5913a95b7386193820910bf11498d715","name":"Nick Wilde","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/08769a7f0e8117061c99052ab1753daf3d222e7741c073d814b6838e02c625e4?s=96&d=mm&r=g","caption":"Nick Wilde"},"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/nick-wilde\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-16 18:02:47","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/51419","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=51419"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/51419\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=51419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=51419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=51419"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=51419"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=51419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}