{"id":55968,"date":"2019-04-25T10:24:31","date_gmt":"2019-04-25T09:24:31","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=55968"},"modified":"2019-04-25T10:24:31","modified_gmt":"2019-04-25T09:24:31","slug":"britlift-equipment-lifts-heat-exchanger","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/","title":{"rendered":"Britlift equipment lifts 37-tonne heat exchanger"},"content":{"rendered":"<h2><a href=\"https:\/\/www.britlift.com\/\">Britlift<\/a> recently worked night and day to supply custom-designed lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger<\/h2>\n<p>Britlift recently supplied a variety of custom designed and manufactured lifting beams, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/special-reports\/spreader-beam-misuse\/51609\/\">spreader beams<\/a> and lifting lugs to safely lift two 37-tonne heat exchangers at a salt production plant in Middlewich.<\/p>\n<p>As part of its ongoing asset management plan to replace end-of-life equipment, British Salt (Tata Chemicals Europe) has replaced one of the six heat exchangers used in the evaporation stage of the salt production process. The heat exchanger replaced had been in operation for more than 30 years and was integrated into the existing plant.<\/p>\n<p>Initially working closely with heat transfer process specialist <a href=\"http:\/\/www.graham-hart.com\/index.php\">Graham Hart Process<\/a>.<\/p>\n<p>Technology, Britlift engineers were invited to attend the site of the lift to better understand the environment, the load being lifted and look for ways in which the lifting system design could accomplish the removal of the old, and installation of the new, exchanger.<\/p>\n<p>It quickly became apparent that the operation would not be a simple one \u2013 the old exchanger first needed to be removed from the building, but at close to seven metres in height, it first needed to be lifted and turned on to its side to fit through the door. As such, there were three different lifting operations \u2013 lifting the exchanger when horizontal, the top and tailing lift and lifting the exchanger when vertical. To compound the difficulty of the operation, the exchangers were not fitted with lifting points or trunnions and turnaround of design, manufacture, test and supply was just four weeks.<\/p>\n<h3>Lifting equipment engineering challenges<\/h3>\n<p>The key challenge during the early phase of the project was the design of a set of bolt-on lifting lugs that could be bolted to the top and bottom flanges of the exchanger to allow them to be lifted. The lugs themselves would obviously need to be designed to withstand the forces from the weight of the exchanger, but how the lugs transferred forces into the exchanger was critically important as damage to the new exchanger would be disastrous.<\/p>\n<p>Using FEA (finite element analysis) software, Britlift completed the design of the lugs, ensuring that damage to the new exchanger would be avoided.<\/p>\n<p>In order to achieve the incredibly short lead time, Britlift worked around the clock to complete design and manufacture within schedule. Within this time period, Britlift again attended site to survey the old exchanger. Of key importance was that the l<a href=\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-lifting-equipment\/50928\/\">ifting equipment<\/a> fitted both the old and new exchangers. Due to the tolerances and age of the old exchanger, precise measurements and an accurate fabrication for the lifting equipment was required.<\/p>\n<h3>40-tonne lifting solution<\/h3>\n<p>Britlift designed and manufactured one 40-tonne, 2,400mm lifting beam (central top direct to hook lifting point), one 25-tonne, 2,400mm tailing beam (for moving the heat exchanger from vertical to horizontal), one 50-tonne, 7,000mm <a href=\"https:\/\/www.pbctoday.co.uk\/news\/special-reports\/britlift-lifting-modular-homes\/53219\/\">modular spreader beam<\/a> (for lifting once horizontal) and four bespoke bolt-on lifting lugs specifically designed and machined to suit the specific dimensions of the heat exchangers. Also supplied by Britlift was a set of detailed user instructions, rigging design and drawings, four off 17.5-tonne and two off 22.5-tonne polyester round slings, a 42-tonne, two-leg wire rope sling and nine varying sizes of Green Pin shackles.<\/p>\n<p>Britlift is a leading designer and manufacturer of custom lifting beams, lifting frames and spreader beams up to 250 tonnes, as well as offering off-shelf modular spreader beams at 4, 8, 13, 24, 34, 50 and 70 tonnes. <a href=\"https:\/\/www.britlift.com\/\">www.britlift.com<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Liam Botting\u00a0\u00a0<\/strong><\/p>\n<p>Managing Director<\/p>\n<p><strong><a href=\"https:\/\/www.britlift.com\/\">Britlift<\/a><\/strong><\/p>\n<p>Tel: 01305 236123<\/p>\n<p><a href=\"mailto:liam@britlift.com\">liam@britlift.com<\/a><\/p>\n<p>LinkenIn: <a href=\"https:\/\/www.linkedin.com\/company\/britlift\/\">Britlift<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><em>*Please note: this is a commercial profile.<\/em><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Britlift recently worked night and day to supply custom-designed lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[308],"tags":[689,676,583,464,627,22154,13039],"stakeholder_rel_tag":[172396],"contributor_rel_tag":[],"class_list":{"0":"post-55968","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-plant-equipment-supplies-news","7":"tag-equipment","8":"tag-construction","9":"tag-construction-products","10":"tag-contributor-profile","11":"tag-modular-construction","12":"tag-pbc-today-may-2019","13":"tag-sh-britlift","14":"stakeholder_rel_tag-britlift"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Britlift equipment lifts 37-tonne heat exchanger<\/title>\n<meta name=\"description\" content=\"Britlift recently worked night and day to supply lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Britlift equipment lifts 37-tonne heat exchanger\" \/>\n<meta property=\"og:description\" content=\"Britlift recently worked night and day to supply lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-04-25T09:24:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/04\/TATA-Chemicals-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Britlift equipment lifts 37-tonne heat exchanger\",\"datePublished\":\"2019-04-25T09:24:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\"},\"wordCount\":603,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Construction Equipment\",\"Construction Processes\",\"Construction Products\",\"Contributor Profile\",\"Modular Construction\",\"PBC Today May 2019\",\"SH Britlift\"],\"articleSection\":[\"Plant, Equipment &amp; Supplies News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\",\"name\":\"Britlift equipment lifts 37-tonne heat exchanger\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2019-04-25T09:24:31+00:00\",\"description\":\"Britlift recently worked night and day to supply lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Britlift equipment lifts 37-tonne heat exchanger\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Britlift equipment lifts 37-tonne heat exchanger","description":"Britlift recently worked night and day to supply lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/","og_locale":"en_US","og_type":"article","og_title":"Britlift equipment lifts 37-tonne heat exchanger","og_description":"Britlift recently worked night and day to supply lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger","og_url":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-04-25T09:24:31+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/04\/TATA-Chemicals-1.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Britlift equipment lifts 37-tonne heat exchanger","datePublished":"2019-04-25T09:24:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/"},"wordCount":603,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Construction Equipment","Construction Processes","Construction Products","Contributor Profile","Modular Construction","PBC Today May 2019","SH Britlift"],"articleSection":["Plant, Equipment &amp; Supplies News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/","url":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/","name":"Britlift equipment lifts 37-tonne heat exchanger","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2019-04-25T09:24:31+00:00","description":"Britlift recently worked night and day to supply lifting equipment on an incredibly tight timescale for the removal of a 37-tonne heat exchanger","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/plant-equipment-supplies-news\/britlift-equipment-lifts-heat-exchanger\/55968\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Britlift equipment lifts 37-tonne heat exchanger"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-02 18:24:01","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/55968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=55968"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/55968\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=55968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=55968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=55968"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=55968"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=55968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}