{"id":55984,"date":"2019-05-24T09:14:40","date_gmt":"2019-05-24T08:14:40","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=55984"},"modified":"2022-10-19T14:49:45","modified_gmt":"2022-10-19T13:49:45","slug":"hurley-palmer-digital-makeover","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/","title":{"rendered":"Hurley Palmer Flatt gives Principal Place a digital makeover"},"content":{"rendered":"<h2>Building one of the tallest structures in London with Hurley Palmer Flatt and Bluebeam Revu<\/h2>\n<p>UK-based multi-disciplinary engineering firm <a href=\"https:\/\/www.hurleypalmerflatt.com\/\">Hurley Palmer Flatt<\/a> understands the importance of efficient project delivery, as 2018 marks the firm\u2019s fifth decade in the built environment business.<\/p>\n<p>Recently, the firm implemented <a href=\"https:\/\/www.bluebeam.com\/uk\/trials\/?src=71006&amp;ds_rl=1239086&amp;gclid=CjwKCAjwtYXmBRAOEiwAYsyl3OKHratAM-EKbDuO_arlgB7zXtnZC7qIP7i6V_pOL7NZ9jAt9kzjWBoC24kQAvD_BwE&amp;gclsrc=aw.ds\">Bluebeam Revu<\/a>, the project efficiency and collaboration solution trusted by over 1.4m design and construction professionals worldwide on Principal Place, a residential high-rise project in the Shoreditch area of London, expected to reach 50 storeys.<\/p>\n<p>Modern in build and execution, the project is set to feature 175-metre tall towers offering 300 new residential apartments, a residential campus-structured IP integrated cabling solution, audio visual home automation systems, site-wide security coverage, centralised building services, active network supporting MEP BMS AV and security systems, satellite distribution, as well as telecom utilities planning and coordination.<\/p>\n<p>Given the complexity of the project, Hurley Palmer Flatt turned to Revu to enhance the accuracy and quality of their design reviews, compliance documentation and collaboration, while eliminating time-sensitive processes involving DWG files and costly CAD programs.<\/p>\n<h3>Improving efficiency in design review<\/h3>\n<p>\u201cWhat ultimately happened with the introduction and quality of Bluebeam is that we were able to get a suite of drawings out and not have to run them by 2D CAD,\u201d explains senior mechanical engineer, Jairo Jaramillo.<\/p>\n<p>\u201cThat saved us using two or three staff members, a couple of hours each. The savings there was definitely in the four figures.\u201d<\/p>\n<p>Sustainability consultant Lucy Rees also sees the improvements brought on by Revu: \u201cIt\u2019s particularly useful, during the design stage where we can just annotate documents digitally on a PDF and send it to the architects and engineers, instead of having to print things out and then scan them back in and send them over.\u201d<\/p>\n<p>Bluebeam Studio in Revu allows Jaramillo\u2019s team to mark-up 2D drawings as well as 3D models and share the mark-ups in real-time to both the field and office via digital PDFs.<\/p>\n<p>\u201cBluebeam has reduced the number of steps and been a massive help with regards to productivity,\u201d adds Jaramillo.<\/p>\n<h3>Striving for accuracy<\/h3>\n<p>The easy-to-adopt and scale functionality and industry-specific tools in Revu have allowed Jaramillo to expand the use of Revu\u2019s digital solutions to other business critical workflows.<\/p>\n<p>\u201cOur key thing is spatial coordination. So, to be able to do that off a 2D drawing in Bluebeam and complete area calculations; see metres squared, distances, clearances to plant, etc. That is the bread and butter of what we do. And I wasn\u2019t able to do that until I started using Bluebeam. I no longer need to go to DWGs because with Bluebeam, I can check and calibrate the distances,\u201d he says.<\/p>\n<p>Compliance reviews have also seen an upgrade since the firm adopted Revu.<\/p>\n<p>\u201cBluebeam is particularly useful for us when we\u2019re taking pictures to document compliance, because we can then embed them against the plans and schedules for the project, which means we have a direct link between what we\u2019ve physically seen on-site and what\u2019s in the design plans, to guarantee compliance,\u201d explains Rees.<\/p>\n<p>In addition to that direct link, all document information is now in Revu, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bluebeam-release-redesigned-revu-2018\/40273\/\">making information easier<\/a> to find than previous multi-document formats.<\/p>\n<p>\u201cInstead of having to have lots of different documents in different places, we just have it in the one that you can see together,\u201d says Rees.<\/p>\n<h3>Taking digital PDFs into a paperless future<\/h3>\n<p>Hurley Palmer Flatt attributes the digital PDF capabilities of Revu as the key to going paperless. CEO Paul Flatt believes that the future is now for firms like his to take advantage of the digital space: \u201cBuildings have become a digital asset. So, with the evolution of Building Information Modelling (BIM), this digital asset is going to evolve, and I believe that next destination of that digital asset is where you\u2019ll start to see an overlay of information that actually goes onto that digital asset; that\u2019s tagging of information.\u201d<\/p>\n<p>After using Revu to do just that on the Principal Place project, Jaramillo agrees: \u201cPDF is such a recognisable and common format of electronic file. Having the versatility of digital PDFs within Revu has helped Hurley Palmer Flatt to achieve their goals in improving the quality and efficiency of project deliverables.<\/p>\n<p>\u201cAt the end of the day, the deliverables that you\u2019re dealing with have to be designed and to do that, you need design tools, elaborates Flatt. Having tools like Bluebeam, they\u2019re key if we\u2019re going to move forward.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>Read the full <a href=\"https:\/\/www.bluebeam.com\/uk\/solutions\/customers\/hurley-palmer-flatt\">Hurley Palmer Flatt case study<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Bluebeam Revu<\/strong><\/p>\n<p><a href=\"https:\/\/www.bluebeam.com\/uk\/\">www.bluebeam.co.uk<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><em>*Please note: this is a commercial profile.<\/em><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Modern in build and execution, the project is set to feature 175-metre tall towers offering 300 new residential apartments.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[724,428,576,27703,277,676,856,464,22154,848],"stakeholder_rel_tag":[172393],"contributor_rel_tag":[],"class_list":{"0":"post-55984","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-asset-management","8":"tag-bim","9":"tag-bim-software","10":"tag-bim-today-june-2019","11":"tag-built-environment","12":"tag-construction","13":"tag-construction-technology","14":"tag-contributor-profile","15":"tag-pbc-today-may-2019","16":"tag-sh-bluebeam","17":"stakeholder_rel_tag-bluebeam"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hurley Palmer Flatt gives Principal Place a digital makeover<\/title>\n<meta name=\"description\" content=\"Modern in build and execution, the Hurley Palmer Flatt project is set to feature 175-metre tall towers offering 300 new residential apartments\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hurley Palmer Flatt gives Principal Place a digital makeover\" \/>\n<meta property=\"og:description\" content=\"Modern in build and execution, the Hurley Palmer Flatt project is set to feature 175-metre tall towers offering 300 new residential apartments\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-05-24T08:14:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-19T13:49:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/04\/BekkyLonsdale-96.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"857\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Hurley Palmer Flatt gives Principal Place a digital makeover\",\"datePublished\":\"2019-05-24T08:14:40+00:00\",\"dateModified\":\"2022-10-19T13:49:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\"},\"wordCount\":782,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Asset Management\",\"BIM\",\"BIM Software\",\"BIM Today June 2019\",\"Built Environment\",\"Construction Processes\",\"Construction Technology\",\"Contributor Profile\",\"PBC Today May 2019\",\"SH Bluebeam\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\",\"name\":\"Hurley Palmer Flatt gives Principal Place a digital makeover\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2019-05-24T08:14:40+00:00\",\"dateModified\":\"2022-10-19T13:49:45+00:00\",\"description\":\"Modern in build and execution, the Hurley Palmer Flatt project is set to feature 175-metre tall towers offering 300 new residential apartments\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hurley Palmer Flatt gives Principal Place a digital makeover\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hurley Palmer Flatt gives Principal Place a digital makeover","description":"Modern in build and execution, the Hurley Palmer Flatt project is set to feature 175-metre tall towers offering 300 new residential apartments","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/","og_locale":"en_US","og_type":"article","og_title":"Hurley Palmer Flatt gives Principal Place a digital makeover","og_description":"Modern in build and execution, the Hurley Palmer Flatt project is set to feature 175-metre tall towers offering 300 new residential apartments","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-05-24T08:14:40+00:00","article_modified_time":"2022-10-19T13:49:45+00:00","og_image":[{"width":1200,"height":857,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/04\/BekkyLonsdale-96.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Hurley Palmer Flatt gives Principal Place a digital makeover","datePublished":"2019-05-24T08:14:40+00:00","dateModified":"2022-10-19T13:49:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/"},"wordCount":782,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Asset Management","BIM","BIM Software","BIM Today June 2019","Built Environment","Construction Processes","Construction Technology","Contributor Profile","PBC Today May 2019","SH Bluebeam"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/","name":"Hurley Palmer Flatt gives Principal Place a digital makeover","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2019-05-24T08:14:40+00:00","dateModified":"2022-10-19T13:49:45+00:00","description":"Modern in build and execution, the Hurley Palmer Flatt project is set to feature 175-metre tall towers offering 300 new residential apartments","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/hurley-palmer-digital-makeover\/55984\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Hurley Palmer Flatt gives Principal Place a digital makeover"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 06:30:42","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/55984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=55984"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/55984\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=55984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=55984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=55984"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=55984"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=55984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}