{"id":58268,"date":"2019-06-07T14:02:02","date_gmt":"2019-06-07T13:02:02","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=58268"},"modified":"2019-06-07T14:02:02","modified_gmt":"2019-06-07T13:02:02","slug":"bim-process-copenhagen-airport","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/","title":{"rendered":"BIM process takes off at Copenhagen Airport"},"content":{"rendered":"<h2>Copenhagen Airport created BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit, Bentley\u2019s Chintana Herrin takes a look<\/h2>\n<p><a href=\"https:\/\/www.cph.dk\/en\">Copenhagen Airport<\/a> wanted to implement Building Information Modelling (BIM) processes on its upcoming projects to prove that utilising <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/topcon-magnet-collage-web\/57368\/\">BIM methodologies<\/a> would be a beneficial investment. Most of the airport\u2019s projects are the operation, maintenance and refurbishment of existing buildings, but the airport still wanted to see the benefits of BIM workflows.<\/p>\n<p>The DKK 10m (\u00a31.1m) initiative included producing information-rich 3D models of the facilities based on a combination of 2D drawings, surveys and field inspections. The project also called for creating BIM process standards, including specification of a level of detail (LOD) for new building projects.<\/p>\n<h3>Implementing a BIM process<\/h3>\n<p>The project team wanted to prove that using BIM processes throughout the project would benefit the building owner by saving costs. According to a 2012 report from the <a href=\"https:\/\/www.dtu.dk\/english\">Danish Technical University<\/a>, building owners who implemented a BIM process achieved a cost savings of approximately 12%. To prove that they could also achieve savings, team members set a goal to save at least 4% of the entire project\u2019s budget, as their BIM processes would not be as mature as others in the study.<\/p>\n<p>The main challenge for the Copenhagen Airport project team was that BIM processes in Denmark were not well established. To overcome this challenge, the organisation collaborated with different companies to hear other views on the best way to implement BIM methodologies. By speaking with these different organisations, the project team produced a standard for future BIM process creation that would help them and other Danish organisations prepare for and benefit from BIM adoption.<\/p>\n<h3>Setting standards<\/h3>\n<p>To create an effective model, Copenhagen Airport looked at existing LOD definitions to create their models, making sure to include the right amount of information to benefit both operators and consultants. Many of the existing definitions lacked the idea that much information can be obtained with data on less detailed objects. The project team decided to include graphical and non-graphical information in the definitions, with more non-graphical information than seen in other standards.<\/p>\n<p>The team created a 3D model that included the important information from the 2D drawings, which they used as a baseline. Engineers also visited the sites and added any 2D information that was missed or incorrect. The team adopted their new BIM processes on this model, including the parameters on all surveyed objects. Additionally, all project participants were taught how to accurately use the model to gather information.<\/p>\n<h3>Saving time and improving collaboration<\/h3>\n<p>By using <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bentley-systems-growth\/56997\/\">Bentley applications<\/a> to help create a 3D model and an innovative BIM process, Copenhagen Airport\u2019s project team saw significant time savings. The team quickly extracted heights with MicroStation\u2019s ability to handle large point clouds, even when the surveyor was not present on the construction site. Users also joined IFC and DGN files, which helped execute the project faster because all the original 2D drawings were in DGN format. Furthermore, there was greater quality control over the information because the 2D data was included in the 3D models.<\/p>\n<p>The team used ProjectWise to house all relevant information, including the 2D data, which helped users easily find information. Previously, team members would have spent unnecessary time searching through thousands of documents.<\/p>\n<p>Bentley applications also helped improve collaboration with stakeholders, creating a web platform to exchange information and invite external people to participate in collision and consistency control. With weekly updates, everyone involved in the project knew what was happening and could easily access the necessary information. Bentley\u2019s applications made it easy to manage contributions from all involved parties while still working to coordinate systems issues.<\/p>\n<h3>Realising benefits, preparing for future projects<\/h3>\n<p>By incorporating BIM processes for all projects at Copenhagen Airport, the project team used the model to extract quantities for the contractors, which reduced the risk, and thereby the bidding.<\/p>\n<p>Together with detecting and correcting unhandled collisions before completion, the team could calculate the benefits. The organisation calculated the difference between using the BIM process and not, and realised a benefit of 4.46% cost savings \u2013 beating its target of 4%. This proved the effectiveness of a BIM process and provided a mandate to continue using the process for all projects.<\/p>\n<p>The surrounding community will also see the benefits of Copenhagen Airport\u2019s project, providing insight into how Denmark might use BIM processes for future endeavours \u2013 especially since Copenhagen Airport is one of the largest building sites in Denmark. Therefore, if the airport could realise major benefits, then other organisations would realise the benefits as well.<\/p>\n<p>The airport set a goal in actively contributing to helping other large building owners mature their BIM processes and increase their level of implementation.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Chintana Herrin<\/strong><\/p>\n<p>Reality Modelling Product Marketing Manager<\/p>\n<p>Bentley Systems<\/p>\n<p>Tel: +44 207 861 0900<\/p>\n<p><a href=\"http:\/\/www.bentley.com\">www.bentley.com<\/a><\/p>\n<p>Twitter: <a href=\"https:\/\/twitter.com\/BentleySystems\">BentleySystems<\/a><\/p>\n<p>LinkedIn: <a href=\"https:\/\/www.linkedin.com\/company\/bentley-systems\/\">bentley-systems<\/a><\/p>\n<p>Facebook: <a href=\"https:\/\/www.facebook.com\/BentleySystems\">BentleySystems<\/a><\/p>\n<p>YouTube: <a href=\"https:\/\/www.youtube.com\/BentleySystems\">BentleySystems<\/a><\/p>\n<p>Instagram: <a href=\"https:\/\/www.instagram.com\/bentleysystems\/\">bentleysystems<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[862,428,576,27703,13038,943],"stakeholder_rel_tag":[172387],"contributor_rel_tag":[],"class_list":{"0":"post-58268","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-3d-printing","8":"tag-bim","9":"tag-bim-software","10":"tag-bim-today-june-2019","11":"tag-building","12":"tag-sh-bentley-systems","13":"stakeholder_rel_tag-bentley-systems"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>BIM process takes off at Copenhagen Airport<\/title>\n<meta name=\"description\" content=\"Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM process takes off at Copenhagen Airport\" \/>\n<meta property=\"og:description\" content=\"Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-07T13:02:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/06\/dreamstime_xxl_41089004.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1328\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"BIM process takes off at Copenhagen Airport\",\"datePublished\":\"2019-06-07T13:02:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\"},\"wordCount\":824,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"3D Printing\",\"BIM\",\"BIM Software\",\"BIM Today June 2019\",\"Building\",\"SH Bentley Systems\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\",\"name\":\"BIM process takes off at Copenhagen Airport\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2019-06-07T13:02:02+00:00\",\"description\":\"Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM process takes off at Copenhagen Airport\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"BIM process takes off at Copenhagen Airport","description":"Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/","og_locale":"en_US","og_type":"article","og_title":"BIM process takes off at Copenhagen Airport","og_description":"Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-06-07T13:02:02+00:00","og_image":[{"width":2000,"height":1328,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/06\/dreamstime_xxl_41089004.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"BIM process takes off at Copenhagen Airport","datePublished":"2019-06-07T13:02:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/"},"wordCount":824,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["3D Printing","BIM","BIM Software","BIM Today June 2019","Building","SH Bentley Systems"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/","name":"BIM process takes off at Copenhagen Airport","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2019-06-07T13:02:02+00:00","description":"Copenhagen Airport: BIM process standards for existing building projects, beating its savings target and opening the door for other organisations to benefit","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-process-copenhagen-airport\/58268\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"BIM process takes off at Copenhagen Airport"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-23 00:06:57","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/58268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=58268"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/58268\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=58268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=58268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=58268"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=58268"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=58268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}