{"id":60344,"date":"2020-07-22T10:40:39","date_gmt":"2020-07-22T09:40:39","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=60344"},"modified":"2020-07-22T12:44:21","modified_gmt":"2020-07-22T11:44:21","slug":"outside-modular-construction","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/","title":{"rendered":"Thinking outside the offsite construction box"},"content":{"rendered":"<h1>Modular construction is getting a lot of attention for the undoubted benefits it offers but it is only one of many offsite solutions, like timber frame, that have their own unique advantages, says Malcolm Thomson, sales director at <a href=\"https:\/\/www.scotframe.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Scotframe<\/a><\/h1>\n<p>With the UK and Scottish governments keen to tackle the housing crisis \u2013 and setting stretch targets for the number of new homes \u2013 institutional investors have pricked up their ears to the potential earnings from <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/timber-frame-housing-crisis\/56306\/\" target=\"_blank\" rel=\"noopener noreferrer\">offsite construction<\/a>.<\/p>\n<p>Currently touted as the \u2018wunderkind\u2019 of offsite construction is modular \u2013 or if you are of a certain vintage \u2013 an updated prefab for the 21<sup>st<\/sup> century. Whichever term you prefer, modular construction means three-dimensional homes built in a factory and shipped to the site almost fully made. Assembling involves fitting the modules together, connecting services and adding the finishing touches.<\/p>\n<p>Several financial investments have accelerated the buzz about modular. In April Goldman Sachs dropped a cool <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/goldman-sachs-invests-75m-in-tophat\/55462\/\" target=\"_blank\" rel=\"noopener noreferrer\">\u00a375m into a UK modular housing manufacturer TopHat<\/a>.\u00a0 Then Japanese housebuilding giant Sekisui House took a 35% stake in Manchester-based Urban Splash.\u00a0 Most recently Places for People confirmed the purchase of 750 modular units from Ilke Homes, with financial backing from Homes England.<\/p>\n<p>However, while the buzz is getting louder, it\u2019s worth bearing in mind that the current capacity of the industry is tiny \u2013 around 8,000-10,000 homes, with fewer, actually delivered. Modern methods of construction as a whole, according to the National Homes Building Council, accounts for 15-20% of new-build homes, while modular itself probably accounts for less than 5%.<\/p>\n<h3>Timber frame solutions<\/h3>\n<p>There is no doubt that offsite construction is a game-changer when it comes to tackling the housing shortage, not least because of the well-documented skills shortage in the sector. However, while modular has many positives \u2013 it\u2019s quick, easy to assemble, more energy-efficient and less reliant on good weather than traditional brick or block construction \u2013 we need to be mindful that modular will only ever be part of the solution to the housing shortage. There\u2019s another offsite solution that offers even more benefits \u2013 timber frame construction.<\/p>\n<p>Scotland leads the way in this construction model, with 83% of new-build Scottish homes using timber frame, compared to just 23% in England. This is partially explained by the impressive thermal performance of timber-built houses given Scotland\u2019s climate. Timber is also a particularly attractive option for self-build, which has always played a larger role in Scotland.<\/p>\n<p>According to the <a href=\"https:\/\/www.structuraltimber.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Structural Timber Association<\/a>, the market share for timber construction is rising steadily, aided by technologies such as cross-laminated timber and insulated panel systems like those used by Scotframe in our self-build homes.<\/p>\n<p>Indisputably, offsite-manufactured timber structures have low operational and maintenance costs and achieve high-performance standards. And taking a <a href=\"https:\/\/www.pbctoday.co.uk\/news\/guides-reviews\/offsite-timber-frame\/58151\/\" target=\"_blank\" rel=\"noopener noreferrer\">&#8216;fabric first&#8217; approach<\/a> \u2013 where energy-efficient properties are built into a building&#8217;s exterior &#8216;envelope&#8217; rather than relying on add-on&#8217;s such as photo-voltaic panels or smart home gadgets \u2013 can significantly improve a building\u2019s sustainability credentials; \u00a0an overall energy reduction of up to 33% over a building\u2019s lifetime.<\/p>\n<p>Cost savings are an important factor too. A timber frame solution can often be cheaper in many instances, and that\u2019s before you factor in the significantly shorter build time.<\/p>\n<p>Timber frame also wins over modular when it comes to aesthetics. Modular, by its very nature, has to fit together in a pre-ordained way \u2013 the properties all look the same.\u00a0 Timber frame properties can be constructed to specific designs and have high kerb appeal.\u00a0 And this also applies to large, custom-build projects where the requirement is for numerous or bespoke house types.<\/p>\n<p>So while modular will certainly play a part in helping the industry deliver more homes, it is only one of many offsite solutions. While it works for short-term homes in popular city areas, the need for something more personal will usually prevail with most buyers.<\/p>\n<p>So my message to my colleagues working in the house building sector is this:\u00a0 by all means consider modular homes as part of your offsite construction strategy. But think timber frame too, as it offers a much more attractive, versatile and cost-effective package of benefits for your future house buyers.<\/p>\n<p>&nbsp;<\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-60345 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--275x300.jpg\" alt=\"offsite construction, timber frame, \" width=\"275\" height=\"300\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--275x300.jpg 275w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--768x837.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--940x1024.jpg 940w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--696x758.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--385x420.jpg 385w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box-.jpg 1049w\" sizes=\"auto, (max-width: 275px) 100vw, 275px\" \/>Malcolm Thomson<\/strong><\/p>\n<p>Sales director<\/p>\n<p>Scotframe<\/p>\n<p><a href=\"http:\/\/www.scotframe.co.uk\" target=\"_blank\" rel=\"noopener noreferrer\">www.scotframe.co.uk<\/a><\/p>\n<p>Twitter: <a href=\"https:\/\/twitter.com\/scotframe\" target=\"_blank\" rel=\"noopener noreferrer\">@scotframe<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Modular construction is getting a lot of attention for the undoubted benefits it offers but it is only one of many offsite solutions, like timber frame, that have their own unique advantages, says Malcolm Thomson, sales director at Scotframe.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[464,430,572,916,627,696,61643,805,660,915],"stakeholder_rel_tag":[172513],"contributor_rel_tag":[],"class_list":{"0":"post-60344","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-contributor-profile","8":"tag-energy-efficiency","9":"tag-housebuilding","10":"tag-modern-methods-of-construction","11":"tag-modular-construction","12":"tag-offsite-construction","13":"tag-pbc-today-august-2020","14":"tag-sh-scotframe","15":"tag-skills-shortage","16":"tag-timber","17":"stakeholder_rel_tag-scotframe"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Thinking outside the offsite construction box<\/title>\n<meta name=\"description\" content=\"Modular construction is getting a lot of attention for the undoubted benefits it offers but it is only one of many offsite solutions, like timber frame\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Thinking outside the modular construction box\" \/>\n<meta property=\"og:description\" content=\"With the UK and Scottish governments keen to tackle the housing crisis, institutional investors have pricked up their ears to the potential earnings from offsite construction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-22T09:40:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-22T11:44:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/301018-Rainings-Stairs-010_1200.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Thinking outside the modular construction box\" \/>\n<meta name=\"twitter:description\" content=\"With the UK and Scottish governments keen to tackle the housing crisis, institutional investors have pricked up their ears to the potential earnings from offsite construction.\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Thinking outside the offsite construction box\",\"datePublished\":\"2020-07-22T09:40:39+00:00\",\"dateModified\":\"2020-07-22T11:44:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\"},\"wordCount\":698,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--275x300.jpg\",\"keywords\":[\"Contributor Profile\",\"Energy Efficiency\",\"Housebuilding\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\",\"PBC Today August 2020\",\"sh Scotframe\",\"Skills Shortage\",\"Timber\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\",\"name\":\"Thinking outside the offsite construction box\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--275x300.jpg\",\"datePublished\":\"2020-07-22T09:40:39+00:00\",\"dateModified\":\"2020-07-22T11:44:21+00:00\",\"description\":\"Modular construction is getting a lot of attention for the undoubted benefits it offers but it is only one of many offsite solutions, like timber frame\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box-.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box-.jpg\",\"width\":1049,\"height\":1143,\"caption\":\"offsite construction, timber frame,\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Thinking outside the offsite construction box\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Thinking outside the offsite construction box","description":"Modular construction is getting a lot of attention for the undoubted benefits it offers but it is only one of many offsite solutions, like timber frame","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/","og_locale":"en_US","og_type":"article","og_title":"Thinking outside the modular construction box","og_description":"With the UK and Scottish governments keen to tackle the housing crisis, institutional investors have pricked up their ears to the potential earnings from offsite construction.","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-07-22T09:40:39+00:00","article_modified_time":"2020-07-22T11:44:21+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/301018-Rainings-Stairs-010_1200.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Thinking outside the modular construction box","twitter_description":"With the UK and Scottish governments keen to tackle the housing crisis, institutional investors have pricked up their ears to the potential earnings from offsite construction.","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Thinking outside the offsite construction box","datePublished":"2020-07-22T09:40:39+00:00","dateModified":"2020-07-22T11:44:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/"},"wordCount":698,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--275x300.jpg","keywords":["Contributor Profile","Energy Efficiency","Housebuilding","Modern Methods of Construction","Modular Construction","Offsite Construction","PBC Today August 2020","sh Scotframe","Skills Shortage","Timber"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/","name":"Thinking outside the offsite construction box","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box--275x300.jpg","datePublished":"2020-07-22T09:40:39+00:00","dateModified":"2020-07-22T11:44:21+00:00","description":"Modular construction is getting a lot of attention for the undoubted benefits it offers but it is only one of many offsite solutions, like timber frame","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box-.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/07\/Thinking-outside-the-modular-construction-box-.jpg","width":1049,"height":1143,"caption":"offsite construction, timber frame,"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/outside-modular-construction\/60344\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Thinking outside the offsite construction box"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 10:14:40","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/60344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=60344"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/60344\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=60344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=60344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=60344"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=60344"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=60344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}