{"id":61756,"date":"2019-08-15T11:29:06","date_gmt":"2019-08-15T10:29:06","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=61756"},"modified":"2019-10-06T19:51:58","modified_gmt":"2019-10-06T18:51:58","slug":"bim4water-water-sector","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/","title":{"rendered":"BIM4Water: A drive for digital transformation across the UK water sector"},"content":{"rendered":"<h2>BIM4Water has moved from a start-up group in 2013 raising awareness of BIM in the water sector to become a leadership group with over 200 members, who are taking practical and collaborative steps to implement BIM in this sector and sharing experiences more widely through its publications, case studies, seminars and via the UK BIM Alliance<\/h2>\n<p>BIM4Water was established in 2013 as part of the UK government <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/legal-contractual-issues-bim\/58027\/\" target=\"_blank\" rel=\"noopener\">BIM Task Group<\/a> initiative to promote BIM across the water sector. The group has a mission \u201cto lead the digital transformation of the water sector through Better Information Management\u201d and provides a focus for setting standards, best practice and to consider the cultural impact and the benefits when <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/understanding-bim\/54890\/\" target=\"_blank\" rel=\"noopener\">implementing BIM<\/a>.<\/p>\n<p>As a cross-industry group, it is open to all bodies involved in the management and delivery of water and water wastewater assets. The group\u2019s make-up is reflective of the sector\u2019s collaboration with water companies (20), consultants (16), contractors (15) and the supply chain (46).<\/p>\n<p>BIM4Water is governed by a Steering Group, with representatives from the owner operators, consultants, contractors and suppliers. In line with the current roadmap, it currently has four working groups, which are:<\/p>\n<p><strong>The owner-operators<\/strong> aim is to promote the development of BIM capability through the use of a Framework to enable efficiencies through the application of BIM. It has published guidelines on the adoption of BIM and is current working on the maturity of BIM across the sector using the Project 13 tool and BIM hierarchy of needs (see website for details). Work is also progressing on \u201cProject information requirements\u201d.<\/p>\n<p><strong>The Standard Libraries Group<\/strong> is a focus for standards. The primary activity has been developing an approach for Product Data Templates (PDTs). PDTs are standard forms to allow manufactures to supply non-graphical information about their products for use on projects. The group is currently looking at \u201csystemising\u201d the PDTs.<\/p>\n<p><strong>The Benefits &amp; Case Studies Group<\/strong> looks at various ways to encourage the take-up of BIM. The group investigates and suggestions suitable tool and publishes case studies that demonstrate the benefits of BIM and the lessons learned.<\/p>\n<p><strong>The 4D Group<\/strong> is working on the best practice of using 4D (sequencing of construction), which includes the digital took kit, contractual arrangements and highlighting the benefits such as H&amp;S, time and financial savings.<\/p>\n<p>In early 2019, the group launched the BIM4Water Award for innovation using BIM in the water sector.<\/p>\n<p>They were delighted with entries from water companies, consultants, contractors and the supply chain. The judges gave the award to a joint entry from Northumbrian Water, Wood and Interserve. BIM4Water have successfully run a number of seminar events through the year. In early July, there was focus on \u201cBenefits for All\u201d held in Manchester; in September, a seminar on H&amp;S at Cranfield University, followed by a winter meeting to be jointly held with BIM4Legal in London.<\/p>\n<h3>Case study: Cambridge Water Recycling Centre extensions<\/h3>\n<p><strong>Client:<\/strong> Anglian Water<\/p>\n<p><strong>Location:<\/strong> Cambridge<\/p>\n<p><strong>Project team:<\/strong> @one Alliance, Skanska Technical<\/p>\n<p>Services, Glasswell &amp; Last, Carlow Precast, Asset<\/p>\n<p>international (Weholite), Bell Formwork &amp; Civil<\/p>\n<p>Contractors, Max Right.<\/p>\n<p><strong>Completion:<\/strong> 2015<\/p>\n<p>The Cambridge Growth Scheme was mandated to provide treatment capacity for growth in the Cambridge Water Recycling Centre (WRC) catchment as projected by Anglian Water\u2019s regulatory growth targets output.<\/p>\n<p>The project was delivered in two phases. Phase 1 to provide a treatment capacity of 168,000pe to cater for initial expected growth, and a Phase 2 treatment capacity increase of 27,000pe to 195,000pe. This increased the capacity from the original population equivalent of 145,000. However, both phases were delivered without a break in construction on site.<\/p>\n<p>In addition, as a result of the growth and changed pollutant loads to the receiving watercourse, the river Cam, a new quality consent was agreed as the basis of design for the project.<\/p>\n<p>The main problems driving the need for the project were:<\/p>\n<ul>\n<li>Historic growth \u2013 current PE significantly greater than reported in 2011.<\/li>\n<li>Future growth predicted in the catchment.<\/li>\n<li>Unsuitable treatment processes for stringent BOD and solids standards.<\/li>\n<\/ul>\n<p>The project scope was to deliver:<\/p>\n<ul>\n<li>A new Activated Sludge Plant comprising four activated sludge lanes.<\/li>\n<li>Four new 38m Final Settlement tanks with full bridge scrapers.<\/li>\n<li>A new Return Activated Sludge pumping station.<\/li>\n<li>A new Surplus Activated Sludge pumping station.<\/li>\n<li>A new scum pumping station.<\/li>\n<li>Two new sludge thickeners with associated pumps and dosing.<\/li>\n<\/ul>\n<p>Anglian Water has been using BIM since 2010, predominantly through its capital delivery partner @one Alliance. BIM is not a formal requirement from Anglian Water, although the benefits have been recognised by all parties during this time.<\/p>\n<p>Hardware and software was provided by Anglian Water for @one with some additional hardware, such as tablets for site, purchased through capital projects. Cloud services were provided by Skanska.<\/p>\n<p>The BIM scope for the project was to deliver 3D, collaboration, product-based delivery, DfMA and information management.<\/p>\n<p>Graphical BIM data was used at the outset. A decision to use non-graphical BIM was made later in the project. This included back-populating asset classifications into the 3D model based on definitions within the client asset management system.<\/p>\n<p>To get everyone on board, the construction and commissioning teams were given on-site, role-based training. The client operational teams attended collaborative planning sessions throughout the project and were provided with hardware to engage with the design and digital \u201csafe to operate\u201d reviews.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-61762 size-full\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png\" alt=\"BIM4Water, water sector\" width=\"957\" height=\"708\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png 957w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-300x222.png 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-768x568.png 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-80x60.png 80w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-485x360.png 485w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-696x515.png 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-568x420.png 568w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2-610x451.png 610w\" sizes=\"auto, (max-width: 957px) 100vw, 957px\" \/><\/p>\n<p>BIM had a positive impact on the design of the project. Key stakeholders (operations, commissioning, construction managers, supply chain etc) were engaged early and given the opportunity to collaborate and review the project model in a timely manner. Along with offsite assembly and digital rehearsal of construction sequences to enable better planning, this meant that the design was right first time and there was no physical snagging on site, resulting in estimated savings of around \u00a3250,000.<\/p>\n<p>The digital approach resulted in a reduction in time of 10 months on site during the construction phase, reduced risk of waste and rework around asset data handover and commercial project closeout, and improvements in data quality in the asset management system (60% up to 95%).<\/p>\n<p>Phase One of the project was handed over in March 2015, with Phase Two following in October 2015. Against a budget of \u00a322.5m, the project was delivered for \u00a320.1m.<\/p>\n<p>More information on BIM4Water can be found on <a href=\"https:\/\/www.britishwater.co.uk\/bim.aspx\" target=\"_blank\" rel=\"noopener\">our website<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Jamie Mills<\/strong><\/p>\n<p>Chair<\/p>\n<p>BIM4Water<\/p>\n<p><a href=\"mailto:Jamie.mills@xyleminc.com\" target=\"_blank\" rel=\"noopener\">Jamie.mills@xyleminc.com<\/a><\/p>\n<p><a href=\"http:\/\/www.britishwater.co.uk\/bim.aspx\" target=\"_blank\" rel=\"noopener\">www.britishwater.co.uk\/bim.aspx<\/a><\/p>\n<p>Twitter: <a href=\"http:\/\/www.twitter.com\/BIM4Water\" target=\"_blank\" rel=\"noopener\">@BIM4Water<\/a><\/p>\n<p>LinkedIn: <a href=\"https:\/\/www.linkedin.com\/showcase\/bim4water\/\" target=\"_blank\" rel=\"noopener\">BIM4Water<\/a><\/p>\n<p>YouTube: <a href=\"https:\/\/www.youtube.com\/channel\/UCFxHAMONuKHXMw9iYz3NdhQ\" target=\"_blank\" rel=\"noopener\">BIM4Water<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>BIM4Water has moved from a start-up group in 2013, to become a leadership group with over 200 members, who are taking practical and collaborative steps to implement BIM in the water sector.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[428,36493,676,574,688,579,33369,802],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-61756","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim","8":"tag-bim-today-september-2019","9":"tag-construction","10":"tag-data-management","11":"tag-digital-construction","12":"tag-infrastructure","13":"tag-pbc-today-august-2019","14":"tag-water-management"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>BIM4Water: A drive for digital transformation across the UK water sector<\/title>\n<meta name=\"description\" content=\"BIM4Water has moved from a start-up group, to become a leadership group, who are taking practical steps to implement BIM in the water sector\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM4Water: A drive for digital transformation across the UK water sector\" \/>\n<meta property=\"og:description\" content=\"BIM4Water has moved from a start-up group in 2013, to become a leadership group with over 200 members, who are taking practical and collaborative steps to implement BIM in the water sector\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-08-15T10:29:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-10-06T18:51:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4water-group-winners.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"BIM4Water: A drive for digital transformation across the UK water sector\" \/>\n<meta name=\"twitter:description\" content=\"BIM4Water has moved from a start-up group in 2013, to become a leadership group with over 200 members, who are taking practical and collaborative steps to implement BIM in the water sector\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"BIM4Water: A drive for digital transformation across the UK water sector\",\"datePublished\":\"2019-08-15T10:29:06+00:00\",\"dateModified\":\"2019-10-06T18:51:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\"},\"wordCount\":1070,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png\",\"keywords\":[\"BIM\",\"BIM Today September 2019\",\"Construction Processes\",\"Data Management\",\"Digital Construction\",\"Infrastructure\",\"PBC Today August 2019\",\"Water Management\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\",\"name\":\"BIM4Water: A drive for digital transformation across the UK water sector\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png\",\"datePublished\":\"2019-08-15T10:29:06+00:00\",\"dateModified\":\"2019-10-06T18:51:58+00:00\",\"description\":\"BIM4Water has moved from a start-up group, to become a leadership group, who are taking practical steps to implement BIM in the water sector\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png\",\"width\":957,\"height\":708,\"caption\":\"BIM4Water, water sector\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM4Water: A drive for digital transformation across the UK water sector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"BIM4Water: A drive for digital transformation across the UK water sector","description":"BIM4Water has moved from a start-up group, to become a leadership group, who are taking practical steps to implement BIM in the water sector","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/","og_locale":"en_US","og_type":"article","og_title":"BIM4Water: A drive for digital transformation across the UK water sector","og_description":"BIM4Water has moved from a start-up group in 2013, to become a leadership group with over 200 members, who are taking practical and collaborative steps to implement BIM in the water sector","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-08-15T10:29:06+00:00","article_modified_time":"2019-10-06T18:51:58+00:00","og_image":[{"width":2000,"height":1500,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4water-group-winners.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"BIM4Water: A drive for digital transformation across the UK water sector","twitter_description":"BIM4Water has moved from a start-up group in 2013, to become a leadership group with over 200 members, who are taking practical and collaborative steps to implement BIM in the water sector","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"BIM4Water: A drive for digital transformation across the UK water sector","datePublished":"2019-08-15T10:29:06+00:00","dateModified":"2019-10-06T18:51:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/"},"wordCount":1070,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png","keywords":["BIM","BIM Today September 2019","Construction Processes","Data Management","Digital Construction","Infrastructure","PBC Today August 2019","Water Management"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/","name":"BIM4Water: A drive for digital transformation across the UK water sector","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png","datePublished":"2019-08-15T10:29:06+00:00","dateModified":"2019-10-06T18:51:58+00:00","description":"BIM4Water has moved from a start-up group, to become a leadership group, who are taking practical steps to implement BIM in the water sector","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/08\/BIM4Water-2.png","width":957,"height":708,"caption":"BIM4Water, water sector"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim4water-water-sector\/61756\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"BIM4Water: A drive for digital transformation across the UK water sector"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-08 19:02:18","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/61756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=61756"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/61756\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=61756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=61756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=61756"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=61756"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=61756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}