{"id":65226,"date":"2019-10-17T09:58:01","date_gmt":"2019-10-17T08:58:01","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=65226"},"modified":"2019-10-17T09:58:02","modified_gmt":"2019-10-17T08:58:02","slug":"insulated-floor-installation","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/","title":{"rendered":"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation"},"content":{"rendered":"\n<h2><a href=\"https:\/\/www.creaghconcrete.co.uk\/products\/spantherm\" target=\"_blank\" rel=\"noopener noreferrer\">Creagh\u2019s Spantherm<\/a> harnesses offsite production to reduce the time to install a fully insulated floor from weeks to days<\/h2>\n<p>Creagh\u2019s Spantherm thermally efficient flooring is being utilised at a housing development in Warmington, Peterborough, in England. The 11 new homes development is being built by NRI Civils and will be ready by the end of 2019.<\/p>\n<p>NRI Civils chose Spantherm insulated precast concrete <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/efficiency-local-housebuilders\/56118\/\" target=\"_blank\" rel=\"noopener noreferrer\">flooring system<\/a> as it is designed specifically for use at ground floor level in residential and small to medium-sized commercial projects.&nbsp;They opted for the work to be completed by Creagh\u2019s expert fitting team, requiring no labour from them and saving them time on site.<\/p>\n<p>Adam Moody, contracts manager for NRI Civils, stated: \u201cWe chose Spantherm because one of the things that we are looking for as a business is to improve efficiencies, reduce costs, reduce labour and time on site and when you\u2019ve got a difficult site, where you\u2019re struggling for storage, that\u2019s exactly where Spantherm is perfect.\u201d<\/p>\n<p>Spantherm is installed in just minutes, not days. By producing high performance insulated concrete units offsite, we have redefined the speed of installing a fully insulated floor. This is the next generation of structural flooring systems designed as the efficient alternative to labour-intensive beam and block installations.<\/p>\n<p>Housebuilders increasingly explore the opportunities for new ideas to reduce labour onsite and boost efficiency in the build it makes sense that they start with the ground floor. The initial appeal of Spantherm is clear, as a typical floor on a detached house or a pair of semis is fitted onsite in less than two hours.<\/p>\n<p>Once in place and grouted, the floor achieves its full structural capability within 72 hours but building activity can commence on perimeter walls within 24 hours.<\/p>\n<p>Adam said: \u201cThe team have been absolutely fantastic with the support we get, anything that we need to discuss with them, they are always on hand, so we have a great relationship. We will definitely be using Spantherm again to help our optimum goal of achieving better efficiency and reducing costs and labour times.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.creaghconcrete.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Creagh<\/a><\/p>\n<p>Tel: +44 (0)1636 831043<\/p>\n<p><a href=\"mailto:hoveringham@creaghconcrete.com\" target=\"_blank\" rel=\"noopener noreferrer\">hoveringham@creaghconcrete.com<\/a><\/p>\n<p><a href=\"http:\/\/www.creaghconcrete.co.uk\" target=\"_blank\" rel=\"noopener noreferrer\">www.creaghconcrete.co.uk<\/a><\/p>\n<p>Twitter: <a href=\"https:\/\/twitter.com\/creaghconcrete\" target=\"_blank\" rel=\"noopener noreferrer\">@CreaghConcrete<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><em>Please note: this is a commercial profile.<\/em><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install a fully insulated floor from weeks to days.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[811,583,464,656,586,696,40577,25640],"stakeholder_rel_tag":[172423],"contributor_rel_tag":[],"class_list":{"0":"post-65226","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-concrete","8":"tag-construction-products","9":"tag-contributor-profile","10":"tag-housing","11":"tag-insulation","12":"tag-offsite-construction","13":"tag-pbc-today-november-2019","14":"tag-sh-creagh","15":"stakeholder_rel_tag-creagh"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation<\/title>\n<meta name=\"description\" content=\"Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install an insulated floor from weeks to days at a housing development in Warmington\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation\" \/>\n<meta property=\"og:description\" content=\"Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install an insulated floor from weeks to days at a housing development in Warmington\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-10-17T08:58:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-10-17T08:58:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/10\/3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation\",\"datePublished\":\"2019-10-17T08:58:01+00:00\",\"dateModified\":\"2019-10-17T08:58:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\"},\"wordCount\":376,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Concrete and Cement\",\"Construction Products\",\"Contributor Profile\",\"Housing system\",\"Insulation\",\"Offsite Construction\",\"PBC Today November 2019\",\"SH Creagh\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\",\"name\":\"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2019-10-17T08:58:01+00:00\",\"dateModified\":\"2019-10-17T08:58:02+00:00\",\"description\":\"Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install an insulated floor from weeks to days at a housing development in Warmington\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation","description":"Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install an insulated floor from weeks to days at a housing development in Warmington","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/","og_locale":"en_US","og_type":"article","og_title":"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation","og_description":"Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install an insulated floor from weeks to days at a housing development in Warmington","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-10-17T08:58:01+00:00","article_modified_time":"2019-10-17T08:58:02+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/10\/3.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation","datePublished":"2019-10-17T08:58:01+00:00","dateModified":"2019-10-17T08:58:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/"},"wordCount":376,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Concrete and Cement","Construction Products","Contributor Profile","Housing system","Insulation","Offsite Construction","PBC Today November 2019","SH Creagh"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/","name":"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2019-10-17T08:58:01+00:00","dateModified":"2019-10-17T08:58:02+00:00","description":"Creagh\u2019s Spantherm harnesses offsite production to reduce the time to install an insulated floor from weeks to days at a housing development in Warmington","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/insulated-floor-installation\/65226\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Creagh\u2019s Spantherm: Revolutionising fully insulated floor installation"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-09-29 01:12:32","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/65226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=65226"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/65226\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=65226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=65226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=65226"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=65226"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=65226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}