{"id":68410,"date":"2019-11-29T11:34:16","date_gmt":"2019-11-29T11:34:16","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=68410"},"modified":"2019-11-29T11:34:16","modified_gmt":"2019-11-29T11:34:16","slug":"construction-planning-in-4d","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/","title":{"rendered":"Thames Tideway Tunnel: Construction planning in 4D"},"content":{"rendered":"<h2>4D construction planning has delivered \u00a31m in savings on the eastern section of the <a href=\"https:\/\/www.tideway.london\/\" target=\"_blank\" rel=\"noopener noreferrer\">Thames Tideway Tunnel<\/a>, part of the UK\u2019s largest-ever water infrastructure project<\/h2>\n<p>London relies on a sewer system built 150 years ago for a population of less than half its current size. As a result, millions of tonnes of raw sewage and rainwater is discharged into the River Thames every year.<\/p>\n<p>The Thames Tideway Tunnel, to be completed in 2024, aims to prevent this overflow through the construction of a 25km \u201c<a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/super-sewer-on-track\/58883\/\" target=\"_blank\" rel=\"noopener noreferrer\">super sewer<\/a>\u201d that will protect the river, as well as surrounding communities and wildlife.<\/p>\n<p>It is the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/super-sewer-tideway\/55100\/\" target=\"_blank\" rel=\"noopener noreferrer\">largest infrastructure project<\/a> ever undertaken by the UK\u2019s water industry, involving 24 construction sites, 11 of which are located along the banks of the Thames, 12 design disciplines and numerous supply chain companies. Communicating and coordinating with all project stakeholders to organise construction successfully, particularly when schedules are tight and there are small, challenging project sites is vital.<\/p>\n<h3>Streamlining construction planning on Tideway<\/h3>\n<p>The Tideway project actively promotes innovation to challenge traditional ways of working and reduce complexity. The <a href=\"https:\/\/www.costain.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Costain<\/a>, <a href=\"https:\/\/www.vinci-construction-projets.com\/en\/\" target=\"_blank\" rel=\"noopener noreferrer\">VINCI Construction Grands Projets<\/a> and <a href=\"https:\/\/www.bacsol.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Bachy Soletanche<\/a> joint venture (CVB), aims to push the boundaries of conventional construction to deliver value, right-first-time quality and sustainability while leaving a legacy that will benefit Londoners for more than a century.<\/p>\n<p>The CVB JV employed <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bentley-infrastructure-construction\/53029\/\" target=\"_blank\" rel=\"noopener noreferrer\">Bentley\u2019s SYNCHRO 4D<\/a> to streamline construction planning activities and improve progress tracking and management. This new workflow combines 3D models with the construction schedule to produce a 4D plan that shows how the project will develop over time.<\/p>\n<h3>4D planning on Tideway<\/h3>\n<p>Implementing 4D collaborative planning enabled the Tideway construction teams to effectively manage highly congested sites with multiple, concurrent activities and different subcontractors who need to work together in tight confinement. Regular planning sessions among the various disciplines allowed the team to identify and resolve clashes and choose the optimum construction methodology, which reduced delays and field-change requests.<\/p>\n<p>The construction planning sessions also involve value engineering activities that consider all design, environmental, health and safety, logistical, cost, and time constraints, and providing the client and specialist subcontractors with the opportunity to influence and improve early decision making.<\/p>\n<p>For example, during a one-hour start-up meeting between CVB and <a href=\"https:\/\/www.networkrail.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Network Rail<\/a>, the team discussed a number of key interactions relating to safety and major deliverables. To ensure an optimal solution was achieved, the team reviewed the site conditions at a number of key schedule milestones and took measurements on the 4D model to identify asset protection requirements and explore potential crane locations. As a result, the work schedule was revised to avoid unnecessary setup and relocation, compressing the time to complete this phase by 50%.<\/p>\n<h3>Modelling to engage the community<\/h3>\n<p>To date, the combination of 4D with lean construction methodology has reduced the overall construction programme by 30 days, achieving \u00a31m in direct and indirect cost reductions. The 4D construction models have also been a particularly useful method to engage local residents, community groups and councils \u2013 individuals unfamiliar with interpreting traditional technical drawings and reports.<\/p>\n<p>\u201cBentley\u2019s 4D modelling application has resulted in considerable time and cost savings of more than \u00a31m on Britain\u2019s largest-ever water infrastructure project,\u201d said Sandra Reis, BIM manager at Tideway.<\/p>\n<p>\u201cThe technology shortened design time, reduced resource hours, made meetings more productive, and eliminated tedious tasks. The collaborative approach achieved through SYNCHRO 4D has been key to involving the client, designers and fabricators during early decision making.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Thames Tideway Tunnel<\/strong><\/p>\n<p><a href=\"http:\/\/www.tideway.london\" target=\"_blank\" rel=\"noopener noreferrer\">www.tideway.london<\/a><\/p>\n<p>Twitter:\u00a0<a href=\"https:\/\/twitter.com\/tidewaylondon\" target=\"_blank\" rel=\"noopener noreferrer\">TidewayLondon<\/a><\/p>\n<p>LinkedIn:\u00a0<a href=\"https:\/\/www.linkedin.com\/company\/tideway-london\/\" target=\"_blank\" rel=\"noopener noreferrer\">Tideway London<\/a><\/p>\n<p>Instagram:\u00a0<a href=\"https:\/\/www.instagram.com\/tidewaylondon\/\" target=\"_blank\" rel=\"noopener noreferrer\">TidewayLondon<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the UK\u2019s largest-ever water infrastructure project.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[428,44519,676,583,579,947,952,943,701,802],"stakeholder_rel_tag":[172387],"contributor_rel_tag":[],"class_list":{"0":"post-68410","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim","8":"tag-bim-today-december-2019","9":"tag-construction","10":"tag-construction-products","11":"tag-infrastructure","12":"tag-london","13":"tag-planning","14":"tag-sh-bentley-systems","15":"tag-supply-chain","16":"tag-water-management","17":"stakeholder_rel_tag-bentley-systems"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Thames Tideway Tunnel: Construction planning in 4D<\/title>\n<meta name=\"description\" content=\"4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Thames Tideway Tunnel: Construction planning in 4D\" \/>\n<meta property=\"og:description\" content=\"4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-29T11:34:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/11\/YII2019_CVB_JV_Thames.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Thames Tideway Tunnel: Construction planning in 4D\",\"datePublished\":\"2019-11-29T11:34:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\"},\"wordCount\":593,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"BIM\",\"BIM Today December 2019\",\"Construction Processes\",\"Construction Products\",\"Infrastructure\",\"London\",\"Planning\",\"SH Bentley Systems\",\"Supply Chain\",\"Water Management\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\",\"name\":\"Thames Tideway Tunnel: Construction planning in 4D\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2019-11-29T11:34:16+00:00\",\"description\":\"4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Thames Tideway Tunnel: Construction planning in 4D\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Thames Tideway Tunnel: Construction planning in 4D","description":"4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/","og_locale":"en_US","og_type":"article","og_title":"Thames Tideway Tunnel: Construction planning in 4D","og_description":"4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2019-11-29T11:34:16+00:00","og_image":[{"width":2000,"height":1500,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2019\/11\/YII2019_CVB_JV_Thames.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Thames Tideway Tunnel: Construction planning in 4D","datePublished":"2019-11-29T11:34:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/"},"wordCount":593,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["BIM","BIM Today December 2019","Construction Processes","Construction Products","Infrastructure","London","Planning","SH Bentley Systems","Supply Chain","Water Management"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/","name":"Thames Tideway Tunnel: Construction planning in 4D","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2019-11-29T11:34:16+00:00","description":"4D construction planning has delivered \u00a31m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/construction-planning-in-4d\/68410\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Thames Tideway Tunnel: Construction planning in 4D"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 04:00:08","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/68410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=68410"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/68410\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=68410"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=68410"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=68410"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=68410"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=68410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}