{"id":71895,"date":"2020-02-17T10:40:24","date_gmt":"2020-02-17T10:40:24","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=71895"},"modified":"2021-01-25T11:32:12","modified_gmt":"2021-01-25T11:32:12","slug":"wernick-modular-building","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/","title":{"rendered":"Wernick\u2019s new office pushes the limits of modular construction"},"content":{"rendered":"<h2>Designed by <a href=\"https:\/\/www.wernick.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Wernick<\/a>\u2019s in-house architectural team, the new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and <a href=\"https:\/\/www.breeam.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">BREEAM<\/a> &#8216;Excellent&#8217; standard<\/h2>\n<p>Using the latest in modular building technologies, the building is made up of 28 modules which were constructed at Wernick\u2019s manufacturing facility in South Wales, then transported to site via lorry and installed by the Wickford team.<\/p>\n<p>The modern external design is covered in Trespa external wall cladding plus a very <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/timber-frame-market-2020\/71667\/\" target=\"_blank\" rel=\"noopener noreferrer\">striking timber<\/a> Brise Soleil. This is complemented by an attractive two-story glass entrance.<\/p>\n<p>The two-storey structure was part of a \u00a33m redevelopment which also included a new modular building for Wernick\u2019s local Buildings and Hire teams, who moved into their new surroundings sited opposite in March 2019.<\/p>\n<h3>Design and interior<\/h3>\n<p>When you enter the building, you are immediately dazzled by the double-height lobby which has an exposed <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/engineered-timber-innovation\/71303\/\" target=\"_blank\" rel=\"noopener noreferrer\">CLT<\/a> ceiling and porcelain tiled floor. Here, receptionists can answer and transfer calls on-screen using the new telephone software.<\/p>\n<p>Over the two floors of the building, you can find glass partitioned open-plan office areas, meeting rooms, staff welfare facilities (including a shower) and the new canteen with state-of-the-art catering facilities. Set up for client and staff presentations, the large board room also impresses with its large mahogany table, leather chairs and 85\u201d TV.<\/p>\n<p>The addition of air-con in all the rooms enhances the comfort and productivity of staff \u2013 who can adjust settings using a mobile app.<\/p>\n<p>Interior finish is complemented perfectly with brand new furniture which gives a consistent, corporate look whilst creating an inviting work environment for the entire Head Office team.<\/p>\n<h3>BREEAM excellence rating<\/h3>\n<p>The BREEAM excellence rating was achieved with sustainable additions such as 10kw of photovoltaics (PV) panels on the roof of the building, electric car charging points and aptly some nesting boxes for Swifts (bird).<\/p>\n<h3>Modular buildings are not just a temporary solution<\/h3>\n<p>Wernick\u2019s chairman, David Wernick commented: \u2018\u2018We believe our Swiftplan\u00ae system will help change the perception that modular buildings are a temporary solution.<\/p>\n<p>&#8220;The new offices show what can be achieved, and we welcome visitors to come and see this building for themselves.&#8221;<\/p>\n<p>Wernick buildings director, Andy King, whose team designed the new offices, said: &#8220;Modular \u2018offsite\u2019 construction delivers shorter project times and reduces costs when compared to traditional construction methods.<\/p>\n<p>&#8220;The fact that much of the work is done \u2018offsite\u2019 in a controlled <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/modular-factory-leeds\/70376\/\" target=\"_blank\" rel=\"noopener noreferrer\">factory environment<\/a> means the whole building programme is greatly reduced, saving on costs and greatly reducing waste &#8211; the percentage of waste recycled and diverted from landfill for this project was 98%!\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Designed by Wernick\u2019s in-house architectural team, the new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM &#8216;Excellent&#8217; standard.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[587,897,856,430,916,627,696,79411,465,915],"stakeholder_rel_tag":[172549],"contributor_rel_tag":[],"class_list":{"0":"post-71895","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-breeam","8":"tag-cladding","9":"tag-construction-technology","10":"tag-energy-efficiency","11":"tag-modern-methods-of-construction","12":"tag-modular-construction","13":"tag-offsite-construction","14":"tag-sh-wernick-group","15":"tag-sustainable-construction","16":"tag-timber","17":"stakeholder_rel_tag-wernick-group"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Wernick\u2019s new office pushes the limits of modular construction<\/title>\n<meta name=\"description\" content=\"Wernicks new new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM &#039;Excellent&#039; standard\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wernick\u2019s new office pushes the limits of modular construction\" \/>\n<meta property=\"og:description\" content=\"Designed by Wernick\u2019s in-house architectural team, the new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM &#039;Excellent&#039; standard\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-17T10:40:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-25T11:32:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/02\/Wernick-Group-HO-at-Night.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Wernick\u2019s new office pushes the limits of modular construction\" \/>\n<meta name=\"twitter:description\" content=\"Designed by Wernick\u2019s in-house architectural team, the new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM &#039;Excellent&#039; standard\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/02\/Wernick-Group-HO-at-Night.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Wernick\u2019s new office pushes the limits of modular construction\",\"datePublished\":\"2020-02-17T10:40:24+00:00\",\"dateModified\":\"2021-01-25T11:32:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\"},\"wordCount\":436,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"BREEAM\",\"Cladding\",\"Construction Technology\",\"Energy Efficiency\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\",\"SH Wernick Group\",\"Sustainable Construction\",\"Timber\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\",\"name\":\"Wernick\u2019s new office pushes the limits of modular construction\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2020-02-17T10:40:24+00:00\",\"dateModified\":\"2021-01-25T11:32:12+00:00\",\"description\":\"Wernicks new new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM 'Excellent' standard\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wernick\u2019s new office pushes the limits of modular construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Wernick\u2019s new office pushes the limits of modular construction","description":"Wernicks new new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM 'Excellent' standard","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/","og_locale":"en_US","og_type":"article","og_title":"Wernick\u2019s new office pushes the limits of modular construction","og_description":"Designed by Wernick\u2019s in-house architectural team, the new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM 'Excellent' standard","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-02-17T10:40:24+00:00","article_modified_time":"2021-01-25T11:32:12+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/02\/Wernick-Group-HO-at-Night.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_title":"Wernick\u2019s new office pushes the limits of modular construction","twitter_description":"Designed by Wernick\u2019s in-house architectural team, the new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM 'Excellent' standard","twitter_image":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/02\/Wernick-Group-HO-at-Night.jpg","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Wernick\u2019s new office pushes the limits of modular construction","datePublished":"2020-02-17T10:40:24+00:00","dateModified":"2021-01-25T11:32:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/"},"wordCount":436,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["BREEAM","Cladding","Construction Technology","Energy Efficiency","Modern Methods of Construction","Modular Construction","Offsite Construction","SH Wernick Group","Sustainable Construction","Timber"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/","name":"Wernick\u2019s new office pushes the limits of modular construction","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2020-02-17T10:40:24+00:00","dateModified":"2021-01-25T11:32:12+00:00","description":"Wernicks new new modular building uses its Swiftplan\u00ae system to achieve an EPC rating of \u2018A\u2019 and BREEAM 'Excellent' standard","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/wernick-modular-building\/71895\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Wernick\u2019s new office pushes the limits of modular construction"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-09 21:06:17","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/71895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=71895"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/71895\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=71895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=71895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=71895"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=71895"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=71895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}