{"id":73098,"date":"2020-03-11T12:55:53","date_gmt":"2020-03-11T12:55:53","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=73098"},"modified":"2020-03-11T12:55:53","modified_gmt":"2020-03-11T12:55:53","slug":"bim-barriers","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/","title":{"rendered":"What is holding back BIM?"},"content":{"rendered":"<h2>Damian O&#8217;Neill, director\u00a0of civil and structural design services provider, <a href=\"http:\/\/mailstat.us\/tr\/t\/orzyoawhk60nqqkr\/6\/http:\/www.lyonsoneill.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Lyons O&#8217;Neill<\/a>, takes a look at how BIM is being applied in UK construction and the barriers it faces<\/h2>\n<p>Start any discussion of technology in our sector and there\u2019s a three-letter acronym which will always pass your lips. BIM is one of the chief ways the construction industry is <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/2019-bim-survey\/57742\/\" target=\"_blank\" rel=\"noopener noreferrer\">embracing digitisation<\/a> and its growth over the past decade has been rapid.<\/p>\n<p>According to the<a href=\"http:\/\/mailstat.us\/tr\/t\/orzyoawhk60nqqkr\/7\/https:\/www.thenbs.com\/knowledge\/national-bim-report-2019\" target=\"_blank\" rel=\"noopener noreferrer\">\u00a02019 NBS National BIM Report<\/a>, overall trends of BIM awareness and adoption have increased from 10% in 2011 to around 70% on the previous year. The 3D model-based process is seen as an answer to the construction sector\u2019s sustainability crisis and a way to attract a younger generation to an ageing industry.<\/p>\n<p>BIM is being used on a vast array of projects, including\u00a0helping the City of Paris with its redevelopment before the 2024 Olympics. It is, quite literally, shaping tomorrow\u2019s world.<\/p>\n<h3>Barriers to adoption<\/h3>\n<p>However, behind the headlines lies a different story. Despite the awareness and enthusiasm around BIM, there are still a number of limiting factors slowing the uptake of its technology. The unevenness of its adoption has been noted, with SMEs and supply chain partners less likely to use the process and expertise often concentrated around London. This has led some to grow concerned about the emergence of a \u2018two-tier\u2019 system where only some firms reap the benefits of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/digital-transformation-sustainability\/72560\/\" target=\"_blank\" rel=\"noopener noreferrer\">digital modelling<\/a> whilst the others get left further and further behind.<\/p>\n<p>It\u2019s clear that there are points of friction in adopting BIM and these need to be addressed if the industry is to achieve its full digital potential.<\/p>\n<p>One of the biggest barriers to adoption, reported by NBS in its 2019 survey, was a lack of client demand. In the private sector \u2013 outside the government\u2019s 2016 mandate for public sector projects \u2013 there is no prerequisite to use BIM and for smaller projects, new technology may appear unnecessary. Of course, its advantages are in no way size-specific and its clash detecting abilities are as vital for a single house as they are for Olympic-level planning. However, if using the technology isn\u2019t high on a client\u2019s agenda, it\u2019s easy for design teams to let it slide.<\/p>\n<p>The solution to these client issues is multi-faceted. Greater attention must be paid to educating smaller project commissioners about the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/banging-drum-bim\/53395\/\" target=\"_blank\" rel=\"noopener noreferrer\">advantages of BIM<\/a> and why they should demand it in their frameworks. The government also needs to ensure all its decision-makers are enforcing its public sector mandate, as the majority (57%) of those surveyed in last year\u2019s NBS report said that local government was not enforcing the 2016 mandate.<\/p>\n<p>Additionally, we need to be empowering design teams to create client demand themselves. Even if a client doesn\u2019t initially include the technology in their project plans, a design team can teach them how its technology cuts costs, errors and programme time, giving them knowledge which they can take on to future projects. Employing all these tactics simultaneously will allow us to change the culture around BIM so that the sector isn\u2019t left with black holes of innovation.<\/p>\n<h3>Lack of expertise<\/h3>\n<p>However, insufficient client demand isn\u2019t the only limiting factor. A lack of in-house expertise and training were the second and third biggest barriers to BIM, respectively, listed in the NBS report. These findings are corroborated by last year\u2019s survey by <a href=\"https:\/\/www.allplan.com\/uk_en\/\" target=\"_blank\" rel=\"noopener noreferrer\">Allplan<\/a> and the <a href=\"https:\/\/www.ice.org.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Institute of Civil Engineers<\/a>, which found that although 90% of engineers consider the BIM process relevant to their work, less than 50% have an adequate grasp of how to use it to their best advantage. It\u2019s clear there\u2019s a sizeable knowledge and skills gap which needs to be addressed.<\/p>\n<p>This gap should start to close as these new digital techniques enter into universities\u2019 curriculum but the industry can\u2019t afford to wait that long. Ideally, every firm should adjust their hiring so at least one team member is highly skilled in BIM and can lead the modelling processes whilst other staff are gradually trained. Allowing a transition period will ensure staff have enough time to properly understand the technology, in addition to allaying management fears that suddenly adopting it will disrupt the regular flow of business.<\/p>\n<h3>A shift in attitude<\/h3>\n<p>Managers and company directors also need a shift in attitude. They need to stop seeing BIM, with its associated software and training costs, as an optional extra, but a critical investment in their financial future; as fundamental to business as a website or employee contracts. At Lyons O\u2019Neill, we\u2019re proud to have reached the stage where 80% of our projects are implemented to BIM <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bim-level-2-future\/62595\/\" target=\"_blank\" rel=\"noopener noreferrer\">Level 2 maturity<\/a>. By investing in BIM we have developed a level of expertise that has enabled us to set a precedent for our future works, and has embedded the BIM process firmly into our company approach as a whole.<\/p>\n<p>Change doesn\u2019t end with clients and design teams, however. In a roundtable run last year by the Centre for Digital Built Britain and the Chartered Institute of Building, it was noted that BIM software providers can do much more in terms of developing and pricing products for SMEs, rather than shaping their packages around the needs of major firms. Creating bespoke BIM solutions for small businesses would encourage uptake by simplifying integration and reducing costs \u2013 both of which act as significant barriers for smaller firms. There\u2019s also a call for better industry-wide standards and information templates so that both clients and design teams can understand what they\u2019re aiming for, and everyone, no matter the sector, meets minimum targets.<\/p>\n<p>There\u2019s a reason BIM is so widely discussed \u2013 it has the potential to completely revolutionise the way we build and solve some of construction\u2019s biggest problems. However, this potential won\u2019t be fully realised if we don\u2019t dismantle the barriers to its growth. Removing these, and empowering every firm to benefit from BIM, is our challenge in 2020.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bim-barriers\/73098\/attachment\/what-is-holding-back-bim\/\" rel=\"attachment wp-att-73105\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-73105 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--300x200.jpg\" alt=\"BIM,\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--300x200.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--768x512.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM-.jpg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--696x464.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--630x420.jpg 630w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--610x407.jpg 610w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Damian O&#8217;Neill<\/strong><\/p>\n<p>Director<\/p>\n<p><a href=\"http:\/\/mailstat.us\/tr\/t\/orzyoawhk60nqqkr\/6\/http:\/www.lyonsoneill.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Lyons O&#8217;Neill<\/a><\/p>\n<p>Twitter: <a href=\"https:\/\/twitter.com\/LyonsOneill\" target=\"_blank\" rel=\"noopener noreferrer\">@LyonsOneill<\/a><\/p>\n<p>LinkedIn: <a href=\"https:\/\/www.linkedin.com\/company\/lyons-o'neill\/\" target=\"_blank\" rel=\"noopener noreferrer\">Lyons O&#8217;Neill<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Damian O&#8217;Neill, director\u00a0of Lyons O&#8217;Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305],"tags":[428,577,676,688,636,579,780,701],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-73098","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"tag-bim","8":"tag-bim-level-2","9":"tag-construction","10":"tag-digital-construction","11":"tag-engineering","12":"tag-infrastructure","13":"tag-collaboration","14":"tag-supply-chain"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>What is holding back BIM?<\/title>\n<meta name=\"description\" content=\"Damian O&#039;Neill, director\u00a0of Lyons O&#039;Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is holding back BIM?\" \/>\n<meta property=\"og:description\" content=\"Damian O&#039;Neill, director of Lyons O&#039;Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-11T12:55:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/\u00a9-Tangducminh.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"875\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"What is holding back BIM?\" \/>\n<meta name=\"twitter:description\" content=\"Damian O&#039;Neill, director of Lyons O&#039;Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces.\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"What is holding back BIM?\",\"datePublished\":\"2020-03-11T12:55:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\"},\"wordCount\":1011,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--300x200.jpg\",\"keywords\":[\"BIM\",\"BIM Level 2\",\"Construction Processes\",\"Digital Construction\",\"Engineering\",\"Infrastructure\",\"Project Collaboration\",\"Supply Chain\"],\"articleSection\":[\"BIM News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\",\"name\":\"What is holding back BIM?\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--300x200.jpg\",\"datePublished\":\"2020-03-11T12:55:53+00:00\",\"description\":\"Damian O'Neill, director\u00a0of Lyons O'Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM-.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM-.jpg\",\"width\":1024,\"height\":683,\"caption\":\"BIM,\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What is holding back BIM?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"What is holding back BIM?","description":"Damian O'Neill, director\u00a0of Lyons O'Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/","og_locale":"en_US","og_type":"article","og_title":"What is holding back BIM?","og_description":"Damian O'Neill, director of Lyons O'Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces.","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-03-11T12:55:53+00:00","og_image":[{"width":2000,"height":875,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/\u00a9-Tangducminh.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"What is holding back BIM?","twitter_description":"Damian O'Neill, director of Lyons O'Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces.","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"What is holding back BIM?","datePublished":"2020-03-11T12:55:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/"},"wordCount":1011,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--300x200.jpg","keywords":["BIM","BIM Level 2","Construction Processes","Digital Construction","Engineering","Infrastructure","Project Collaboration","Supply Chain"],"articleSection":["BIM News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/","name":"What is holding back BIM?","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM--300x200.jpg","datePublished":"2020-03-11T12:55:53+00:00","description":"Damian O'Neill, director\u00a0of Lyons O'Neill, takes a look at how BIM is being applied in UK construction and the barriers it faces","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM-.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/03\/What-is-holding-back-BIM-.jpg","width":1024,"height":683,"caption":"BIM,"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/bim-barriers\/73098\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"What is holding back BIM?"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-14 07:20:48","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/73098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=73098"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/73098\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=73098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=73098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=73098"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=73098"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=73098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}