{"id":77680,"date":"2020-06-16T08:48:15","date_gmt":"2020-06-16T07:48:15","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=77680"},"modified":"2020-06-16T08:48:15","modified_gmt":"2020-06-16T07:48:15","slug":"winvic-hotel-contract","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/","title":{"rendered":"Winvic secures first hotel contract"},"content":{"rendered":"<h2><a href=\"https:\/\/www.winvic.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Winvic<\/a> has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms<\/h2>\n<p>Winvic Construction has been awarded its first hotel contract by privately owned company,\u00a0<a href=\"http:\/\/www.hotel-latourmiltonkeynes.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Hotel La Tour<\/a>.<\/p>\n<p>Located on Marlborough Gate in Central Milton Keynes, the luxury four-star hotel will comprise of 261 bedrooms, a 12,900 sq ft flexible conference floor including adaptable meeting spaces and an external terrace, and a fourteenth-floor sky bar and restaurant.<\/p>\n<p>Winvic is currently on site with works progressing at pace \u2013 currently <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/sustainable-drainage-guidelines\/56264\/\" target=\"_blank\" rel=\"noopener noreferrer\">drainage<\/a> is being installed and reinforced concrete structures are being constructed above the half-basement and ground-floor.<\/p>\n<h3>BIM Level 2<\/h3>\n<p>Winvic\u2019s design team and\u00a0<a href=\"https:\/\/www.peter-haddon.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">pHp Architects<\/a>\u00a0have been working closely on the 15-storey, 50-metre-high concrete and steel framed building in the pre-construction phase for some months, utilising the 3D design capabilities of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/bim-level-2\/76492\/\" target=\"_blank\" rel=\"noopener noreferrer\">BIM Level 2<\/a>.<\/p>\n<p>Complex details include extensive structural glazing and a panoramic lift which will provide a unique visual experience of Milton Keynes for people ascending to the 43-metre high top floor.<\/p>\n<p>In addition to the hotel\u2019s restaurant and bar, there will be a public access space called See:MK. The four large conference rooms of varying sizes can be converted into a single generous space, which also opens onto a roof terrace; this terrace will be constructed to a high load bearing specification \u2013 to enable it to take the weight of a car, for example \u2013 so it can be used for events and press launches.<\/p>\n<p>Five further private meeting rooms are also located on the conference floor.<\/p>\n<p>While the split-tower form is minimal, Hotel La Tour\u2019s exterior will include rainscreen cladding which will have a stainless steel, mirror finish and a 30-metre diameter stainless steel circle with a satin finish will dominate the east facing fa\u00e7ade. This feature will be illuminated with a bespoke projected LED installation at night to form both a focal point on Midsummer Boulevard and a gateway sign to the city centre.<\/p>\n<p>A large sculpture, Cycloidal Form by Keith McCarter, will be installed adjacent to the entrance where a canopy structure extends to the \u2018drop-off\u2019 point, emulating the city-wide port-cocheres.<\/p>\n<h3>Luxury accommodation at the heart of Milton Keyne<\/h3>\n<p>Winvic\u2019s director of multi-room, Mark Jones, said: \u201cWe are naturally very proud to have been awarded our first hotel contract by Hotel La Tour, and our experience of constructing extremely high quality <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/build-to-rent-market-2\/59351\/\" target=\"_blank\" rel=\"noopener noreferrer\">build-to-rent<\/a> and student accommodation schemes means we are well placed to deliver this exciting project.<\/p>\n<p>\u201cPartnership work behind the scenes to date has been efficient, particularly due to taking advantage of the end-to-end benefits BIM has to offer, and with architects pHp we are truly illustrating cost and resource savings by investing in this approach.<\/p>\n<p>\u201cWe are looking forward to seeing the mirror-finished Hotel La Tour take shape on Milton Keynes\u2019 skyline through next year ready for a 2022 opening.\u201d<\/p>\n<p>Jane Riley, operations director at Hotel La Tour, commented: \u201cWe are very excited to be working with Winvic on the construction of Hotel La Tour Milton Keynes.<\/p>\n<p>\u201cThe team at Winvic share our vision of bringing luxury accommodation and modern conference facilities to the heart of Milton Keynes. Hotel La Tour has a long-term interest in the growing success of Milton Keynes\u2019 economy and this investment demonstrates our confidence in its strength.\u201d<\/p>\n<p>Will Elsigood, associate architect at\u00a0pHp, added: \u201cIt\u2019s not every day you get to work on a building located at the highest point of a city, so the hotel\u2019s visibility from surrounding areas and its ability to provide panoramic views for residents, conference users and the public were key in the design.<\/p>\n<p>\u201cAn extensive stakeholder consultation process has resulted in many exciting practical and aesthetically striking design features.<\/p>\n<p>\u201cHotel La Tour and Winvic have been instrumental in the design reaching RIBA Stage 3\/4 and ensuring the quality expected of the building from the CMKAP \u2018Exceptional Developments\u2019 policy is achieved, whilst also utilising the benefits of 3D <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/uk-bim-journey\/68604\/\" target=\"_blank\" rel=\"noopener noreferrer\">BIM Level 2<\/a> processes.\u201d<\/p>\n<p>It is anticipated practical completion will be reached in 2022.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[428,577,676,997,639],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-77680","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-bim","8":"tag-bim-level-2","9":"tag-construction","10":"tag-development","11":"tag-procurement"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Winvic secures first hotel contract<\/title>\n<meta name=\"description\" content=\"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Winvic secures first hotel contract\" \/>\n<meta property=\"og:description\" content=\"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-16T07:48:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/06\/Winvic-secures-first-hotel-contract.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"924\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Winvic secures first hotel contract\" \/>\n<meta name=\"twitter:description\" content=\"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Winvic secures first hotel contract\",\"datePublished\":\"2020-06-16T07:48:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\"},\"wordCount\":669,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"BIM\",\"BIM Level 2\",\"Construction Processes\",\"Development\",\"Procurement\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\",\"name\":\"Winvic secures first hotel contract\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2020-06-16T07:48:15+00:00\",\"description\":\"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Winvic secures first hotel contract\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Winvic secures first hotel contract","description":"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/","og_locale":"en_US","og_type":"article","og_title":"Winvic secures first hotel contract","og_description":"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-06-16T07:48:15+00:00","og_image":[{"width":768,"height":924,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/06\/Winvic-secures-first-hotel-contract.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Winvic secures first hotel contract","twitter_description":"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Winvic secures first hotel contract","datePublished":"2020-06-16T07:48:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/"},"wordCount":669,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["BIM","BIM Level 2","Construction Processes","Development","Procurement"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/","name":"Winvic secures first hotel contract","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2020-06-16T07:48:15+00:00","description":"Winvic has secured its first hotel contract to deliver a luxury four-star hotel in Milton Keynes which will comprise of 261 bedrooms","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/winvic-hotel-contract\/77680\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Winvic secures first hotel contract"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-02 04:57:27","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/77680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=77680"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/77680\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=77680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=77680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=77680"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=77680"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=77680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}