{"id":81758,"date":"2020-09-01T07:00:40","date_gmt":"2020-09-01T06:00:40","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=81758"},"modified":"2020-08-28T12:13:26","modified_gmt":"2020-08-28T11:13:26","slug":"computational-design-parramatta","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/","title":{"rendered":"Computational design helps deliver Australia\u2019s largest sustainable tower"},"content":{"rendered":"<h2>3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, part of one of the biggest sustainable urban revitalisation projects in Australia<\/h2>\n<p>As part of Western Sydney\u2019s urban renewal initiative, the redevelopment of Parramatta Square will revitalise Australia\u2019s second-oldest city centre to create a vibrant, cosmopolitan precinct. The area will span three hectares and offer 290,000 sq m of premium office space and residential, retail and civic facilities.<\/p>\n<p>At the heart of this urbanisation effort are 6 &amp; 8 Parramatta Square, with 8 Parramatta Square set to be Australia\u2019s largest commercial tower at 55 storeys and 243m in height.<\/p>\n<p>The A$600m iconic project will broaden the city skyline and incorporate cutting-edge, sustainable, world-class design, reflecting the highest standards of global architecture. Award-winning architectural firm Johnson Pilton Walker (JPW) is the lead design firm collaborating with multiple engineering disciplines and consultants.<\/p>\n<p>Located directly adjacent to a major railway station with limited road access, as well as situated in a flood zone close to the Parramatta River, the project required careful <a href=\"https:\/\/www.pbctoday.co.uk\/news\/construction-technology-news\/new-technologies-project-planning\/80146\/\" target=\"_blank\" rel=\"noopener noreferrer\">infrastructure planning<\/a> and design to ensure that building and public domain were seamlessly integrated.<\/p>\n<p>In addition, local authorities imposed strict guidelines to address heritage context, solar access, energy efficiency, sustainability, flexible workspace and pedestrian permeability. The large-scale building form, combined with an expedited timeline, presented a range of design and delivery challenges. To overcome these challenges and meet all project objectives, JPW implemented digital <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/construct-digital-solutions\/65264\/\" target=\"_blank\" rel=\"noopener noreferrer\">BIM solutions<\/a> to streamline workflows and optimise design.<\/p>\n<h3>Advancing BIM through computational design<\/h3>\n<p>From the conceptual design stage, JPW relied on OpenBuildings Designer to model the basement, podium and core according to traditional BIM principles. With much of the conceptual design already completed, the team realised the necessity and benefit of integrating <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/design-for-manufacture-and-assembly\/74186\/\" target=\"_blank\" rel=\"noopener noreferrer\">computational design<\/a> for the geometrically driven design aspects &#8211; including the fa\u00e7ade, tower structure and ceilings &#8211; to advance BIM and workflow efficiencies.<\/p>\n<p>\u201cTypically, computational design is embedded into the project from the concept stage. However, there are still huge efficiencies to be gained by introducing GenerativeComponents later in the documentation process,\u201d explained Sarah Yap, computational design expert at JPW.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81759 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-238x300.jpg\" alt=\"Computational design, Parramatta Square\" width=\"238\" height=\"300\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-238x300.jpg 238w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-768x968.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-813x1024.jpg 813w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-696x877.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-1068x1346.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-333x420.jpg 333w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-1920x2419.jpg 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-610x769.jpg 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1.jpg 1587w\" sizes=\"auto, (max-width: 238px) 100vw, 238px\" \/>To resolve differences between engineering and architectural workflows, JPW relied on the interoperability of <a href=\"https:\/\/www.bentley.com\/en\/products\/product-line\/building-design-software\/openbuildings-designer\" target=\"_blank\" rel=\"noopener noreferrer\">Bentley\u2019s OpenBuildings Designer\u2019s<\/a> built-in GenerativeComponents feature.<\/p>\n<p>When developing the tower structure design, the interoperability of GenerativeComponents with Excel allowed interaction with the tabular structural engineering data for the floors, beams and columns. The team could then use the conditional formatting features in Excel to load, check and generate computational design models for the tower structure. Bentley\u2019s computational design model could be driven by Excel to customise an accelerated and automated workflow for generative and coordination purposes.<\/p>\n<p>All the Excel data for the column height and beams was pulled and imported into OpenBuildings Designer to generate visual 3D models. For the floor slabs, JPW developed a recursive script in OpenBuildings Designer to individually model them, level by level, correctly identifying the placement of services as solids and colour-coding them according to their respective discipline. The result was an automated output of a structural model for each floor comprised of the columns, beams and slabs with all the correct service penetrations.<\/p>\n<p>\u201cThe fa\u00e7ade was another ideal area to incorporate the GenerativeComponents feature in OpenBuildings Designer,\u201d said Yap.<\/p>\n<p>To determine the best balance between new architecture, the surrounding heritage and environment, JPW required iterative flexibility. The team generated multiple variations of the unique panels and fins, accommodating the changing panel radius and varying fin depths. The team used OpenBuildings Designer to generate a unique script that established a polygonal grid as an envelope. The grid encompassed the building where each polygon was parametrically modelled to simplify modification, as well as represented a panel type in the fa\u00e7ade system. By creating an Excel spreadsheet that tied back to the OpenBuildings Designer script, JPW iterated over 8,000 panels across the fa\u00e7ade. The team took each of the panels and applied them to the polygon envelope based on colour, automating and accelerating the generation of a complete fa\u00e7ade model.<\/p>\n<p>This seamless compatibility made it realistic for JPW to model the ceilings to LOD 300, including the lighting fixtures and fittings.<\/p>\n<p>\u201cTypically, modelling the ceilings to this level of detail on a project of this scale would be nearly impossible and certainly unusual. GenerativeComponents [in OpenBuildings Designer] made it realistic for us to fulfil this documentation requirement,\u201d said Yap.<\/p>\n<p>The team used existing data for the fa\u00e7ade boundary, columns and core, subtracting them from the ceiling region to generate a script for the ceilings. Team members then sliced the ceiling model into tiles that corresponded to an Excel spreadsheet containing the lighting data. JPW used the colour-coding method to reference the ceiling lighting layout for the multiple floors. A similar process was used to layout the HVAC diffusers, provided by the mechanical engineer through an IFC model.<\/p>\n<p>Leveraging the algorithm-driven features of OpenBuildings Designer enabled JPW to maximise data potential, developing scripts and performing parametric modelling to automate previously manual processes. The solution streamlined workflows for the tower structure, fa\u00e7ade and ceilings, enabling two people to design and generate data for more than 1,400 tower columns, 8,000 fa\u00e7ade panels and 179,000 ceiling tiles.<\/p>\n<p>Checking and updating the tower columns previously took one person one week; with OpenBuildings Designer, it was completed in one hour. JPW modelled all the fa\u00e7ade panels in less than one hour, compared with two weeks using traditional methods; and one person updated and integrated changes to the fa\u00e7ade model in one day, compared with two people taking an entire week.<\/p>\n<p>Through iterative and automated scripting, the team quickly explored numerous options for shading and solar access to deliver an elegant, energy-efficient fa\u00e7ade and comfortable <a href=\"https:\/\/www.pbctoday.co.uk\/news\/building-control-news\/indoor-humidity-levels\/80049\/\" target=\"_blank\" rel=\"noopener noreferrer\">indoor working environments<\/a>.<\/p>\n<p>Computational design methodologies have been integral to the detailed design development and documentation process of 6 &amp; 8 Parramatta Square. Combining parametric and rule-based design optimised digital workflows while maintaining flexibility and rigour across the project. Bentley\u2019s integrated design solution facilitated accurate building design, including input and changes from contractors.<\/p>\n<p>Modelling the objects familiarised JPW with the spatial implications that are important to architectural design. By integrating colour-coding for visual differentiation and scripting failure mechanisms into the data flow, JPW automated design verification, replacing manual methods of error-checking and eliminating the risk of human error. Over the entire project period, JPW achieved significant time and cost savings, as well as optimised design outcomes to meet all planning and sustainability goals. The building will be efficient in terms of energy, waste, materials, indoor environment and water. The building will have usable and inviting civic spaces, showcasing the next generation of green buildings of this size and scale.<\/p>\n<h3>Digital twin facilitates design coordination<\/h3>\n<p>JPW used OpenBuildings Designer to establish a connected data environment to facilitate integrated design by implementing a digital twin. Creating a digital twin was fundamental to understanding the project\u2019s design and development. JPW relied heavily on digital data provided from all services and structural engineering consultants. Therefore, it needed to ensure that these models and their documentation methodology were aligned with the architecture. Using the digital twin as an architectural control model to reference multidiscipline data, JPW tested design alternatives to determine the architectural impact that enabled the resolution of complex spatial parameters and clashes. Working with the integrated 3D model allowed the architects to identify and timely resolve inconsistencies, mitigating any negative financial and architectural impact, and avoiding rework.<\/p>\n<p>The digital twin helped JPW seamlessly and timely exchange data and models in formats accessible to all project participants. Bentley\u2019s 3D digital application facilitated the generation of 2D drawings and documentation directly from the model, streamlining both office workflows and coordination processes between architects, contractors and consultants. Using the digital twin from conceptual design through construction defined the collaborative methodology, helping arrive at a design solution that celebrates the architectural vision while meeting client requirements and the project\u2019s ecologically sustainable goals.<\/p>\n<p>\u201cWithout the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/construction-technology-news\/approach-to-digital-twins\/68463\/\" target=\"_blank\" rel=\"noopener noreferrer\">digital twin<\/a>, the project would not be able to be delivered,\u201d said Victor Au, architect with JPW.<\/p>\n<h3>Shifting perspective on architectural design<\/h3>\n<p>Architects often spend a disproportionate amount of time trying to represent solutions rather than actually designing them. Computational design allowed JPW to focus on resolving problems and finding better design solutions to deliver 6 &amp; 8 Parramatta Square. While scripting in OpenBuildings Designer was a time investment, within only eight months JPW realised the rewards, saving countless hours and significant costs. In the past, it would have been inconceivable to design from an Excel spreadsheet. However, the success of this project has shifted the perspective on design, encouraging JPW to adapt this solution on future projects, reaping the benefits and optimising delivery.<\/p>\n<p>\u201cComputational design empowers us to rethink our approach and, ultimately, the way that we design our architecture, shifting the way our studio thinks about our practice in the future,\u201d said Yap.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Wayne Dickerson<\/strong><\/p>\n<p>Principal<\/p>\n<p>JPW<\/p>\n<p>+61 2 9259 5900<\/p>\n<p><a href=\"http:\/\/www.jpw.com.au\" target=\"_blank\" rel=\"noopener noreferrer\">www.jpw.com.au<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Bentley Systems<\/strong><\/p>\n<p>+44 (0)808 101 9247<\/p>\n<p><a href=\"http:\/\/www.bentley.com\" target=\"_blank\" rel=\"noopener noreferrer\">www.bentley.com<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, part of one of the biggest sustainable urban revitalisation projects in Australia.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[305,141293],"tags":[702,428,66772,817,574,688,172720,579,943],"stakeholder_rel_tag":[172387],"contributor_rel_tag":[],"class_list":{"0":"post-81758","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-bim-news","7":"category-digital-construction-news","8":"tag-architecture","9":"tag-bim","10":"tag-bim-today-september-2020","11":"tag-bim-workflow","12":"tag-data-management","13":"tag-digital-construction","14":"tag-digital-twins","15":"tag-infrastructure","16":"tag-sh-bentley-systems","17":"stakeholder_rel_tag-bentley-systems"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Computational design helps deliver Australia\u2019s largest sustainable tower<\/title>\n<meta name=\"description\" content=\"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, one of the biggest urban revitalisation projects in Australia\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Computational design helps deliver Australia\u2019s largest sustainable tower\" \/>\n<meta property=\"og:description\" content=\"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, part of one of the biggest sustainable urban revitalisation projects in Australia\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-01T06:00:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1246\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Computational design helps deliver Australia\u2019s largest sustainable tower\" \/>\n<meta name=\"twitter:description\" content=\"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, part of one of the biggest sustainable urban revitalisation projects in Australia\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Computational design helps deliver Australia\u2019s largest sustainable tower\",\"datePublished\":\"2020-09-01T06:00:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\"},\"wordCount\":1500,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-238x300.jpg\",\"keywords\":[\"Architecture\",\"BIM\",\"BIM Today September 2020\",\"BIM Workflow\",\"Data Management\",\"Digital Construction\",\"Digital Twins\",\"Infrastructure\",\"SH Bentley Systems\"],\"articleSection\":[\"BIM News\",\"Digital Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\",\"name\":\"Computational design helps deliver Australia\u2019s largest sustainable tower\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-238x300.jpg\",\"datePublished\":\"2020-09-01T06:00:40+00:00\",\"description\":\"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, one of the biggest urban revitalisation projects in Australia\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1.jpg\",\"width\":1587,\"height\":2000,\"caption\":\"Computational design, Parramatta Square\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Computational design helps deliver Australia\u2019s largest sustainable tower\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Computational design helps deliver Australia\u2019s largest sustainable tower","description":"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, one of the biggest urban revitalisation projects in Australia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/","og_locale":"en_US","og_type":"article","og_title":"Computational design helps deliver Australia\u2019s largest sustainable tower","og_description":"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, part of one of the biggest sustainable urban revitalisation projects in Australia","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-09-01T06:00:40+00:00","og_image":[{"width":2000,"height":1246,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Computational design helps deliver Australia\u2019s largest sustainable tower","twitter_description":"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, part of one of the biggest sustainable urban revitalisation projects in Australia","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Computational design helps deliver Australia\u2019s largest sustainable tower","datePublished":"2020-09-01T06:00:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/"},"wordCount":1500,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-238x300.jpg","keywords":["Architecture","BIM","BIM Today September 2020","BIM Workflow","Data Management","Digital Construction","Digital Twins","Infrastructure","SH Bentley Systems"],"articleSection":["BIM News","Digital Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/","name":"Computational design helps deliver Australia\u2019s largest sustainable tower","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1-238x300.jpg","datePublished":"2020-09-01T06:00:40+00:00","description":"3D BIM modelling and a digital twin are supporting the delivery of 6-8 Parramatta Square, one of the biggest urban revitalisation projects in Australia","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/08\/Computational-design-Parramatta-Square-1.jpg","width":1587,"height":2000,"caption":"Computational design, Parramatta Square"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/computational-design-parramatta\/81758\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Computational design helps deliver Australia\u2019s largest sustainable tower"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-11 19:11:05","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/81758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=81758"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/81758\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=81758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=81758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=81758"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=81758"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=81758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}