{"id":81868,"date":"2020-09-02T11:15:43","date_gmt":"2020-09-02T10:15:43","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=81868"},"modified":"2020-09-02T11:15:43","modified_gmt":"2020-09-02T10:15:43","slug":"environmental-risks-in-construction-projects","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/","title":{"rendered":"Environmental risks in construction projects"},"content":{"rendered":"<h2>From location to geospatial systems, Piers Edgell, account director at <a href=\"https:\/\/www.landmark.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Landmark Information<\/a> explores the considerations of environmental risks in construction projects<\/h2>\n<p>For new construction projects, the location has of course always been a crucial element. By this, I don\u2019t just mean the actual geographic position but its locational context in relation to neighbouring surroundings and the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-land\/79493\/\" target=\"_blank\" rel=\"noopener noreferrer\">physical environment<\/a>. Advances in geospatial systems and data are continually revealing new insights about the spaces we live, work and invest in.<\/p>\n<p>For a development design to truly come to life, there must be continuity between the virtual concept and the reality of what is possible \u2013 both from a physical and financial point of view \u2013 and it is this vital role that planners, architects, surveyors, engineers, geotechnical and geomatics professionals adopt.<\/p>\n<p>Data intelligence is a key linchpin to any project\u2019s success. When armed with the power of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/promap-location-intelligence\/76774\/\" target=\"_blank\" rel=\"noopener noreferrer\">location data<\/a>, the right decisions can be made at every stage to understand &#8211; and overcome &#8211; any risks that are presented. And, by representing risks geospatially is how we can start to overcome them.<\/p>\n<p>It falls to construction, architectural, engineering and development firms on making the land \u2018work\u2019 for development purposes. Therefore, ensuring that the appropriate due diligence has been undertaken regarding environmental factors at the outset could save a lot of costly surprises in the long-run.<\/p>\n<p>It is also important to understand any former usage of the site to assess whether there is the potential for any contaminants to be present, and if so, whether any special measures or remediation is required ahead of development.<\/p>\n<p>Having access to a wealth of digital data that can be scrutinised online as part of a project will therefore provide contextual information relating to the physical surroundings of the area. This could include assessing current and historic maps, land use constraints information, <a href=\"https:\/\/www.landmark.co.uk\/news-archive\/landmark-announces-%E2%80%98more-mapping-less%E2%80%99-following-launch-os%E2%80%99-geospatial-data-platform\" target=\"_blank\" rel=\"noopener noreferrer\">geological data<\/a>, and historical land features, through to local plans, planning applications, and environmental data &#8211; such as flood risk or ground stability analysis.<\/p>\n<p>By doing so, you are less likely to discover \u2018the unknown\u2019 too late into the land acquisition, assessment or subsequent construction process, and can adapt designs, plans or undertake further investigations as needed, without unnecessarily creating delays.<\/p>\n<p>What should you consider?<\/p>\n<h3>Flooding<\/h3>\n<p>Having insight into flood risk \u2013 both now and in the future is increasingly important as we are experiencing wetter winters and increased incidences of extreme weather conditions.<\/p>\n<p>The extent of flood risk modelling techniques provide an overview of extents, depths and flow directions to support planning and range across flood sources; groundwater, surface water, river or coastal.<\/p>\n<p>But a look to the future is crucial within our planning processes. The first national flood map for climate change is also available, which provides probabilistic climate predictions in order to model future flood risk as far ahead as the 2080s. This includes <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/national-flood-map\/68055\/\" target=\"_blank\" rel=\"noopener noreferrer\">future flood maps<\/a>, predictions of erosion, and the future risk to transport, all of which help towards planning sustainable and future-proofed developments.<\/p>\n<h3>Ground stability<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81871 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-300x200.jpg 300w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-768x512.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-1024x683.jpg 1024w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-696x464.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-1068x712.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-630x420.jpg 630w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-1920x1280.jpg 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-610x407.jpg 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash.jpg 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Although not necessarily apparent to the naked eye, it pays to check whether the location has been subject to any historical activities that may have created potential <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risk-assessments-2\/61206\/\" target=\"_blank\" rel=\"noopener noreferrer\">environmental risk<\/a>.<\/p>\n<p>For example, any manmade shafts, pits, tunnels or such subterranean features which may have been created as a result of historical mining or quarry activities.<\/p>\n<p>Reviewing historic data with local records will provide a good indication, while also taking into consideration the land\u2019s geology to understand any natural land movement or subsidence risks.<\/p>\n<h3>Contaminated land<\/h3>\n<p>Sources of contamination can vary greatly, including some naturally occurring substances such as radon, arsenic or lead, through to the legacy of our industrial past. Suggestions include former service stations, landfill sites, dry cleaning factories, gas works or waste disposal.<\/p>\n<p>Common examples of contaminants include asbestos, heavy metals in the soil, arsenic in wastes from gas works and chemical solvents polluting aquifers used as a drinking water supply.<\/p>\n<p>Any disturbance to the land may result in dormant substances coming to the fore and potentially creating a hazard to public health, ecosystems, wildlife, water sources or even carrying a environmental risk of fire or explosion, with resulting litigation or clean-up costs.\u00a0 As such, upfront data analysis is paramount.<\/p>\n<p>With the <a href=\"https:\/\/www.legislation.gov.uk\/ukpga\/1990\/43\/contents\" target=\"_blank\" rel=\"noopener noreferrer\">Environmental Protection Act 1990<\/a> legislation, local councils and landowners are required to readily provide more information, meaning it is now becoming easier to uncover details relating to former land usage.<\/p>\n<p>All local councils have an obligation to keep a \u2018<a href=\"https:\/\/www.gov.uk\/contaminated-land\" target=\"_blank\" rel=\"noopener noreferrer\">Contaminated Land Register<\/a>\u2019, which should include remediation notices, remediation declarations\/statements, appeals against Notices, designation of special sites, notification of Claimed Remediation, and details of any convictions for related offences.<\/p>\n<p>The Environment Agency also has responsibility to oversee \u2018special sites\u2019 that are considered \u2018heavily contaminated\u2019. A helpful guidance paper has been produced that includes a detailed workflow of the steps that should be taken, from <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/landmark-environmental-evaluations\/81237\/\" target=\"_blank\" rel=\"noopener noreferrer\">risk assessment<\/a> through to audit and remediation.<\/p>\n<p>By accessing historical <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/landmark-geospatial-data\/80725\/\" target=\"_blank\" rel=\"noopener noreferrer\">mapping data<\/a>, you can quickly identify former industrial buildings, quarries, landfill, worksites, gasworks or similar. By analysing these with current maps and aerial views you instantly visualise how a site has changed.<\/p>\n<h3>Unexploded ordnance<\/h3>\n<p>Although the potential risk of Unexploded Ordnance (UXO) may be considered small, the safety of the team involved on any project \u2013 not to mention the neighbouring population \u2013 is a priority.<\/p>\n<p>Preliminary risk assessments calculate the probability of unearthing explosive remnants at a given location. Such desktop reports search through a wide range of maps and datasets to determine the risk of encountering UXO, including researching bomb census maps, bomb damage maps, Luftwaffe reconnaissance photographs, post-War RAF aerial photographs, plus mapping key locations of historical explosive manufacturing sites, military areas, and WWII bombing decoy sites, to name just a few.<\/p>\n<p>If further investigation is needed, a second digital assessment \u2013 a \u2018Detailed UXO Risk Assessment\u2019 \u2013 can then be undertaken, providing more quantifiable risk assessment that takes into account the probability of the threat and the potential consequences.<\/p>\n<p>The extent of the data offered in the assessment report provides a solid basis on which to form an approach and to commence any action, as needed.<\/p>\n<h3>Mining risk<\/h3>\n<p>Did you know that in 2019, almost a quarter (23%) of property transactions took place in a coal affected area? Data shows that in fact over 10 million properties are situated in a coalfield area, representing 27.4% of all properties in GB. This is higher than many people would realise and of course the risks posed by this include the potential for future subsidence.<\/p>\n<p>Data is today available that enables full and thorough due diligence checks to assess if a given address or site location has the potential to be within a mining risk zone.<\/p>\n<h3>Underground assets<\/h3>\n<p>Understanding the features that lie below the surface is crucial before any excavations, designs or developments commence. The last thing you want to do when breaking new ground at a site is to disturb any utility infrastructure hidden below the surface. Utilities-based searches are therefore available which provide details of gas and oil pipelines, electricity cables, telecommunication wires, mains water supplies, sewers and fibre-optic cables, to name a few.<\/p>\n<p>Today, the wealth of data available combined with sophisticated online tools and GIS, enables us to have greater intelligence on any plot of land than ever before. And, with responsibility ultimately falling at the feet of developers to ensure that a planned project is viable, safe and the land is appropriate for its intended use, it is crucial that the right data is assessed at the outset to identify any hidden environmental risks so appropriate measures are undertaken at the outset.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81869 alignright\" src=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-225x300.jpg 225w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-768x1024.jpg 768w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-696x928.jpg 696w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-1068x1424.jpg 1068w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-315x420.jpg 315w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-1920x2560.jpg 1920w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res-610x813.jpg 610w, https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/PiersEdgell_Landmark_High-Res.jpg 1500w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Piers Edgell<\/strong><\/p>\n<p>Account director \u2013 Environment &amp; mapping<\/p>\n<p><a href=\"https:\/\/www.landmark.co.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Landmark Information<\/a><\/p>\n<p><a href=\"http:\/\/www.landmark.co.uk\" target=\"_blank\" rel=\"noopener noreferrer\">www.landmark.co.uk<\/a><\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>From location to geospatial systems, Piers Edgell, account director at Landmark Information explores the considerations of environmental risks in construction projects.<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[304],"tags":[702,676,574,997,636,279,595,851,725,952,567,850,847],"stakeholder_rel_tag":[172467],"contributor_rel_tag":[],"class_list":{"0":"post-81868","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-planning-construction-news","7":"tag-architecture","8":"tag-construction","9":"tag-data-management","10":"tag-development","11":"tag-engineering","12":"tag-environment","13":"tag-flood-resilience","14":"tag-flooding","15":"tag-geospatial-mapping","16":"tag-planning","17":"tag-planning-system","18":"tag-risk-assessment","19":"tag-sh-landmark","20":"stakeholder_rel_tag-landmark"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Environmental risks in construction projects<\/title>\n<meta name=\"description\" content=\"From location to geospatial systems, Piers Edgell at Landmark Information explores the considerations of environmental risks in construction projects\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Environmental risks in construction projects\" \/>\n<meta property=\"og:description\" content=\"From location to geospatial systems, Piers Edgell at Landmark Information explores the considerations of environmental risks in construction projects\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-02T10:15:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Flooding_andy-falconer-_fRVIbJ-EMM-unsplash.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"982\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Elisha Sketchley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PBC_Today\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\"},\"author\":{\"name\":\"Elisha Sketchley\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\"},\"headline\":\"Environmental risks in construction projects\",\"datePublished\":\"2020-09-02T10:15:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\"},\"wordCount\":1274,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-300x200.jpg\",\"keywords\":[\"Architecture\",\"Construction Processes\",\"Data Management\",\"Development\",\"Engineering\",\"Environment\",\"Flood Resilience\",\"Flooding\",\"Geospatial Mapping\",\"Planning\",\"Planning System\",\"Risk Assessment\",\"SH Landmark\"],\"articleSection\":[\"Planning &amp; Construction News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\",\"name\":\"Environmental risks in construction projects\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-300x200.jpg\",\"datePublished\":\"2020-09-02T10:15:43+00:00\",\"description\":\"From location to geospatial systems, Piers Edgell at Landmark Information explores the considerations of environmental risks in construction projects\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash.jpg\",\"width\":2000,\"height\":1333},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Environmental risks in construction projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580\",\"name\":\"Elisha Sketchley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g\",\"caption\":\"Elisha Sketchley\"},\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Environmental risks in construction projects","description":"From location to geospatial systems, Piers Edgell at Landmark Information explores the considerations of environmental risks in construction projects","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/","og_locale":"en_US","og_type":"article","og_title":"Environmental risks in construction projects","og_description":"From location to geospatial systems, Piers Edgell at Landmark Information explores the considerations of environmental risks in construction projects","og_url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-09-02T10:15:43+00:00","og_image":[{"width":2000,"height":982,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Flooding_andy-falconer-_fRVIbJ-EMM-unsplash.jpg","type":"image\/jpeg"}],"author":"Elisha Sketchley","twitter_card":"summary_large_image","twitter_creator":"@PBC_Today","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/"},"author":{"name":"Elisha Sketchley","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580"},"headline":"Environmental risks in construction projects","datePublished":"2020-09-02T10:15:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/"},"wordCount":1274,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-300x200.jpg","keywords":["Architecture","Construction Processes","Data Management","Development","Engineering","Environment","Flood Resilience","Flooding","Geospatial Mapping","Planning","Planning System","Risk Assessment","SH Landmark"],"articleSection":["Planning &amp; Construction News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/","url":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/","name":"Environmental risks in construction projects","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash-300x200.jpg","datePublished":"2020-09-02T10:15:43+00:00","description":"From location to geospatial systems, Piers Edgell at Landmark Information explores the considerations of environmental risks in construction projects","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#primaryimage","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/09\/Construction_troy-mortier-dorQsImuoPU-unsplash.jpg","width":2000,"height":1333},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/environmental-risks-in-construction-projects\/81868\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Environmental risks in construction projects"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/4ae66827b33682426f672d214cdd7580","name":"Elisha Sketchley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30054ee50e4135840aa91decc99b14268d346fcf23e3f41d0ecfe6c19255e936?s=96&d=mm&r=g","caption":"Elisha Sketchley"},"sameAs":["https:\/\/www.pbctoday.co.uk"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/elishasketchley\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 09:16:33","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/81868","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=81868"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/81868\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=81868"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=81868"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=81868"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=81868"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=81868"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}