{"id":84332,"date":"2020-10-26T08:02:36","date_gmt":"2020-10-26T08:02:36","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=84332"},"modified":"2020-10-26T08:02:36","modified_gmt":"2020-10-26T08:02:36","slug":"hs2-second-modular-bridge","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/","title":{"rendered":"Second modular bridge craned into place on HS2"},"content":{"rendered":"<h2>The second of four modular bridges has been moved into place in just 45 minutes on <a href=\"https:\/\/www.hs2.org.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">HS2\u2019s<\/a> new Interchange Station<\/h2>\n<p>The new <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/hs2-modular-bridge\/80678\/\" target=\"_blank\" rel=\"noopener noreferrer\">modular bridge<\/a> will carry the A452 and form part of a major remodelling of the local road network.<\/p>\n<p>It will improve the circulation of traffic around the UK\u2019s HS2 scheme, integrating the existing network with the new Interchange Station.<\/p>\n<p>The bridge move was led by engineering contractor Expanded and HS2 enabling works contractor, <a href=\"https:\/\/www.laingorourke.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Laing O\u2019Rourke<\/a> and <a href=\"https:\/\/www.murphygroup.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">J. Murphy &amp; Sons<\/a> Joint Venture (LMJV).<\/p>\n<p>Also assisting the process, a design joint venture involving WSP and Ramboll provided engineering and environmental services.<\/p>\n<p>By applying advanced digital capabilities to design all elements of the structure in a virtual world, they determined that the A446 road modular bridge would be built using a <a href=\"https:\/\/www.pbctoday.co.uk\/news\/construction-technology-news\/dfma-and-digital-delivery\/84072\/\" target=\"_blank\" rel=\"noopener noreferrer\">Design for Manufacture and Assembly<\/a> (DfMA) strategy.<\/p>\n<p>After building the bridge in modular sections, the final part of this process was the 128-wheel hydraulic platform taking just 45 minutes to move the bridge span 150 metres, where it was lowered onto the DfMA abutment shells to complete the overall bridge structure.<\/p>\n<p>Traditional construction methods would have required several weeks of lane closures on both carriageways, followed by additional weekend and overnight closures.<\/p>\n<h3>\u201824 hours ahead of schedule\u2019<\/h3>\n<p>David Bennett, delivery director at HS2, said: \u201cAs work ramps up at one of HS2\u2019s largest construction sites, it was fantastic to see this next milestone achieved so quickly.<\/p>\n<p>\u201cIt was finished 24 hours ahead of schedule and follows hot on the heels of the installation of the bridge over the M42 in August, which was also completed early.<\/p>\n<p>\u201cWe\u2019re pleased to see innovations like this on the project dramatically reducing environmental impacts and disruption for road users.<\/p>\n<p>\u201cWith construction of the railway now well underway, 22,000 jobs being created and an estimated 400,000 supply chain contracts available, HS2 is playing a pivotal role in helping <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/recovery-from-covid-19\/79736\/\" target=\"_blank\" rel=\"noopener noreferrer\">Britain\u2019s economic recovery<\/a>.\u201d<\/p>\n<p>Jon England, project director at DJV, commented: \u201cOur successful partnership approach has led to the design and construction of HS2\u2019s first permanent bridges including one over the M42, the A452 bridge over the A446, as well as two other bridges over what will be the main HS2 railway line adjacent to the new HS2 Interchange Station.<\/p>\n<p>\u201cWe are proud that through collaboration with LM JV, Highways England and local authorities, the application of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/guides-reviews\/highway-design-and-3d-modelling-2\/38399\/\" target=\"_blank\" rel=\"noopener noreferrer\">3D modelling<\/a> techniques to align highways, earthworks, structures and utilities with the existing infrastructure and the innovative use of offsite manufacturing and Design for Manufacturing and Assembly techniques, we were able to safely deliver on this ground-breaking project.\u201d<\/p>\n<h3>\u2018The future of bridge design and delivery\u2019<\/h3>\n<p>Richard Fairhurst, LM senior project manager, added: \u201cDigital design, <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/offsite-manufacturing\/70821\/\" target=\"_blank\" rel=\"noopener noreferrer\">offsite manufacturing<\/a> and modular components are the enablers of innovative construction methodology \u2013 they bring greater efficiency and safety to major infrastructure projects like this, and importantly, can save months on delivery schedules.<\/p>\n<p>\u201cThat\u2019s great news for clients, stakeholders and local communities alike. This is the future of bridge design and delivery.\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The second of four modular bridges has been moved into place in just 45 minutes on HS2\u2019s new Interchange Station.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[676,473,579,916,627,696,928],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-84332","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-construction","8":"tag-hs2","9":"tag-infrastructure","10":"tag-modern-methods-of-construction","11":"tag-modular-construction","12":"tag-offsite-construction","13":"tag-rail-network"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Second modular bridge craned into place on HS2<\/title>\n<meta name=\"description\" content=\"The second of four modular bridges has been moved into place in just 45 minutes on High Speed 2\u2019s new Interchange Station\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Second modular bridge craned into place on HS2\" \/>\n<meta property=\"og:description\" content=\"The second of four modular bridges has been moved into place in just 45 minutes on HS2\u2019s new Interchange Station\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-26T08:02:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/10\/HS2-VL-19336-IMG_1498.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Second modular bridge craned into place on HS2\" \/>\n<meta name=\"twitter:description\" content=\"The second of four modular bridges has been moved into place in just 45 minutes on HS2\u2019s new Interchange Station\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Second modular bridge craned into place on HS2\",\"datePublished\":\"2020-10-26T08:02:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\"},\"wordCount\":504,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Construction Processes\",\"HS2\",\"Infrastructure\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\",\"Rail Network\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\",\"name\":\"Second modular bridge craned into place on HS2\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2020-10-26T08:02:36+00:00\",\"description\":\"The second of four modular bridges has been moved into place in just 45 minutes on High Speed 2\u2019s new Interchange Station\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Second modular bridge craned into place on HS2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Second modular bridge craned into place on HS2","description":"The second of four modular bridges has been moved into place in just 45 minutes on High Speed 2\u2019s new Interchange Station","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/","og_locale":"en_US","og_type":"article","og_title":"Second modular bridge craned into place on HS2","og_description":"The second of four modular bridges has been moved into place in just 45 minutes on HS2\u2019s new Interchange Station","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-10-26T08:02:36+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/10\/HS2-VL-19336-IMG_1498.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Second modular bridge craned into place on HS2","twitter_description":"The second of four modular bridges has been moved into place in just 45 minutes on HS2\u2019s new Interchange Station","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Second modular bridge craned into place on HS2","datePublished":"2020-10-26T08:02:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/"},"wordCount":504,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Construction Processes","HS2","Infrastructure","Modern Methods of Construction","Modular Construction","Offsite Construction","Rail Network"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/","name":"Second modular bridge craned into place on HS2","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2020-10-26T08:02:36+00:00","description":"The second of four modular bridges has been moved into place in just 45 minutes on High Speed 2\u2019s new Interchange Station","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hs2-second-modular-bridge\/84332\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Second modular bridge craned into place on HS2"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-03 20:28:39","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/84332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=84332"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/84332\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=84332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=84332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=84332"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=84332"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=84332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}