{"id":85990,"date":"2020-11-30T14:48:50","date_gmt":"2020-11-30T14:48:50","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=85990"},"modified":"2020-11-30T14:48:50","modified_gmt":"2020-11-30T14:48:50","slug":"hammersmith-bridge-refurbishment","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/","title":{"rendered":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge"},"content":{"rendered":"<h2><a href=\"https:\/\/www.fosterandpartners.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Foster + Partners<\/a> has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London<\/h2>\n<p>The plan which has been presented to the <a href=\"https:\/\/www.lbhf.gov.uk\/\" target=\"_blank\" rel=\"noopener noreferrer\">Hammersmith &amp; Fulham Council<\/a> envisages pedestrians, cyclists and, potentially, motor vehicles being able to use Hammersmith Bridge during its repair and restoration.<\/p>\n<h3>Hammersmith Bridge design<\/h3>\n<p>A new raised truss structure would be built above the existing road deck, featuring a lower level for pedestrians and cyclists and an upper level for cars and buses.<\/p>\n<p>The raised deck would enable existing approach routes for traffic to be used, causing minimum disruption for residents on both banks of the river.<\/p>\n<p>The structure will also provide <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/allplan-bridge-software-bim\/57500\/\" target=\"_blank\" rel=\"noopener noreferrer\">support for the bridge<\/a> as well as a safe platform for restoration work to be carried out.<\/p>\n<p>The new truss structure would be assembled in two halves and launched from each side over the existing road surface. It will be supported on each bank and at the two existing piers. As a result, there will be no added load on the existing bridge deck.<\/p>\n<p>Elements of the grade II listed bridge that need repair, including pedestals, anchors and chains, would be lifted away and transported by barges to an offsite facility for safe <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/restoring-historic-buildings\/61212\/\" target=\"_blank\" rel=\"noopener noreferrer\">repair and restoration<\/a>.<\/p>\n<p>Contractors would use the new lower pedestrian deck to access the works. When completed, the temporary raised deck would be removed.<\/p>\n<p>By repairing the <a href=\"https:\/\/www.pbctoday.co.uk\/news\/modular-construction-news\/hs2-second-modular-bridge\/84332\/\" target=\"_blank\" rel=\"noopener noreferrer\">bridge offsite<\/a>, the huge task of restoration can be done at greater speed, to a higher level and at significantly reduced cost.<\/p>\n<p>It would also minimise noise, environmental impact and onsite activity, as well as reducing the all-important carbon footprint of the works.<\/p>\n<p>The proposal has been further advanced working in partnership with bridge engineers COWI who has expertise in the refurbishment of existing structures.<\/p>\n<h3>\u2018Safer and more controlled\u2019 refurbishment<\/h3>\n<p>Luke Fox, senior executive partner at Foster + Partners, said: \u201cWe are excited to propose this simple solution to what is an important missing piece of London\u2019s infrastructure that also gives the opportunity to bring back to life a beautiful and iconic bridge by Sir Joseph Bazalgette.\u201d<\/p>\n<p>Roger Ridsdill Smith, head of structural engineering at Foster + Partners, commented: \u201cWe believe that our concept resolves the two challenges for Hammersmith Bridge economically and efficiently: delivering a temporary crossing quickly, whilst providing a safe support to access and refurbish the existing bridge.<\/p>\n<p>\u201cWe appreciate the engagement and contribution from the technical experts and committees in charge of the bridge and look forward to further studies to develop the scheme.\u201d<\/p>\n<p>David MacKenzie, executive director at COWI, added: \u201cWe consider that this approach is practical and viable.<\/p>\n<p>\u201cOur experience is that offsite refurbishment of <a href=\"https:\/\/www.pbctoday.co.uk\/news\/planning-construction-news\/sustainable-bridge-construction\/83045\/\" target=\"_blank\" rel=\"noopener noreferrer\">bridge structures<\/a> is safer and more controlled, and results in a higher quality final outcome when the structure is re-installed.\u201d<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[942],"tags":[702,676,579,916,627,696,928],"stakeholder_rel_tag":[],"contributor_rel_tag":[],"class_list":{"0":"post-85990","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-mmc-news","7":"tag-architecture","8":"tag-construction","9":"tag-infrastructure","10":"tag-modern-methods-of-construction","11":"tag-modular-construction","12":"tag-offsite-construction","13":"tag-rail-network"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge<\/title>\n<meta name=\"description\" content=\"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge\" \/>\n<meta property=\"og:description\" content=\"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-30T14:48:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/11\/Plans-unveiled-for-\u2018double-decker-crossing\u2019-over-Hammersmith-Bridge-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"828\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge\" \/>\n<meta name=\"twitter:description\" content=\"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge\",\"datePublished\":\"2020-11-30T14:48:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\"},\"wordCount\":471,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Architecture\",\"Construction Processes\",\"Infrastructure\",\"Modern Methods of Construction\",\"Modular Construction\",\"Offsite Construction\",\"Rail Network\"],\"articleSection\":[\"MMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\",\"name\":\"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2020-11-30T14:48:50+00:00\",\"description\":\"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge","description":"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/","og_locale":"en_US","og_type":"article","og_title":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge","og_description":"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London","og_url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2020-11-30T14:48:50+00:00","og_image":[{"width":1200,"height":828,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2020\/11\/Plans-unveiled-for-\u2018double-decker-crossing\u2019-over-Hammersmith-Bridge-1.png","type":"image\/png"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge","twitter_description":"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge","datePublished":"2020-11-30T14:48:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/"},"wordCount":471,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Architecture","Construction Processes","Infrastructure","Modern Methods of Construction","Modular Construction","Offsite Construction","Rail Network"],"articleSection":["MMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/","url":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/","name":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2020-11-30T14:48:50+00:00","description":"Foster + Partners has developed a new plan to build a temporary double-decker crossing within the existing structure of Hammersmith Bridge in London","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/mmc-news\/hammersmith-bridge-refurbishment\/85990\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Plans unveiled for \u2018double-decker crossing\u2019 over Hammersmith Bridge"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-04 07:49:38","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/85990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=85990"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/85990\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=85990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=85990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=85990"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=85990"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=85990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}