{"id":87341,"date":"2021-01-13T10:32:17","date_gmt":"2021-01-13T10:32:17","guid":{"rendered":"https:\/\/www.pbctoday.co.uk\/news\/?p=87341"},"modified":"2023-06-20T17:08:33","modified_gmt":"2023-06-20T16:08:33","slug":"scia-hracholusky-reservoir","status":"publish","type":"post","link":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/","title":{"rendered":"Case study: Replacement bridge over the Hracholusky reservoir"},"content":{"rendered":"<h2>Structural engineering software specialist,\u00a0<a href=\"https:\/\/www.scia.net\/en\" target=\"_blank\" rel=\"noopener noreferrer\">SCIA Engineer<\/a>\u00a0assists the complex analysis of a difficult construction process on the replacement bridge over the Hracholusky Reservoir<\/h2>\n<p><strong>Software:\u00a0<\/strong><a href=\"https:\/\/www.scia.net\/en\/software\/scia-engineer\" target=\"_blank\" rel=\"noopener noreferrer\">SCIA Engineer<\/a><\/p>\n<p><strong>Construction End Date:\u00a0<\/strong>Apr-2019<\/p>\n<p><strong>Country:\u00a0<\/strong>Czech Republic<\/p>\n<p>The bridge over the Hracholusky reservoir near the city of Plze\u0148 is a single-track railway bridge of 5 spans that was constructed in 1901. The 1st and the 5th spans are stone arches and the 2nd, 3rd and 4th spans are identical simply supported rivetted steel arch trusses with a top bridge deck.<\/p>\n<p>Due to extensive corrosion, the steel trusses had to be replaced in 2018-2019. The new steel superstructure is also a steel truss with a top bridge deck to resemble the original bridge. The replacement itself was a challenging task. Due to difficult accessibility from below the bridge, an innovative approach was applied. The spans were replaced one-by-one. For each span a new truss was pre-assembled and, in an upside-down position, moved onto the existing one. Then, the new and old trusses were clamped together and rotated around the longitudinal axis.<\/p>\n<p>The structural model was created from a detailed Tekla file that was, after some modifications, imported to SCIA\u00a0Engineer\u2019s <a href=\"https:\/\/www.pbctoday.co.uk\/news\/bim-news\/structural-engineering-software-2\/86908\/\" target=\"_blank\" rel=\"noopener noreferrer\">structural engineering software<\/a>. The project had a very tight deadline and therefore the work was split in between 2 teams \u2013 the first one designed the connection between the original and the new bridge and the second team designed the rotation mechanism.\u00a0Changes from both teams were merged together using SCIA\u00a0Engineer\u2019s Table Input.<\/p>\n<p>Construction stages were defined by the fact that most structural elements in the model rotated (around the bridge longitudinal axis). Therefore,\u00a0multiple models for the most important stages\u00a0were created for the final assessment. To analyse the rotation-mechanism,\u00a0non-linear hinges, general plasticity and stability analysis were used.<\/p>\n<div class=\"youtube-embed\" data-video_id=\"1mQy8Vz1zTA\"><iframe loading=\"lazy\" title=\"SCIA User Contest 2020 - Winner - Civil Structures\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/1mQy8Vz1zTA?feature=oembed&#038;enablejsapi=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen><\/iframe><\/div>\n<p>&#8220;Complex analysis of a difficult construction process. Perfect usage of most possibilities available in <a href=\"https:\/\/www.pbctoday.co.uk\/news\/tag\/sh-scia\/\" target=\"_blank\" rel=\"noopener noreferrer\">SCIA\u00a0Engineer<\/a>.&#8221; \u2013 <strong>Quote of the Jury<\/strong><\/p>\n<p><strong>This project is the winner of the SCIA User Contest 2020<\/strong>\u00a0\u2013 Category 2, Civil Structures.<\/p>\n<div class=\"mk-custom-module-container\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Structural engineering software specialist,\u00a0SCIA Engineer\u00a0assists the complex analysis of a difficult construction process on the replacement bridge over the Hracholusky Reservoir.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[172736],"tags":[91241,636,78277],"stakeholder_rel_tag":[172512],"contributor_rel_tag":[],"class_list":{"0":"post-87341","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-construction-software-news","7":"tag-bridge-construction","8":"tag-engineering","9":"tag-sh-scia","10":"stakeholder_rel_tag-scia"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Case study: Replacement bridge over the Hracholusky reservoir<\/title>\n<meta name=\"description\" content=\"Structural engineering software specialist,\u00a0SCIA Engineer\u00a0assists the complex analysis of the replacement bridge over the Hracholusky Reservoir\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Case study: Replacement bridge over the Hracholusky reservoir\" \/>\n<meta property=\"og:description\" content=\"Structural engineering software specialist, SCIA Engineer assists the complex analysis of a difficult construction process on the replacement bridge over the Hracholusky Reservoir\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\" \/>\n<meta property=\"og:site_name\" content=\"Planning, Building &amp; Construction Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PBCToday\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-13T10:32:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-20T16:08:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/01\/Replacement-bridge-over-the-Hracholusky-reservoir.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"750\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steph Blundell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Case study: Replacement bridge over the Hracholusky reservoir\" \/>\n<meta name=\"twitter:description\" content=\"Structural engineering software specialist, SCIA Engineer assists the complex analysis of a difficult construction process on the replacement bridge over the Hracholusky Reservoir\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Steph_PBCToday\" \/>\n<meta name=\"twitter:site\" content=\"@PBC_Today\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\"},\"author\":{\"name\":\"Steph Blundell\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\"},\"headline\":\"Case study: Replacement bridge over the Hracholusky reservoir\",\"datePublished\":\"2021-01-13T10:32:17+00:00\",\"dateModified\":\"2023-06-20T16:08:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\"},\"wordCount\":349,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"keywords\":[\"Bridge construction\",\"Engineering\",\"SH SCIA\"],\"articleSection\":[\"Construction Software News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#respond\"]}],\"copyrightYear\":\"2021\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\",\"name\":\"Case study: Replacement bridge over the Hracholusky reservoir\",\"isPartOf\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\"},\"datePublished\":\"2021-01-13T10:32:17+00:00\",\"dateModified\":\"2023-06-20T16:08:33+00:00\",\"description\":\"Structural engineering software specialist,\u00a0SCIA Engineer\u00a0assists the complex analysis of the replacement bridge over the Hracholusky Reservoir\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pbctoday.co.uk\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case study: Replacement bridge over the Hracholusky reservoir\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#website\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"name\":\"Planning, Building &amp; Construction Today\",\"description\":\"The Latest Planning, Building &amp; Construction News\",\"publisher\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#organization\",\"name\":\"Planning, Building & Construction Today\",\"alternateName\":\"PBC Today\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"contentUrl\":\"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Planning, Building & Construction Today\"},\"image\":{\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/PBCToday\/\",\"https:\/\/x.com\/PBC_Today\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb\",\"name\":\"Steph Blundell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g\",\"caption\":\"Steph Blundell\"},\"description\":\"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk\",\"sameAs\":[\"https:\/\/www.pbctoday.co.uk\",\"https:\/\/www.linkedin.com\/in\/steph-blundell\/\",\"https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday\"],\"url\":\"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Case study: Replacement bridge over the Hracholusky reservoir","description":"Structural engineering software specialist,\u00a0SCIA Engineer\u00a0assists the complex analysis of the replacement bridge over the Hracholusky Reservoir","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/","og_locale":"en_US","og_type":"article","og_title":"Case study: Replacement bridge over the Hracholusky reservoir","og_description":"Structural engineering software specialist, SCIA Engineer assists the complex analysis of a difficult construction process on the replacement bridge over the Hracholusky Reservoir","og_url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/","og_site_name":"Planning, Building &amp; Construction Today","article_publisher":"https:\/\/www.facebook.com\/PBCToday\/","article_published_time":"2021-01-13T10:32:17+00:00","article_modified_time":"2023-06-20T16:08:33+00:00","og_image":[{"width":1000,"height":750,"url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2021\/01\/Replacement-bridge-over-the-Hracholusky-reservoir.jpg","type":"image\/jpeg"}],"author":"Steph Blundell","twitter_card":"summary_large_image","twitter_title":"Case study: Replacement bridge over the Hracholusky reservoir","twitter_description":"Structural engineering software specialist, SCIA Engineer assists the complex analysis of a difficult construction process on the replacement bridge over the Hracholusky Reservoir","twitter_creator":"@https:\/\/twitter.com\/Steph_PBCToday","twitter_site":"@PBC_Today","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#article","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/"},"author":{"name":"Steph Blundell","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb"},"headline":"Case study: Replacement bridge over the Hracholusky reservoir","datePublished":"2021-01-13T10:32:17+00:00","dateModified":"2023-06-20T16:08:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/"},"wordCount":349,"commentCount":0,"publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"keywords":["Bridge construction","Engineering","SH SCIA"],"articleSection":["Construction Software News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#respond"]}],"copyrightYear":"2021","copyrightHolder":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/","url":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/","name":"Case study: Replacement bridge over the Hracholusky reservoir","isPartOf":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#website"},"datePublished":"2021-01-13T10:32:17+00:00","dateModified":"2023-06-20T16:08:33+00:00","description":"Structural engineering software specialist,\u00a0SCIA Engineer\u00a0assists the complex analysis of the replacement bridge over the Hracholusky Reservoir","breadcrumb":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pbctoday.co.uk\/news\/digital-construction-news\/bim-news\/scia-hracholusky-reservoir\/87341\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pbctoday.co.uk\/news\/"},{"@type":"ListItem","position":2,"name":"Case study: Replacement bridge over the Hracholusky reservoir"}]},{"@type":"WebSite","@id":"https:\/\/www.pbctoday.co.uk\/news\/#website","url":"https:\/\/www.pbctoday.co.uk\/news\/","name":"Planning, Building &amp; Construction Today","description":"The Latest Planning, Building &amp; Construction News","publisher":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pbctoday.co.uk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pbctoday.co.uk\/news\/#organization","name":"Planning, Building & Construction Today","alternateName":"PBC Today","url":"https:\/\/www.pbctoday.co.uk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","contentUrl":"https:\/\/www.pbctoday.co.uk\/news\/wp-content\/uploads\/2022\/01\/pbctoday-logo-yoast-seo-organisation-1920-1080-001.jpg","width":1920,"height":1080,"caption":"Planning, Building & Construction Today"},"image":{"@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PBCToday\/","https:\/\/x.com\/PBC_Today"]},{"@type":"Person","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/baf6766a43e70a35cada0c600519a2fb","name":"Steph Blundell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pbctoday.co.uk\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62283f53e7b9ae55cd3516832342b97ce87c86f2c2130dfce68124d194b36df8?s=96&d=mm&r=g","caption":"Steph Blundell"},"description":"Steph is the Senior Digital Editor here at PBC. When she\u2019s not working hard on cranking out first-class content for our online viewers to enjoy, she\u2019s keeping our social media lively and up to date\u2026 you could call her a social media guru? We\u2019re sure she\u2019d like that. With a BA in English and Journalism, Steph isn\u2019t fazed by attention to detail; on the contrary, she enjoys getting her teeth into a good article. In her downtime Steph loves nothing more than getting together with friends to enjoy a few (several) gin and tonics. Think you\u2019ve got some content Steph would be interested in? You can contact her either by phone on (01270) 502876 or by email at sblundell@pbctoday.co.uk","sameAs":["https:\/\/www.pbctoday.co.uk","https:\/\/www.linkedin.com\/in\/steph-blundell\/","https:\/\/x.com\/https:\/\/twitter.com\/Steph_PBCToday"],"url":"https:\/\/www.pbctoday.co.uk\/news\/author\/stephblundell\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-10-24 09:57:35","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/87341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/comments?post=87341"}],"version-history":[{"count":0,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/posts\/87341\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/media?parent=87341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/categories?post=87341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/tags?post=87341"},{"taxonomy":"stakeholder_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/stakeholder_rel_tag?post=87341"},{"taxonomy":"contributor_rel_tag","embeddable":true,"href":"https:\/\/www.pbctoday.co.uk\/news\/wp-json\/wp\/v2\/contributor_rel_tag?post=87341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}